NYC-WTC_000411664
Summary of project cost and scope for BOE air-quality monitoring and eligible costs.
2 shared non-person entities · 1 shared topics · similarity 0.974
machine-extracted · confidence unavailable · Check page ↗Project application summary for PS 833 air quality monitoring costs reimbursement.
NYC-WTC_000411653OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
DATE: 05/15/2003 FEDE°4L EMERGENCY MANAGEMENT AGENC'' JJECT APPLICATION SUMMARY (P.2) DISASTER#: 1391
PACKAGE NO: 86
P.A. ID: 061-51000-22 APPLICANT; NEW YORK / EDUCATION, BOARD OF, EDUCATION, BOARD OF
PW# VSN CAT INF COST SHR PROJECTED COMPL DATE APPROVED PW AMOUNT := s:
803 1 B N N 03/11/2002 5219,472.05 Site Number; 1 DAMAGED AIR / DUST / WATER QUALITY TESTING FACILITY: PS 833 - 100 TRINITY PLACE, NEW YORK, NY 10006 FACILITY LOCATION: THIS PROJECT WORK SHEET REIMBURSES THE BOE $325,071.78 FOR THE ESTIMATED COSTS TO MONITOR THE INTERIOR AND EXTERIOR AIR QUALITY OF PS 833 FROM MARCH 1, 2002 TO JUNE 30, 2002. DUE TO THE SCHOOL'S PROXIMITY TO GROUND ZERO. AND THE POTENTIAL FOR CONTAMINANTS IN THE DUST GENERATED SCOPE OF WORK: BY THE DEBRIS REMOVAL EFFORT, THE AIR MONITORING AND ITS ASSOCIATED COSTS ARE CONSIDERED REASONABLE AND ELIGIBLE UNDER SECTION 403 OF THE STAFFORD ACT,
THE BOE CONTRACTED ATC ASSOCIATES TO PERFORM THE WORK, SPECIFICALLY CONDUCTING INDOOR AND OUTDOOR AIR QUALITY TESTING AS WELL AS WATER AND SURFACE CONTAMINATION TESTING. A TOTAL OF 10 AIR MONITORING STATIONS THAT CONDUCTED 11 AMBIENT AIR TESTS PER DAY WERE ESTABLISHED INSIDE THE SCHOOL BUILDING. AN ADDITIONAL 3 AIR MONITORING STATIONS THAT CONDUCTED 6 AMBIENT AIR TEST PER DAY WERE ESTABLISHED ON THE EXTERIOR OF THE SCHOOL. ADDITIONAL TESTING WAS DONE TO ADDRESS DUST AND WATER CONTAMINATION AS NEEDED. PLEASE SEE THE NARRATIVE FOR THE DETAILS OF WHERE THE AIR TESTING STATIONS WERE LOCATED, HOW MANY TESTS WERE COMPLETED PER DAY AT EACH MONITORING STATION, AND THE PARAMETERS OF THE TESTING. THE BOE HAS NOT BEEN INVOICED FOR ACTUAL COSTS, AND THEREFORE THE DOLLAR AMOUNT IN THIS PW IS BASED ON AN ESTIMATE PROVIDED BY THE APPLICANT'S VENDOR, ATC ASSOCIATES (ATTACHED TO THIS PW).
WORK COMPLETE CONSISTS OF EXPENSES FROM MARCH 1, 2002 TO APRIL 22, 2002 BY ATC ASSOCIATES AT PS 833 FOR A COST OF $139,780.87.
WORK TO BE COMPLETED CONSISTS OF EXPENSES FROM APRIL 23, 2002 TO JUNE 30, 2002 (THE END OF THE SCHOOL YEAR) BY ATC ASSOCIATES AT PS 833 FOR A COST OF $185,290.91. ATC WILL CONDUCT THE SAME INTERIOR AND EXTERIOR AIR QUALITY TESTING, AS WELL AS DUST AND WATER TESTING AS DESCRIBED ABOVE DURING THIS TIME PERIOD.
"VERSION 1 - ""VERSION 1
WORK COMPLETE CONSISTED OF THE ACTUAL EXPENSES INCURRED BY THE NEW YORK CITY BOARD OF EDUCATION (BOE) FOR THE WORK PERFORMED BY ATC ASSOCIATES, A CONTRACTOR TO BOE AT PUBLIC SCHOOL 83 3 (PS 833, ALSO REFERRED TO AS PS 489) COMMONLY CALLED THE HIGH SCHOOL OF ECONOMICS AND FINANCE THE TOTAL ELIGIBLE WORK FROM JANUARY TO SEPTEMBER 2002 IS A COMPILATION OF FOUR PAYMENTS (THAT ARE ATTACHED TO THIS PROJECT WORKSHEET) AND TOTAL TO $634,472.45. PW 807 AND 808 WERE BASED ON ESTIMATES AND PROVIDED THE APPLICANT WITH FUNDS TO PERFORM THE WORK AT PS 833 TOTALING $415,000.40. LEAVING A DIFFERENCE OF $219,472.05, WHICH IS THE TOTAL ELIGIBLE ADDITIONAL CONTRACT COST FUNDED UNDER THIS PW. THESE ACTUAL INVOICES INCLUDE THE FOLLOWING:
PAYMENT #2 INCLUDES TECHNICAL SERVICES COSTS, EQUIPMENT COSTS AND SAMPLE ANALYSES COSTS TO CONDUCT AIR QUALITY TESTING FROM JANUARY TO FEBRUARY 2002. AS A RESULT OF A BOE DESK AUDIT THE PAYMENT OF THIS VOUCHER WAS REDUCED FROM $87,215.20 TO $84,085.20. THE TOTAL ELIGIBLE CONTRACT COST FRO PAYMENT #2 WAS $84,085.20.
PAYMENT #7 INCLUDES TECHNICAL SERVICES COSTS, EQUIPMENT COSTS AND SAMPLE ANALYSES COSTS TO CONDUCT AIR QUALITY TESTING FROM MARCH TO APRIL 2002. THE TOTAL ELIGIBLE CONTRACT COST FOR PAYMENT #7 WAS $279,817.25.
PAYMENT #13 INCLUDES TECHNICAL SERVICES COSTS, EQUIPMENT COSTS AND SAMPLE ANALYSES COSTS TO CONDUCT AIR QUALITY TESTING FROM MAY TO JUNE 2002. THE TOTAL ELIGIBLE CONTRACT COST FOR PAYMENT #13 WAS $259,440.00.
PAYMENT #22 INCLUDES TECHNICAL SERVICES COSTS. EQUIPMENT COSTS AND SAMPLE ANALYSES COSTS TO CONDUCT AIR QUALITY TESTING FROM JULY TO SEPTEMBER 10, 2002. THE TOTAL ELIGIBLE CONTRACT COST =OR PAYMENT #22 WAS $11,130.00.
TOTAL ELIGIBLE ADDITIONAL CONTRACT COSTS INCURRED BY THE APPLICANT TOTAL $219,472.05.
1 PW $ AMOUNT ELIGIBLE $ FEDERAL SHARE
F’Ws 5219.472.05 $219,472.05 Page 3 of 8
CONFIDENTIAL INSURANCE INFORMATION, CITY_21MC1OO_OO7969887
SUBJECT TO PROTECTIVE ORDER NO. 2, SEPT. 2008
NYC-WTC_000411653
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
NYC-WTC_000411664
Summary of project cost and scope for BOE air-quality monitoring and eligible costs.
2 shared non-person entities · 1 shared topics · similarity 0.974
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000411654
Project worksheet for indoor/outdoor air testing at PS 833, monitoring costs Mar–Jun 2002.
2 shared non-person entities · 1 shared topics · similarity 0.962
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000411650
OMB disclosure notice accompanying FEMA project worksheets.
1 shared non-person entities · 1 shared topics · similarity 0.950
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000411669
Emergency Management project worksheet for BOE air monitoring costs at PS 234.
2 shared non-person entities · 1 shared topics · similarity 0.949
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000411662
Project worksheet reimbursing BOE for air quality monitoring at PS 894, Jan–Jun 2002.
2 shared non-person entities · 1 shared topics · similarity 0.919
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000411651
Narrative on air and dust testing at PS 833; funding and reimbursement notes.
1 shared non-person entities · 1 shared topics · similarity 0.910
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000302276
Project worksheet for air quality monitoring at PS 833, Trinity Place, NYC, related to WTC debris dust mitigation.
2 shared non-person entities · 1 shared topics · similarity 0.995
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000385900
OMB burden disclosure notice accompanying project worksheets.
1 shared non-person entities · 1 shared topics · similarity 0.948
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000219968
Federal Emergency Management Agency worksheet documenting a disaster declaration and administrative details for the New York City Board of Education in March 2003.
1 shared non-person entities · 1 shared topics · similarity 0.932
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000385880
Narrative describing air, water testing and related costs at PS 894 (PS 425).
1 shared non-person entities · 1 shared topics · similarity 0.916
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000385879
Narrative of air, water testing costs and contractor payments for PS 894.
1 shared topics · similarity 0.911
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000453583
Project worksheet detailing payments for ATC services and air quality testing at PS 894/PS 425.
1 shared topics · similarity 0.910
machine-extracted · confidence unavailable · Check page ↗Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
NYC-WTC_000302276
Project worksheet for air quality monitoring at PS 833, Trinity Place, NYC, related to WTC debris dust mitigation.
Similarity score 0.997 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000385900
OMB burden disclosure notice accompanying project worksheets.
Similarity score 0.974 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000219968
Federal Emergency Management Agency worksheet documenting a disaster declaration and administrative details for the New York City Board of Education in March 2003.
Similarity score 0.966 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000385879
Narrative of air, water testing costs and contractor payments for PS 894.
Similarity score 0.956 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000453583
Project worksheet detailing payments for ATC services and air quality testing at PS 894/PS 425.
Similarity score 0.955 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000243517
Mayor's OEM/OMB form approving PW obligation; notes on funding and extensions.
Similarity score 0.951 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
Project worksheet for air quality monitoring at PS 833, Trinity Place, NYC, related to WTC debris dust mitigation.
Similar indexed content
NYC-WTC_000411664
Summary of project cost and scope for BOE air-quality monitoring and eligible costs.
Similar indexed content
NYC-WTC_000411654
Project worksheet for indoor/outdoor air testing at PS 833, monitoring costs Mar–Jun 2002.
Similar indexed content
NYC-WTC_000411650
OMB disclosure notice accompanying FEMA project worksheets.
Similar indexed content
NYC-WTC_000411669
Emergency Management project worksheet for BOE air monitoring costs at PS 234.
Similar indexed content