NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 3 pages

WTC update: Battery Park cleanup, Sept 24-25 2001

Machine-extracted title · confidence 41%

Cleanup in Battery Park areas continues; notes on expanded areas and access issues.

NYC-WTC_000408434–000408436
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Greenwich to Bdway between chambers and Murray

Cleanup work continues to be conducted in the area from Greenwich to Broadway, between Chambers and Murray. Air monitoring was conducted in this area in an effort to move the site perivueter from chambers to murray. Four air samples were taken in the proposed area each day. These results were as follows:

9/23/01 Park Place and church ,01 fibers/cc Park Place and Greenwich .014 fibers/cc Murray and Church .007 fibers/cc Murray and Greenwich < .01 fibers/cc

9/24/01 Park Place and church .007 fibers/cc Park Place and Greenwich .012 fibers/cc Murray and Church .017 fibers/cc Murray and Greenwich .009 fibers/cc

9/25/01 Results expected at IbOOhours

101 Murray St.

Indoor air momtoring indicates it is below clearance levels. Although, it remains inside the site perimeter and outside air has not been cleared, onsite emergency personnel should be able to use this facility.

Other agencies have used TEM Asbestos analysis rather than PCM which is what DEP is using. Because of this they may feel it appropriate to open an area if TEM structures are below background. The problem with this approach is that this is a dynamic location effected by many factors. This approach would work better indoors in an enclosed static environment. The PCM approach looks at the number of fibers in a specific size range rather than asbestos fibers. Therefore this approach errs on the conservative side. Th^-efore if we can insure that the fiber count remains below .01 fibers/cc we can be assured that there are no exposure and cleanup issues. Because this site is dynamic TEM results might give a false sense of safety since the number of asbestos fibers can change depending which construction vehicles t^vel through the site. In addition, increased winds which move dd>ri fi'oro groiuid zero onto site from different locations can change asbestos count. There is also the conaderation of contamination from adjacent areas migrating with rain water. That’s why we believe the key is to sustain that the fiber count stay below the clearance level rather than worry about specific asbestos fiber counts. As

NYC-WTC_000408435

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000408435Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →