10 shared non-person entities · similarity 0.970
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000209314
Label derived from the City's folder field. The City does not supply document titles.NYC-WTC_000209314–000209315
OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
1 Environme^ai, Safety, and Health WTC Daily Site Evaluation* 10/24/01
Major Issues Location Disposition Status Inadequate scaffolding. Winter garden Issue corrected by Breezes foreman. NEW Gas cylinders improperly secured. Winter garden________ Issue corrected by AMEC safety rep. NEW Lack of fall protection. Between Plaza & WTC 6 Issue corrected by .A.MEC safety rep. NEW’ Inconsistent use of proper PPE (e.g., safety glasses, respiratory protection). WTC 1 Discussed with AMEC safety rep. OPEN Crack observed in slurry wall. WTC6 Crane was backed off the pads; DDC & structural engineers are inspecting OPEN the area to determine the stability of the wall.
Gas cylinders improperly secured and stored. WTC 2 Discussed with Bovis safety rep. NEW Inadequate fail protection, (employees not wearing safety harness). WTC 3 Discussed with Koch superintendent and Bovis safety rep. NEW- Inadequate dust suppression. WTC 2 Bovis Safety is working with FDNY to correct. Conditions have improved, OPEN Inconsistent use of proper PPE (e.g., hearing protections, safety glasses, respiratory ■Si protection). WTC2 Met with Bovis safety rep. to discuss corrective action plan. OPEN Inadequate barricading. WTC 2 South side Discussed with Bovis safety rep. OPEN
Discussed with Tully safety rep., NYPD (Capt. Motte), and Customs agent I.® Discovery of ammunition on pile. Southeast comer of WTC 6 (Victoria Ovis). Tully will not cut in that area but will use grappler as OPEN directed by NYPD & Customs (Ordinance experts).
s Inadequate vehicle spotting. Truck made sharp turn and hit Tully gator that had FDNY sitting in it. Lack of flash arrestors on cutting torches. Gas cylinders improperly stored. WTC 2 & 4 Liberty Various locations Various locations Discussed with Tully safety rep. Tully safety rep informed and incident report requested by Bechtlel Safety. Tully ordered flash arrestors and will place them on torch once they come in. Contractor’s safety rep. was informed. OPEN OPEN OPEN OPEN Inconsistent use of proper PPE (e.g., safety glasses, respirators). All areas Discussed with contractor’s safety personnel. OPEN Inadequate dust suppression. Tully Discussed with Tully safety rep. Conditions have improved. OPEN
Received demo, plan for 30 W. Broadway. WTC 7 Bechtel safety is reviewing. NEW Inadequate fall protection. WTC 7 (stacked Conex Discussed with Seasons safety rep. OPEN boxes) Backup alarm not loud enough on CAT front end loader 960F. WTC 7 Discussed with Seasons safety rep. OPEN Inadequate barriers by tube trailer. WTC 7 Turner Safety rep is working w/FDNY to correct.______________ OPEN No backup alarm on Seasons dump truck #38. (NJAFl 79H) WTC 7 Discussed with Seasons safety rep._________________________ OPEN
fl Lack of flash arrestors on cutting torches. Diesel fuel tanks not grounded or posted. Gas cylinders improperly secured and stored. Various locations
Barclay St. WTC 7 Turner ordered flash arrestors and installed. I burner removed flash arrestor. Discussed with Turner safety rep. Electrical cords were discovered to be cut. Met with Seasons safety rep. to discuss corrective action plan. OPEN OPEN OPEN is Inconsistent use of proper PPE, particularly respiratory' protection on pile. WTC 7 Met with Seasons safety rep. to discuss corrective action plan. OPEN O H
s o o o I o o ers cn co Cn *Site assessments arc conducted daily in the WTC disaster area. The primary focus is to identify and correct any major unsafe practices and unsafe conditions. to to o
NYC-WTC_000209314
OCR can misread numbers and units. Confirm readings against the page image before using them.
Related records
Browse subjects →Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
Same-box records
Filed elsewhere
11 shared non-person entities · 1 shared topics · similarity 0.985
machine-extracted · confidence unavailable · Check page ↗11 shared non-person entities · 1 shared topics · similarity 0.981
machine-extracted · confidence unavailable · Check page ↗10 shared non-person entities · similarity 0.963
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000164098
Distribution of materials provided at January 15, 2002 WTC contractor health and safety meeting.
8 shared non-person entities · similarity 0.930
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000164671
Draft document titled World Trade Center Emergency Safety and Health Plan dated September 30, 2001.
10 shared non-person entities · similarity 0.926
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000154452
Fax memo summarizing WTC daily activities including water access requests and a FEMA meeting on demolition permits.
7 shared non-person entities · 1 shared topics · similarity 0.923
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000148742
Notice instructing staff to preserve original World Trade Center documents for potential legal actions against the City.
8 shared non-person entities · 1 shared topics · similarity 0.920
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000154518
Operational period plan from the FDNY detailing actions for December 21, 2001 at the World Trade Center site.
6 shared non-person entities · 1 shared topics · similarity 0.919
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000149936
Joint OSHA and Bechtel crane inspection report analyzing safety conditions at the World Trade Center site.
9 shared non-person entities · similarity 0.918
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000146033
Correspondence from NYC Corporation Counsel providing comments on excerpts of a draft EPA evaluation report regarding the WTC response.
5 shared non-person entities · similarity 0.918
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000154538
Operational period plan from the FDNY detailing actions for December 21, 2001 at the World Trade Center site.
7 shared non-person entities · 1 shared topics · similarity 0.917
machine-extracted · confidence unavailable · Check page ↗More like this page
Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
Similarity score 0.987 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Similarity score 0.983 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Similarity score 0.975 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Similarity score 0.970 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000148192
Notice instructing staff to preserve original World Trade Center documents for potential legal actions against the City.
Similarity score 0.959 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Similarity score 0.951 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Others also read
Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
Similar indexed content
Similar indexed content
Similar indexed content
Similar indexed content
NYC-WTC_000164098
Distribution of materials provided at January 15, 2002 WTC contractor health and safety meeting.
Similar indexed content