Asbestos inspection and sampling report, Millennium Hilton, Oct 2001

Machine-extracted title · confidence 55%

Inspection and sampling report for asbestos at Millennium Hilton Hotel, prepared for client.

NYC-WTC_000408692–000408698
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

MILLENNIUM HILTON HOTEL ASBESTOS INSPECTION AND SAMPLING

2.0 PURPOSE/INTENT CONFIDENTIAL The Millennium Hilton Hotel is planning a restoration of the services after the events related to theWorld Trade Center disaster on September 11, 2001. TL was retained by Bovis Lend Lease LMB, Inc. to perform the evaluation of the Indoor Air Quality inn the Hotel building. The asbestos inspection, air sampling and bulk sampling for asbestos contain, if any, were performed during this evaluation.

3.0 INSPECTION

An inspection of the site was performed on September 20 and 28 to 30, 2001 by Boris Feldman, Tej Chhetry, Mikhail Sokolinskiy and Oleg Koledenkov of Testwell Laboratories, Inc. (TL). All TL persona] is licensed by the New York State Department of Labor (NYS DOL) and New York City Department of Environmental Protection (NYC DEP) to perform work with asbestos containing materials. Credentials of TL personal are attached in Appendix C of this report.

The following observations were made during the inspection:

• The Millennium Hilton Hotel was built in 1992, and the possibility that ACM were used during the construction is very small.

• Severe damage to the building is noticed on floors from 1 (Lobby) to 5, where almost all exterior glass on the west fa9ade is broken. Broken glass was observed throughout the west facade up to the 53"* floor (R. 5303).

• The heaviest accumulation of the dust and debris in the building’s corridors on the guest rooms floors was observed at the elevators lobbies and the staircases. Some of the windows in the guest rooms were opened at the time of WTC collapse, which also caused heavy dust and debris contamination.

• As per building personnel statement, the building’s HVAC system was in operation during and right after the WTC collapse.

Existing building interior condition photographs during the TL inspection are attached in the Appendix B of this report.

4.0 SAMPLING OF SUSPECT MATERIALS

Bulk sampling of suspect ACM was performed in accordance with protocol contained in the Asbestos Hazard Emergency Response Act of 1986 (40 CFR 763 AHERA). Unless othenvise noted, a minimum of three (3) samples was collected from each type of homogeneous material identified.

Page 6

CONFIDENTIAL, SUBJECTTO PROTECTIVE ORDER NO. 1, JAN. 2013

CITY_DEP_WORBY_CANNATA_SUBP_000000607

NYC-WTC_000408697

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000408697Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000408722

Air sampling data sheets and chain of custody for Millennium Hilton report.

Similar indexed content

NYC-WTC_000229717

Appendix containing laboratory analysis data sheets and chain of custody forms for asbestos sampling at the Millennium Hilton Hotel.