NYC-WTC_000279707
P.A. ID, site number, location, scope of work for PS 234 remediation and BOE res**
5 shared non-person entities · 1 shared topics · similarity 0.975
machine-extracted · confidence unavailable · Check page ↗Emergency management project summary for NYC Board of Education disaster costs at PS/IS 89, 2017.
NYC-WTC_000251592–000251593OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
Date: 07/17/2002 FEDERAL EMERGENCY MANAGEMENT AGENCY Project Completion and Certification Report (P.4) Disaster#: 1391
P.A. 10:061-51000-22 Appiicant: NEW YORK / EDUCATION, BOARD OF EDUC PW# VSN PKG# INF Cat Work Projected Approved PW % Actual Date Amt. Claimed Comments Done By Compl. Date Amt. Compl. Completed by Applicant at insp.
732 0 45 NE 03/11/2003 $1,307,576.76 100% $
SITE NUMBER ; 1 FACILITY NAME ; NYC BOARD OF EDUCATION LOCATION 201 WARREN STREET, NEW YORK10282 W G SCOPE OF WORK WORK COMPLETE CONSISTS OF THE EXPENSES INCURRED BY THE NEW YORK CITY, BOARD OF EDUCATION (BOE) FOR THE WORK K PERFORMED BY THE SCHOOL CONSTRUCTION AUTHORITY (SCA). SCA WILL BE SUBMITTING ALL COSTS TO THE BOE FOR G M REIMBURSEMENT. THESE COSTS INCLUDE THE CONTRACTUAL WORK FOR REMEDIATION AND RESTORATION OF PS/IS 89 ON THE n n BASIS OF DESIGN, CAPACITY AND FUNCTION OF THE FACILITY PRIOR TO THE DISASTER AND IN CONFORMITY WITH APPLICABLE H o STANDARDS. s H O SCHOOL CONSTRUCTION AUTHORITY WAS RESPONSIBLE FOR THE COORDINATION AND CONSTRUCTION MANAGEMENT OF THE a CONTRACTORS PERFORMING WORK AT PS/IS 89 RELATED TO THE COLLAPSE OF WTC. COSTS ASSOCIATED WITH THE WORK 2 H PERFORMED BY SCA CONSISTS OF REGULAR TIME LABOR ($2,139.05), INCLUDING THE NEW YORK CITY REGULAR TIME FRINGE 2 2 O H BENEFIT RATE FOR NON-UNIFORM EMPLOYEES OF 44.66% ($955.30). TOTAL INCURRED COST FOR REGULAR TIME LABOR IS H $3,094.35. COSTS ASSOCIATED WITH THE OVERTIME FOR LABOR FOR SCA ($6,030.13), INCLUDING THE NEW YORK CITY OVERTIME M FRINGE BENEFIT RATE FOR NON-UNIFORM EMPLOYEES OF 10.73% ($647.04). TOTAL INCURRED COST FOR OVERTIME LABOR IS O $6,677.17. H S SCA RETAINED 6 SUBCONTRACTORS TO PERFORM DUTIES NECESSARY TO REMEDIATE AND RESTORE PS/IS 89 TO ITS w PRE-DISASTER CONDITION. AIR TECH LAB, INC. (AIR TECH) PERFORMED CLEAN UP AND REMEDIATION OPERATIONS OF THE G INTERIOR OF THE BUILDING. CORINTHIAN CONSTRUCTION COMPANY, INC. ( CORINTHIAN) CLEANED DEBRIS AND DUST FROM THE §O M I o EXTERIOR FACADE, ROOF, THE COURTYARD AND PLAYGROUND. IN ADDITION, CORINTHIAN REMOVED GRAVEL FROM THE ROOF THE ROOF MEMBRANE WAS THEN PRESSURE WASHED, AND NEW GRAVEL WAS PLACED ON THE ROOF. V&R MECHANICAL INC (V&R) CLEANED THE HVAC SYSTEM OF DUST AND DEBRIS. ATC ASSOCIATES, INC. (ATC) CONDUCTED QUALITY CONTROL AIR 2 MONITORING AND ANALYTICAL SERVICES, AS WELL AS VISUAL INSPECTIONS TO DETERMINE THE PRESENCE OF FINE 2 PARTICULATE DUST. NEW YORK ENVIRONMENTAL CONDUCTED AGGRESSIVE SAMPLING AND TRANSMISSION ELECTRON O 2 MICROSCOPY (TEM) ANALYSIS OF SEVERAL FLOORS AND TH 2 SCOPE OF WORK E HVAC UNIT. TDX CONSTRUCTION CORPORATION (TDX) PERFORMED CONSTRUCTION OVERSIGHT OF ALL CONTRACTUAL § ACTIVITIES TO INSURE QUALITY OF WORK. TOTAL CONTRACTUAL COSTS SUBMITTED TO BOE FROM SCA FOR THIS PROJECT WORKSHEET IS $1,297,805.24. w H M SEE NARRATIVE FOR DETAILED DESCRIPTION OF THE WORK PERFORMED BY SCA AND EACH CONTRACTOR, AS WELL AS THEIR 2 O RESPECTIVE COSTS. H 2 TOTAL COSTS ASSOCIATED WITH THIS PROJECT WORKSHEET FOR CONTRACTUAL WORK AND LABOR IS $1,307,576.76. O O Total for 3 PWs $4,093,112.81 $ CO
o Sdbgrantee Admin: $20,465.57 H Grand Total: $4,113,578.38 l"^
s o CERTIFICATION o 1 I HEREBY CERTIFY THAT TO THE BEST OF MY KNOWLEDGE AND BELIEF o I CERTIFY THAT ALL FUNDS WERE EXPENDED IN ACCORDANCE G ALL WORK AND COSTS CLAIMED ARE ELIGIBLE IN ACCORDANCE WITH THE WITH THE PROVISIONS OF THE FEMA-STATE AGREEMENT AND o Page 3 of 3 CO co o
NYC-WTC_000251593
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
NYC-WTC_000279707
P.A. ID, site number, location, scope of work for PS 234 remediation and BOE res**
5 shared non-person entities · 1 shared topics · similarity 0.975
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000279710
Project application summary for FEMA disaster 1391; reveals site and cost figures.
4 shared non-person entities · 1 shared topics · similarity 0.975
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000263574
Emergency management project summary for BOE facility at 201 Warren Street.
4 shared non-person entities · 1 shared topics · similarity 0.970
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000267441
FEMA disaster project data for New York City Education Board site remediation and SCA work.
5 shared non-person entities · 1 shared topics · similarity 0.963
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000411641
FEDERAL EMA grants summary for PS 234 cleanup costs; site location provided.
5 shared non-person entities · 1 shared topics · similarity 0.986
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000243505
FEMA/BOE project summary for PS 234 school clean-up at 292 Greenwich Street.
4 shared non-person entities · 1 shared topics · similarity 0.986
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000243508
FEMA project summary for PS 234 school clean-up at Greenwich Street.
5 shared non-person entities · 1 shared topics · similarity 0.986
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000411638
FEMA project summary for PS 234 site mitigation and cost reimbursement.
4 shared non-person entities · 1 shared topics · similarity 0.976
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000243514
Summary of FEMA disaster costs for PS 234 school cleanup project.
4 shared non-person entities · 1 shared topics · similarity 0.975
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000243511
FEMA project summary for PS 234 school cleanup at 292 Greenwich Street.
4 shared non-person entities · 1 shared topics · similarity 0.975
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000411645
FEMA/BOE cost summary for BOE project at 201 Warren Street, including remediation and restoration expenses.
4 shared non-person entities · 1 shared topics · similarity 0.974
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000411644
FEMA project worksheet for PS 89 remediation under disaster 1391.
4 shared non-person entities · 1 shared topics · similarity 0.974
machine-extracted · confidence unavailable · Check page ↗Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
NYC-WTC_000243508
FEMA project summary for PS 234 school clean-up at Greenwich Street.
Similarity score 0.998 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000411641
FEDERAL EMA grants summary for PS 234 cleanup costs; site location provided.
Similarity score 0.997 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000411641
FEDERAL EMA grants summary for PS 234 cleanup costs; site location provided.
Similarity score 0.988 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000279707
P.A. ID, site number, location, scope of work for PS 234 remediation and BOE res**
Similarity score 0.986 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000243514
Summary of FEMA disaster costs for PS 234 school cleanup project.
Similarity score 0.985 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000411645
FEMA/BOE cost summary for BOE project at 201 Warren Street, including remediation and restoration expenses.
Similarity score 0.985 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000411641
FEDERAL EMA grants summary for PS 234 cleanup costs; site location provided.
Similar indexed content
NYC-WTC_000243505
FEMA/BOE project summary for PS 234 school clean-up at 292 Greenwich Street.
Similar indexed content
NYC-WTC_000243508
FEMA project summary for PS 234 school clean-up at Greenwich Street.
Similar indexed content
FEMA project summary for PS 234 site mitigation and cost reimbursement.
Similar indexed content
NYC-WTC_000279707
P.A. ID, site number, location, scope of work for PS 234 remediation and BOE res**
Similar indexed content