NYC-WTC_000305052
Daily workforce and equipment record for World Trade Center site, December 2001.
2 shared non-person entities · 1 shared topics · similarity 0.989
machine-extracted · confidence unavailable · Check page ↗Daily workforce and equipment details for World Trade Center site, December 12, 2001 (Day).
NYC-WTC_000408093OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
f ♦ GRACE CONTRACTING CORP. 151-45 6th Road, Whitestone, N.Y. 11357-(718) 7S7-9000 DECEMBER 12, 2001 (DAY) DATE: _______ ! FINAL DAILY WORK FORCE REPORT i
Job Name & Location!: World Trade Center Contract No. i Weather Conditions i
Labor || Equipment ’ CLASSIFICATION QUANT.~ll Description I MANNED STANDBY IDLE SUPERINTENDENT ; _____________ ICAT 966 LOADER 1 PROJECT ENGINEER', ___________ J CAT446 BACKHOE i 1 OFFICE ENGINEER I_________________ J CAT 973 LOADER i 1 FOREMEN I 1 J CAT 365 GRAPPLER j 1 SAFETY OFFICER i 1 nCAT375GRAPPLER i 1 LABORERS________ j_________________ 23., J HITACHI 750 GRAPPLER 1 IRON WORKERS • 1 n HITACHI 550 GRAPPLER 1 LOCAL 14 5 HITACHI 550 GRAPPLER 1 LOCAL 15 10 J HITACHI 1200 GRAPPLER 1 CARPENTER 1 185 CFM COMPRESSOR 1 CARPENTER FOREMAN_______________ 1 235 HAMMER HOE RAM 1 TEAMSTERS i 1 MECHANICS TRUCK 2 MECHANICS i 2 TOOL TRUCK 1 HOUSE WRECKERS i 9 TOOL VAN 1 ROLLOFF DUMP TRAILERS LOW BED TRAILER 'DELIVERIES; AWISCO HIGH DECK TRAILERS - WELDING TRUCK rr ' 1 FUEL TRUCK PICKUP TRUCKS 9 LIGHT TOWERS i 13 SITE MULE i 3 DUMP TRUCKS 10 WHEEL DUMP TRUCK 1— FLASHING ARROW BOARD OFFICE trailer;gener. 1 CARGO BOXES ' 3 FLAT TRUCK 1 LIGHT TOWERS USED FOR 2.5 HOURS PUMP 2 ROLLER 1 RAINMAKEWGENIE LIFT 1
Description of Work;
LOAD OUT STEEL AND DEBRIS_______ \______________________________________ j_ MANNED TARPING AND TRIMMING STATIONS__________________________________ MANNED WATER STATIONS FOR DUST CONTROL______________________________ MAINTAIN TRAFFIC FLOW IN AND OUT OF AREA ' CONTINUE REMOVING DEBRIS FROM LOWER LEVELS OF NW CORNER OF TOWER 2 ' I INSTALLATION OF GPS SYSTEMS 1 ELEVATIONS: ALL MACHINES LEVEL B-5 253 ! LOADS OUT 46 GRACE CONTRACTING CORP Approved By: " BY: Q Title: For: SUPERIfiTENDEW- i
I ’“ daily work FORCE REPORT 1212D.xls " 02,200075
CONFIDENTIAL INSURANCE INFORI4AT ION, CITY_21MC100_0027581/O
SUBJECT TO PROTECTIVE ORDER NO. 2, SEPT. 2008
NYC-WTC_000408093
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
NYC-WTC_000305052
Daily workforce and equipment record for World Trade Center site, December 2001.
2 shared non-person entities · 1 shared topics · similarity 0.989
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000429740
Daily labor and equipment classifications for World Trade Center project, Dec 2001.
3 shared non-person entities · 1 shared topics · similarity 0.988
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000278619
Night final daily workforce report detailing personnel and equipment on site.
2 shared non-person entities · 1 shared topics · similarity 0.987
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000361551
Day final daily workforce and equipment at World Trade Center site, Dec 4, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.986
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305051
Night final daily workforce and equipment roster for World Trade Center project, December 2001.
2 shared non-person entities · 1 shared topics · similarity 0.986
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305609
Day final daily workforce and equipment at World Trade Center site, December 2001.
2 shared non-person entities · 1 shared topics · similarity 0.985
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305603
Day final daily workforce and equipment at World Trade Center site, December 2001.
1 shared non-person entities · 1 shared topics · similarity 0.985
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000302429
Night shift daily workforce and equipment report for World Trade Center project.
3 shared non-person entities · 1 shared topics · similarity 0.985
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000237597
A daily report from Grace Contracting Corp. detailing the workforce and equipment deployed at the World Trade Center site on December 11, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.985
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000278610
Day final daily workforce and equipment at World Trade site, Dec 10, 2001.
1 shared non-person entities · 1 shared topics · similarity 0.985
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000429737
Asbestos fiber analysis result from WTC area NW of Bankr, Jan 2002.
3 shared non-person entities · 1 shared topics · similarity 0.984
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000278984
Day shift daily workforce report for World Trade Center site, December 13, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.984
machine-extracted · confidence unavailable · Check page ↗No available related records indexed in this group.
Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
NYC-WTC_000305052
Daily workforce and equipment record for World Trade Center site, December 2001.
Similarity score 0.995 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000429740
Daily labor and equipment classifications for World Trade Center project, Dec 2001.
Similarity score 0.994 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000278619
Night final daily workforce report detailing personnel and equipment on site.
Similarity score 0.994 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000361551
Day final daily workforce and equipment at World Trade Center site, Dec 4, 2001.
Similarity score 0.993 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305051
Night final daily workforce and equipment roster for World Trade Center project, December 2001.
Similarity score 0.993 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305609
Day final daily workforce and equipment at World Trade Center site, December 2001.
Similarity score 0.993 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000305052
Daily workforce and equipment record for World Trade Center site, December 2001.
Similar indexed content
NYC-WTC_000429740
Daily labor and equipment classifications for World Trade Center project, Dec 2001.
Similar indexed content
NYC-WTC_000278619
Night final daily workforce report detailing personnel and equipment on site.
Similar indexed content
NYC-WTC_000361551
Day final daily workforce and equipment at World Trade Center site, Dec 4, 2001.
Similar indexed content
NYC-WTC_000305051
Night final daily workforce and equipment roster for World Trade Center project, December 2001.
Similar indexed content