Air sample results for 55 Church Street, undated

Machine-extracted title · confidence 100%

Laboratory report from Testwell Laboratories presenting air sample results for the facility at 55 Church Street.

NYC-WTC_000103889–000104025

Folder label: “20 DEY STREET Block: 80 Lot: 4 BIN: 1075702 Millenium Hiton, 41-51 Church St, 172-184 Fulton St

Page image
Scanned page image, NYC-WTC_000103897
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

MILLENNIUM HILTON HOTEL ASBESTOS INSPECTION AND SAMPLING

2.0 PURPOSEANTENT C The Millennium Hilton Hotel is planning a restoration of the services after the events related to theWorld Trade Center disaster on September 11, 2001. TL was retained by Bovis Lend Lease LMB, Inc. to perform the evaluation of the Indoor Air Quality inn the Hotel building. The asbestos inspection, air sampling and bulk sampling for asbestos contain, if any, were performed during this evaluation. ♦

3.0 INSPECTION

♦ An inspection of the site was performed on September 20 and 28 to 30, 2001 by Boris Feldman, Tej Chhetry, Mikhail Sokolinskiy and Oleg Koledenkov of Testwell Laboratories, Inc. (TL). All TL personal is licensed by the New York State Department of Labor (NYS DOL) and New York City Department of Environmental Protection (NYC DEP) to perform work with asbestos containing materials. Credentials of TL personal are attached in Appendix C of this report.

The following observations were made during the inspection:

• The Millennium Hilton Hotel was built in 1992, and the possibility that ACM were used during the construction is very small. 0 • Severe damage to the building is noticed on floors from 1 (Lobby) to 5, where almost all exterior glass on the west facade is broken. Broken glass was observed throughout the west facade up to the 53rd floor (R. 5303).

• The heaviest accumulation of the dust and debris in the building's corridors on the guest rooms floors was observed at the elevators lobbies and the staircases. Some of the windows in the guest rooms were opened at the time of WTC collapse, which also caused heavy dust and debris contamination.

• As per building personnel statement, the building's HVAC system was in operation during and right after the WTC collapse.

Existing building interior condition photographs during the TL inspection are attached in the Appendix B of this report.

4.0 SAMPLING OF SUSPECT MATERIALS --

Bulk sampling of suspect ACM was performed in accordance with protocol contained in the Asbestos • Hazard Emergency Response Act of 1986 (40 CFR 763 AHERA). Unless otherwise noted, a minimum of three (3) samples was collected from each type of homogeneous material identified.

Page 6

NYC-WTC 000103897

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000103897Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →