NYC 9/11 Public Portal Document
DATE: 07/01/2003 FEP'^"4L EMERGENCY MANAGEMENT AGEM'"' □JECT APPLICATION SUMMARY (P.2 DISASTER#: 1391
PACKAGE NO: S5
P.A. ID: 061-51000-22 APPLICANT: NEW YORK / EDUCATION, BOARD OF, EDUCATION, BOARD OF pw# VSN CAT INF COST SHR PROJECTED COMPL DATE APPROVED PW AMOUNT
732 1 E N N 03/11/2003 ($1,207,576.76) Site Number; 1 DAMAGED NYC BOARD OF EDUCATION FACILITY: 201 WARREN STREET, NEW YORK10282 FACILITY LOCATION: WORK COMPLETE CONSISTS OF THE EXPENSES INCURRED BY THE NEW YORK CITY, BOARD OF EDUCATION (BOE) FOR THE WORK PERFORMED BY THE SCHOOL CONSTRUCTION AUTHORITY (SCA). SCA WILL BE SUBMITTING ALL COSTS TO THE BOE FOR REIMBURSEMENT. THESE COSTS INCLUDE THE CONTRACTUAL SCOPE OF WORK: WORK FOR REMEDIATION AND RESTORATION OF PS/IS 89 ON THE BASIS OF DESIGN, CAPACITY AND FUNCTION OF THE FACILITY PRIOR TO THE DISASTER AND IN CONFORMITY WITH APPLICABLE STANDARDS.
SCHOOL CONSTRUCTION AUTHORITY WAS RESPONSIBLE FOR THE COORDINATION AND CONSTRUCTION MANAGEMENT OF THE CONTRACTORS PERFORMING WORK AT PS/IS 89 RELATED TO THE COLLAPSE OF WTC. COSTS ASSOCIATED WITH THE WORK PERFORMED BY SCA CONSISTS OF REGULAR TIME LABOR ($2,139.05), INCLUDING THE NEW YORK CITY REGULAR TIME FRINGE BENEFIT RATE FOR NON-UNIFORM EMPLOYEES OF 44.66% ($955.30). TOTAL INCURRED COST FOR REGULAR TIME LABOR IS $3,094.35. COSTS ASSOCIATED WITH THE OVERTIME FOR LABOR FOR SCA ($6,030.13). INCLUDING THE NEW YORK CITY OVERTIME FRINGE BENEFIT RATE FOR NON-UNIFORM EMPLOYEES OF 10.73% ($647.04). TOTAL INCURRED COST FOR OVERTIME LABOR IS $6,677.17.
SCA RETAINED 6 SUBCONTRACTORS TO PERFORM DUTIES NECESSARY TO REMEDIATE AND RESTORE PS/IS 89 TO ITS PRE-DISASTER CONDITION. AIR TECH LAB, INC. (AIR TECH) PERFORMED CLEAN UP AND REMEDIATION OPERATIONS OF THE INTERIOR OF THE BUILDING. CORINTHIAN CONSTRUCTION COMPANY, INC, ( CORINTHIAN) CLEANED DEBRIS AND DUST FROM THE EXTERIOR FACADE, ROOF, THE COURTYARD AND PLAYGROUND, IN ADDITION, CORINTHIAN REMOVED GRAVEL FROM THE ROOF, THE ROOF MEMBRANE WAS THEN PRESSURE WASHED, AND NEW GRAVEL WAS PLACED ON THE ROOF. V&R MECHANICAL INC. (V&R) CLEANED THE HVAC SYSTEM OF DUST AND DEBRIS. ATC ASSOCIATES, INC. (ATC) CONDUCTED QUALITY CONTROL AIR MONITORING AND ANALYTICAL SERVICES, AS WELL AS VISUAL INSPECTIONS TO DETERMINE THE PRESENCE OF FINE PARTICULATE DUST. NEW YORK ENVIRONMENTAL CONDUCTED AGGRESSIVE SAMPLING AND TRANSMISSION ELECTRON MICROSCOPY (TEM) ANALYSIS OF SEVERAL FLOORS AND THE HVAC UNIT. TDX CONSTRUCTION CORPORATION (TDX) PERFORMED CONSTRUCTION OVERSIGHT OF ALL CONTRACTUAL ACTIVITIES TO INSURE QUALITY OF WORK. TOTAL CONTRACTUAL COSTS SUBMITTED TO BOE FROM SCA FOR THIS PROJECT WORKSHEET IS $1,297,805.24.
SEE NARRATIVE FOR DETAILED DESCRIPTION OF THE WORK PERFORMED BY SCA AND EACH CONTRACTOR, AS WELL AS THEIR RESPECTIVE COSTS.
TOTAL COSTS ASSOCIATED WITH THIS PROJECT WORKSHEET FOR CONTRACTUAL WORK AND LABOR IS $1,307,576.76."VERSION 1 -
0000 **** VERSION 1
THIS FINAL PW IS BEING WRITTEN TO DEOBLIGATE $1,207,576,76 FOR ANTICIPATED INSURANCE PROCEEDS,
Page 100 of Ifil
CONFIDENTIAL INSURANCE INFORMATION, CITY_21MC100_007969800
SUBJECT TO PROTECTIVE ORDER NO. 2, SEPT. 2008
NYC-WTC_000411644
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
NYC-WTC_000243505
FEMA/BOE project summary for PS 234 school clean-up at 292 Greenwich Street.
4 shared non-person entities · 1 shared topics · similarity 0.979
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000243508
FEMA project summary for PS 234 school clean-up at Greenwich Street.
4 shared non-person entities · 1 shared topics · similarity 0.964
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000411641
FEDERAL EMA grants summary for PS 234 cleanup costs; site location provided.
4 shared non-person entities · 1 shared topics · similarity 0.963
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000411638
FEMA project summary for PS 234 site mitigation and cost reimbursement.
4 shared non-person entities · 1 shared topics · similarity 0.962
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000243511
FEMA project summary for PS 234 school cleanup at 292 Greenwich Street.
4 shared non-person entities · 1 shared topics · similarity 0.962
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000243514
Summary of FEMA disaster costs for PS 234 school cleanup project.
4 shared non-person entities · 1 shared topics · similarity 0.957
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000411645
FEMA/BOE cost summary for BOE project at 201 Warren Street, including remediation and restoration expenses.
4 shared non-person entities · 1 shared topics · similarity 0.957
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000263574
Emergency management project summary for BOE facility at 201 Warren Street.
4 shared non-person entities · 1 shared topics · similarity 0.979
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000251592
Emergency management project summary for NYC Board of Education disaster costs at PS/IS 89, 2017.
4 shared non-person entities · 1 shared topics · similarity 0.974
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000279710
Project application summary for FEMA disaster 1391; reveals site and cost figures.
4 shared non-person entities · 1 shared topics · similarity 0.958
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000279707
P.A. ID, site number, location, scope of work for PS 234 remediation and BOE res**
4 shared non-person entities · 1 shared topics · similarity 0.954
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000263576
MBO document: FEMA disaster grant application summary for BOE remediation at Warren Street project.
4 shared non-person entities · 1 shared topics · similarity 0.940
machine-extracted · confidence unavailable · Check page ↗Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
NYC-WTC_000263574
Emergency management project summary for BOE facility at 201 Warren Street.
Similarity score 0.994 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000411638
FEMA project summary for PS 234 site mitigation and cost reimbursement.
Similarity score 0.986 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000243505
FEMA/BOE project summary for PS 234 school clean-up at 292 Greenwich Street.
Similarity score 0.986 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000243505
FEMA/BOE project summary for PS 234 school clean-up at 292 Greenwich Street.
Similarity score 0.986 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000243505
FEMA/BOE project summary for PS 234 school clean-up at 292 Greenwich Street.
Similarity score 0.986 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000279710
Project application summary for FEMA disaster 1391; reveals site and cost figures.
Similarity score 0.986 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000243505
FEMA/BOE project summary for PS 234 school clean-up at 292 Greenwich Street.
Similar indexed content
NYC-WTC_000263574
Emergency management project summary for BOE facility at 201 Warren Street.
Similar indexed content
NYC-WTC_000251592
Emergency management project summary for NYC Board of Education disaster costs at PS/IS 89, 2017.
Similar indexed content
NYC-WTC_000243508
FEMA project summary for PS 234 school clean-up at Greenwich Street.
Similar indexed content
NYC-WTC_000411641
FEDERAL EMA grants summary for PS 234 cleanup costs; site location provided.
Similar indexed content