NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 3 pages

Asbestos testing, 199 Chambers Street, Sep 2001

Machine-extracted title · confidence 38%

Asbestos and lead testing conducted at 199 Chambers Street on Sept 28, 2001, with follow-up survey reference.

NYC-WTC_000390155–000390157
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Re; Asbestos Testing Page 2 of 3

The 199 Chambers Street complex is currently being used to house various inernbers of the rescue and recovery operation. There is concern that these personnel are carrying asbestos and lead contamination on their clothing when _ _ they return to the building.

H. A. Bader Consultants test results from September 20, 2001, and report dated September 21, determined there was no significant evidence of a potential asbestos and/or lead related health concern in the 199 Chambers Street Complex. H. A. Bader Consultants scope of work on September 28, 2001, was to repeat the testing in select areas to insure that asbestos and lead levels remain non-problematic. The college is scheduled to reopen October 1, 2001.

Lead Testing

The U.S. Federal Department of Housing and Urban Development (HUD) and the City of New York Department of Environmental Protection (DEP) have established allowable levels of lead dust in residential settings occupied by children. The HUD/DEP clearance level is of 50 pg/ft^. These levels are extremely conservative and apply to buildings where small children (less than six years old) reside or frequently visit.

17 lead dust samples v/ere taken on September 28, 2001, 15 samples were below’ the level of detection. Two samples from the gymnasium bleachers had detectable lead levels (13 and 20 pg/ft’), however they were within the HUD/DEP guideline levels. Reference the attached laboratory results from EMSL Analytical. The bleachers are used by the rescue and recovery personnel and there is a significant amount of dust and debris present. This testing indicates that significant lead contamination is not present in the building.

Asbestos Air Sampling

13 air samples were taken and analyzed by an accredited asbestos laboratory using transmission electron microscopy (TEM). TEM analysis is very accurate for finding even trace amounts of asbestos fibers present in the air.

The United States Environmental Protection Agency (EPA) has established a protocol for determining whether school areas are safe for re-occupancy after completion of asbestos abatement projects. This procedure is covered by EPA

CITY_21MC100_008854561

NYC-WTC_000390156

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000390156Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →