Daily work force report, World Trade, Nov 26, 2001

Machine-extracted title · confidence 25%

Final daily workforce report for World Trade site, Grace Contracting, Nov 26, 2001.

NYC-WTC_000388478
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

GRACE CONTRACTING CORP. ISMSOhRoM). WWtB»lD™, N.y. nsS7-(7,8)787-9000 DATE: MONDAY. NOVEMBER 26,2001 DAY (FINAL)

DAILY WORK FORCE REPORT

Job Name & Location: World Trade Center Contract No. Weather Conditiona RAIN EARLY THEN MILO - DARK

Labor I Equipment I CLASSIFICATION UANTIT SUPERINTENDENT 2 CAT 966 LOADER 1 PROJECT ENGINEER 1 CAT 446 BACKHOE 1 OFFICE ENGINEER CAT 973 LOADER 1 FOREMEN 1 CAT365GRAPPLER 1 SAFETY OFFICER 1 CAT37SGRAPPLER 1 LABORERS 20 HITACHI 750 QRAPPLER T IRON WORKERS 1 HITACHI 550 GRAPPLER 1 LOCAL 14______________ _ 4 HITACHI 550 GRAPPLER 1 LOCAL 15 9 HITACH11200 GRAPPLER 1 CARPENTER 185 CFM COMPRESSOR 1 CARPENTER FOREMAN 2 MECHANICS TRUCK 2 TEAMSTERS 11 TOOLTRUCK 1 MECHANICS 2 TOOL VAN 1 HOUSE WRECKERS 4 BROLLOFF IlDUMP TRAILERS 8 LOW BED TRAILER HIGH DECK TRAILERS 2 WELDING TRUCK 1 FUEL TRUCK 1 PICKUP TRUCKS T LIGHT T 8 PARTS TRUCK 1 DUMP TRUCKS 10 WHEEL DUMP TRUCK FLASHING ARROW BOARD 1 OFFICE TRAILER 1 CARGO BOXES 3 FLAT TRUCK____________ 1 PUMP 2 85' FOOT GENIE 1 ANGEL AERIAL(DUST SUPR 1 GENERATOR 60KW 1

Description of Work:_________________________________________________ LOADS OUT: 140_____________________________________ _____________ EXCAVATING ALONG WEST SLURRY WALL SOUTH OF OUR ACCESS ROAD CONTINLrasEHiaEE RAMP FROM northwest APPROACH MANNED TARPING AND TRIMMING STATIONS MANNED WATER STATIONS FOR OUST CONTROL MAINTAIN TRAFFIC FLOW IN AND OUT OF AREA CONTINUE 3 DEBRIS FROM LOWER LEVELS OF TOWER 2 DELAYS: 1 HR (12:00-1:00) WHILE CREW WENT UNDERGROUND TO INVESTIGATE AREA 3 HOURS WITH GATEWAY E2S E 780 AT N/E CORNER OF TOWER 2 CORE WHILE SEARCH AND RECOVERY FOR FIREFIGHTERS WAS CONDUCTED

GRACE CONTRACTING CORP Approved By: Tide: BY______ For SUPERIHTENDeNT

CITY_21MC100_0 03715850

NYC-WTC_000388478

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000388478Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →