WTC Daily Site Evaluation summary, Oct 24, 2001

Machine-extracted title · confidence 37%

Daily site safety evaluation noting PPE, housekeeping, and corrective actions on site.

NYC-WTC_000389314–000389315
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Environmental, Safety, and Health WTC Daily Site Evaluation* 10/24/01

Major Issues Location Disposition Status Inadequate scaffolding. Winter garden________ Issue corrected by Breezes foreman._____________________________ ' NEW Gas cylinders improperly secured._______________________________ Winter garden________ Issue corrected by AMEC safety rep. NEW Lack of fall protection.________________________________________ Between Plaza & WTC 6 Issue corrected by AMEC safety rep._____________________________ NEW Inconsistent use of proper PPE (e.g., safety glasses, respiratory protection). WTC 1 Discussed with AMEC safety rep._______________________________ OPEN Crane was backed off the pads; DDC & structural engineers are inspecting Crack observed tn slurry wall. WTC6 OPEN the area Io determine the stability of the wall.

Gas cylinders improperly secured and stored. WTC 2 Discussed with Bovis safety rep. NEW Inadequate fall protection, (employees not wearing safely harness)._____________ WTC 3 Discussed with Koch superintendent and Bovis safety rep._____________ NEW Inadequate dust suppression.__________________________________________ WTC 2 Bovis Safely is working with FDNY to correct. Conditions have improved. OPEN

i Inconsistent use of proper PPE (e.g., hearing protections, safety glasses, respiratory protection).________________________________________________________ Inadequate barricading.

Discovery of ammunition on pile. WTC2 WTC 2 South side

Southeast comer of WTC 6 Mel with Bovis safety rep. to discuss corrective action plan. Discussed with Bovis safety rep.

Discussed with Tully safely rep., NYPD (Capt. Motte), and Customs agent (Victoria Ovis). Tully will not cut in that area but will use grappler as OPEN OPEN

OPEN directed by NYPD & Customs (Ordinance experts). Inadequate vehicle spotting.________________________________ WTC2&4 Discussed with Tully safely rep. OPEN Truckmade sharp turn and hit Tully gator that had FDNY sitting in it. Liberty Tully safety rep informed and incident report requested by Bechllel Safety. OPEN Tully ordered flash arrestors and will place them on torch once they come OPEN Lack of flash arrestors on cutting torches. Various locations ________________________________________' Gas cylinders improperly stored.________________________ Various locations Contractor's safety rep. was informed. OPEN Inconsistent use of proper PPE (e.g., safety glasses, respirators). All areas______ Discussed with contractor's safety personnel. OPEN Inadequate dust suppression. Tully Discussed with Tully safety rep. Conditions have improved. OPEN

Received demo, plan for 30 W. Broadway. WTC 7 Bechtel safely is reviewing. NEW WTC 7 (stacked Conex Discussed with Seasons safety rep. OPEN Inadequate fall protection. boxes)_____________ I Backup alarm not loud enough on CAT front end loader 960F. WTC 7____________ Discussed with Seasons safety rep. OPEN I Inadequate barriers by tube trailer.___________________ WTC 7 Turner Safely rep is working w/FDNY to correct. OPEN I No backup alarm on Seasons dump truck #38. (NJAFl 79H) WTC 7 Discussed with Seasons safety rep. OPEN Various locations Turner ordered flash arrestors and installed. 1 burner removed flash OPEN I Lack of flash anestors on cutting torches. arrestor. Discussed with Turner safety rep.___________________ Diesel fuel tanks not grounded or posted. Barclay St Electrical cords were discovered Io be cut. OPEN Gas cylinders improperly secured and stored.______________________ WTC 7 Met with Seasons safely rep. Io discuss corrective action plan. OPEN o Inconsistent use of proper PPE, particularly respiratory protection on pile. WTC 7 Met with Seasons safety rep. to discuss corrective action plan. OPEN H

to

O o o I o A o to

to wo ps. co

NYC-WTC_000389314

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000389314Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

WTC Daily Site Evaluation, Oct 23, 2001 · Box unavailable

NYC-WTC_000204854

Daily environmental, safety, and health evaluation log for the World Trade Center site dated October 23, 2001, noting PPE usage, fall protection, and structural cracks.

10 shared non-person entities · 1 shared topics · similarity 0.971

machine-extracted · confidence unavailable · Check page ↗

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000337370

Daily site evaluation entries noting PPE and fall protection issues and corrective actions.

Similar indexed content

NYC-WTC_000387709

Daily safety evaluation noting equipment, fall protection, and PPE issues at WTC site.

Similar indexed content

Compare copies and versions →