NYC-WTC_000411641
FEDERAL EMA grants summary for PS 234 cleanup costs; site location provided.
4 shared non-person entities · 1 shared topics · similarity 0.975
machine-extracted · confidence unavailable · Check page ↗FEMA/BOE cost summary for BOE project at 201 Warren Street, including remediation and restoration expenses.
NYC-WTC_000411645OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
Dale: 07/01/2003 FEDERAL EMERGENCY MANAGEMENT AGENCY Project Completion and Certification Report (P.4) Disaster#: 1391
P.A. ID: 061-51000-22 Applicant: NEW YORK / EDUCATION, BOARD OF EDUC PW# VSN PKG# INF Cat Work Projected Approved PW % Actual Date Amt. Claimed Comments Done By Compl. Date Amt. Compl. Completed by Applicant af In^n _______________ __________________ ______________
732 1 95 N E 03/11/2003 ($1,207,576.76) 100% 04/21/2003 S
SITE NUMBER : 1 FACILITY NAME ; NYC BOARD OF EDUCATION w G LOCATION 201 WARREN STREET, NEW YORK10282 K G SCOPE OF WORK WORK COMPLETE CONSISTS OF THE EXPENSES INCURRED BY THE NEW YORK CITY. BOARD OF EDUCATION (BOE) FOR THE M O O V/ORK PERFORMED BY THE SCHOOL CONSTRUCTION AUTHORITY (SCA). SCA WILL BE SUBMITTING ALL COSTS TO THE BOE FOR H O REIMBURSEMENT. THESE COSTS INCLUDE THE CONTRACTUAL WORK FOR REMEDIATION AND RESTORATION OF PS/IS 89 ON THE a BASIS OF DESIGN, CAPACITY AND FUNCTION OF THE FACILITY PRIOR TO THE DISASTER AND IN CONFORMITY WITH APPLICABLE H a O H STANDARDS. o •G SCHOOL CONSTRUCTION AUTHORITY WAS RESPONSIBLE FOR THE COORDINATION AND CONSTRUCTION MANAGEMENT OF THE XI O H CONTRACTORS PERFORMING WORK AT PS/IS 89 RELATED TO THE COLLAPSE OF WTC. COSTS ASSOCIATED WITH THE WORK H H PERFORMED BY SCA CONSISTS OF REGULAR TIME LABOR ($2,139.05), INCLUDING THE NEW YORK CITY REGULAR TIME FRINGE O t-* BENEFIT RATE FOR NON-UNIFORM EMPLOYEES OF 44.66% ($955.30). TOTAL INCURRED COST FOR REGULAR TIME LABOR IS H $3,094.35. COSTS ASSOCIATED WITH THE OVERTIME FOR LABOR FOR SCA ($6,030.13), INCLUDING THE NEW YORK CITY OVERTIME I—I FRINGE BENEFIT RATE FOR NON-UNIFORM EMPLOYEES OF 10.73% ($647.04). TOTAL INCURRED COST FOR OVERTIME LABOR IS G CO $3,677.17. G O 33 a M 33 Io SCA RETAINED 6 SUBCONTRACTORS TO PERFORM DUTIES NECESSARY TO REMEDIATE AND RESTORE PS/IS 89 TO ITS PRE-DISASTER CONDITION. AIR TECH LAB, INC. (AIR TECH) PERFORMED CLEAN UP AND REMEDIATION OPERATIONS OF THE INTERIOR OF THE BUILDING. CORINTHIAN CONSTRUCTION COMPANY, INC. ( CORINTHIAN) CLEANED DEBRIS AND DUST FROM THE EXTERIOR FACADE, ROOF, THE COURTYARD AND PLAYGROUND. IN ADDITION, CORINTHIAN REMOVED GRAVEL FROM THE ROOF, S H THE ROOF MEMBRANE WAS THEN PRESSURE WASHED, AND NEW GRAVEL WAS PLACED ON THE ROOF. V&R MECHANICAL INC. O a (V&R) CLEANED THE HVAC SYSTEM OF DUST AND DEBRIS. ATC ASSOCIATES, INC. (ATO) CONDUCTED QUALITY CONTROL AIR a o MONITORING AND ANALYTICAL SERVICES, AS WELL AS VISUAL INSPECTIONS TO DETERMINE THE PRESENCE OF FINE to 33 PARTICULATE DUST. NEW YORK ENVIRONMENTAL CONDUCTED AGGRESSIVE SAMPLING AND TRANSMISSION ELECTRON MICROSCOPY (TEM) ANALYSIS OF SEVERAL FLOORS AND W H THE HVAC UNIT. TDX CONSTRUCTION CORPORATION (TDX) PERFORMED CONSTRUCTION OVERSIGHT OF ALL CONTRACTUAL H 33 ACTIVITIES TO INSURE QUALITY OF WORK. TOTAL CONTRACTUAL COSTS SUBMITTED TO BOE FROM SCA FOR THIS PROJECT O G a WORKSHEET IS $1,297,805.24.
to SEE NARRATIVE FOR DETAILED DESCRIPTION OF THE WORK PERFORMED BY SCA AND EACH CONTRACTOR, AS WELL AS THEIR o RESPECTIVE COSTS o co TOTAL COSTS ASSOCIATED WITH THIS PROJECT WORKSHEET FOR CONTRACTUAL WORK AND LABOR IS $1,307,576.76.“VERSION 1 O H k: 0000 ’*** VERSION 1 ***‘ I ro THIS FINAL PW IS BEING WRITTEN TO DEOBLIGATE $1,207,576.76 FOR ANTICIPATED INSURANCE PROCEEDS. S O Total for 2 PWs ($1,262,208.10) $ o Subgrantee Admin: ($6,311.04) 1 o Grand Total: ($1,268,519,14)
Pane 2 of 21 CO O
NYC-WTC_000411645
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
NYC-WTC_000411641
FEDERAL EMA grants summary for PS 234 cleanup costs; site location provided.
4 shared non-person entities · 1 shared topics · similarity 0.975
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000243508
FEMA project summary for PS 234 school clean-up at Greenwich Street.
4 shared non-person entities · 1 shared topics · similarity 0.973
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000243514
Summary of FEMA disaster costs for PS 234 school cleanup project.
4 shared non-person entities · 1 shared topics · similarity 0.964
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000243505
FEMA/BOE project summary for PS 234 school clean-up at 292 Greenwich Street.
4 shared non-person entities · 1 shared topics · similarity 0.962
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000411644
FEMA project worksheet for PS 89 remediation under disaster 1391.
4 shared non-person entities · 1 shared topics · similarity 0.957
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000243511
FEMA project summary for PS 234 school cleanup at 292 Greenwich Street.
4 shared non-person entities · 1 shared topics · similarity 0.954
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000411638
FEMA project summary for PS 234 site mitigation and cost reimbursement.
4 shared non-person entities · 1 shared topics · similarity 0.954
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000251592
Emergency management project summary for NYC Board of Education disaster costs at PS/IS 89, 2017.
4 shared non-person entities · 1 shared topics · similarity 0.974
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000279707
P.A. ID, site number, location, scope of work for PS 234 remediation and BOE res**
4 shared non-person entities · 1 shared topics · similarity 0.965
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000263576
MBO document: FEMA disaster grant application summary for BOE remediation at Warren Street project.
4 shared non-person entities · 1 shared topics · similarity 0.958
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000267441
FEMA disaster project data for New York City Education Board site remediation and SCA work.
4 shared non-person entities · 1 shared topics · similarity 0.956
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000279710
Project application summary for FEMA disaster 1391; reveals site and cost figures.
4 shared non-person entities · 1 shared topics · similarity 0.953
machine-extracted · confidence unavailable · Check page ↗Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
NYC-WTC_000411641
FEDERAL EMA grants summary for PS 234 cleanup costs; site location provided.
Similarity score 0.986 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000251592
Emergency management project summary for NYC Board of Education disaster costs at PS/IS 89, 2017.
Similarity score 0.985 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000243508
FEMA project summary for PS 234 school clean-up at Greenwich Street.
Similarity score 0.985 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000263576
MBO document: FEMA disaster grant application summary for BOE remediation at Warren Street project.
Similarity score 0.984 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000411641
FEDERAL EMA grants summary for PS 234 cleanup costs; site location provided.
Similarity score 0.982 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000243508
FEMA project summary for PS 234 school clean-up at Greenwich Street.
Similarity score 0.981 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000411641
FEDERAL EMA grants summary for PS 234 cleanup costs; site location provided.
Similar indexed content
NYC-WTC_000251592
Emergency management project summary for NYC Board of Education disaster costs at PS/IS 89, 2017.
Similar indexed content
NYC-WTC_000243508
FEMA project summary for PS 234 school clean-up at Greenwich Street.
Similar indexed content
NYC-WTC_000279707
P.A. ID, site number, location, scope of work for PS 234 remediation and BOE res**
Similar indexed content
NYC-WTC_000243514
Summary of FEMA disaster costs for PS 234 school cleanup project.
Similar indexed content