WTC update: Battery Park cleanup status, Sept 23 2001

Machine-extracted title · confidence 42%

Battery Park area cleanup ongoing; plan to secure park and prioritize sampling for clearance.

NYC-WTC_000408432–000408433
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Commissioner WTC Update for 9/23/01 Activities

South Battery Park areas are still in the cleanup stage. These areas include rector Place Park and playground, various streets and sidewalks, and the promenade.

Battery Park Conservancy manager. Bob Serpico indicated on 9/22/01 that he would secure the park at the North Battery Park area until they could conduct samples for clearance. The park was not secured as of 2200 hours on 9/23/01. Various areas along the promenade from vessey street all the way to just south of 1" place remain contaminated. We have prioritized the streets and sidewalk areas followed by the playground and vehicles and lastly the promenade since the Battery Park Conservancy indicated they would handle it.

Cleanup work continues to be conducted in the area from Greenwich to Broadway, between Chambers and Murray. Air monitoring was conducted in this area in an effort to move the site perimeter from chambers to murray. Four air samples were taken in the proposed area. Two samples were found to be borderline at the clearance criteria of .01 fibers/cc. One sample was found to be above the criteria. The remaining sample was found to be below the cleanup criteria. These results were as follows:

Park Place and chinch .01 fibers/cc Park Place and Greenwich .014 fibers/cc Murray and Church .007 fibers/cc Murray and Greenwich < .01 fibers/cc

Sample results indicate the need to continue to remediate the contamination and perform additional sampling for clearance. If after additional cleanup the sampling results are substantially lower than the criteria of .01 fibers/cc we should move to shrink the chambers street perimeter if the other environmental agencies are in agreement. Otherwise we would need to conduct additional air monitoring and cleaning until we achieve this goal.

On 9/24/01 we will continue outdoor remediation of the proposed area and believe it will be completed sometime on Tuesday afternoon. We have still not seen the vehicle advisory as promised from DOH.

At 2200 hours DERTA was requested by FDNY to report to the forward command center to evaluate a condition in the verizo i building. DERTA determined the gas odor was hydrogen sulfide caused by fill decay or sewer gas in the basement of the verizon building. This condition was then referred to the verizon safety personnel.

NYC-WTC_000408432

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000408432Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →