NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 1 page

Daily work force report, World Trade, Dec 2001

Machine-extracted title · confidence 32%

Day preliminary daily workforce report for World Trade site, Dec 11, 2001.

NYC-WTC_000388452
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document ax-, •'

GRACE CONTRACTING CORP. 151-4$ WhRoMi, WhMMtOiW, N Y. 11387-(718) 7e7-»OOO DATE: DECEMBER 11,2001 (DAY ) ______________________________ FINAL DAILY WORK FORCE REPORT i

Job Name ft Location: World Trade Center Contract No. Weather Conditiona

Labor Equipment CL CATION QUANT. MANNED STANDBY IDLE SUPERINTENDENT 2 CAT 966 LOADER_______ 1 PROJECT ENGINEER 2 CAT 446 BACKHOE 1 OFFICE ENGINEER CAT 973 LOADER 1 FOREMEN 1 CAT3656RAPPLER 1 SAFETY OFFICER 1 CAT375GRAPPLER 1 LABORERS 22 HITACHI TSO GRAPPLER 1 IRON WORKERS 1 HITACHI 550 GRAPPLER 1 LOCALU 5 HITACHI 550 GRAPPLER 1 LOCAL 15 9 HITACH11200 GRAPPLER 1 CARPENTER 1 185 CFM COMPRESSOR 1 CARPENTER FOREMAN 1 235 HAMMER HOE RAM 1 TEAMSTERS 1 MECHANICS TRUCK 2 MECHANICS 2 TOOLTRUCK 1 HOUSE WRECKERS 8 TOOL VAN 1 ROLLOFF DUMP TRAILERS LOW BED TRAILER DELIVERIES: TRIBORO.HARDWARE HIGH DECK TRAILERS AWISCO WELDING TRUCK 1 FUEL TRUCK 1 PICKUP TRUCKS 8 LIGHT TOWERS 13 SITE MULE____________ 3 DUMP TRUCKS 10 WHEEL DUMP TRUCK DELAYS: ENTIRE JOB SHUT DOWN FOR 1 HOUR FLASHING ARROW BOARD DUE TO MEMORIAL SERVICE T OFFICE TRAILER/GENER. £ CARGO BOXES 3 FLAT TRUCK 1 RJIMP________________ 2 ROLLER 1 RAINMAKER/GENIE LIFT 1

Description of Work:________ ___ ______________________________________ [OELAYS 1200 DOWN 11 AM Ml. DAY TO SEARCH FOR PORT AUTHORITY POLICE OFFIC^ ILOAD OUT STEEL ANO DEB^ TARPING AND TRIMMING STATIONS LV.J?li!l=l»l WATER STATIONS FOR DUST CONTROL MAINTAIN TRAFFIC FLOW IN AND OUT OF AREA____________________________ CONTINUE REMOVING DEBRIS FROM LOWER LEVELS OF NW CORNER OF TOWER 2 INSTALLATION OF OPS SYSTEMS_______________________________________ ELEVATIONS: ALL MACHINES LEVEL B-S 253 LOADS OUT 50 YUKELOADS48 GRACE Approved By: Title: For SUPERINTENOSMT

DAILY WORK FORCE REPORT 1211D.xls

CITY_21MC100_003715472

NYC-WTC_000388452

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000388452Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →