NEW YORK CITY DEPARTMENT OF ENVIRONMENTAL PROTECTION
BUREAU OF WASTEWATER TREATMENT
LIMITATIONS FOR EFFLUENT DISCHARGE TO SANITARY OR COMBINED SEWERS
Project Name/Location WTC - South Projection Date: January 2,2001
Sample Treatment
Parameter Limitations Units Note Results • Over/Under Required
Temperature <150 PegF not measured
Total Petroleum Hydrocartxins 50 PP”> 19.2 NO
pH 5-11 SU’S 8.09 NO
Cadmium 2 ppm Daily Avg. 0.69 ppm <0.05 NO
Chromium (total) 5 ppm <0.06 NO
Copper 5 ppm <0.05 NO
Lead 2 ppm <0.06 NO
Mercury 0.06 PP'” <0.002 NO
Nickel 3 PP'^ <0.06 NO
Zinc 5 PPf" <0.05 NO
Flash Point >140 PegF >1« NO
Benzene 134 PP*’ Method 602 <5 NO
Ethylbenzene 380 PPb Method 602 <5 NO
Toluene 74 PP^’ Method 602 8 NO
Xylenes 74 PPb Method 602 <5 NO
EPA method 608 only with
PBC’s (total) 1000 PPt
MDL = 6Sppt All below Detection Limit of 66 ppb
Total Suspended Solids No Limit 17 NO
Tetrachloroethylene 164 ppb <5 NO
MTBE 10 ppb 65 55 YES
Napthalene 47 ppb <5 No
Other ppb
• Indicate test data origin Independent Testing Labs - College Point, NY - sample collected 12/13/01
Grab sample from pump discharge
" Analysis for PCB's are required ONLY if BOTH conditions listed below are met:
1) if proposed discharge > 10,000 gpd
2) if duration of a discharge > 10 days
CITY_21MC100_002884288
NYC-WTC_000388770
OCR can misread numbers and units. Confirm readings against the page image before using them.