World Trade Center daily crew and equipment, Dec 4, 2001 (Night).
1 shared non-person entities · 1 shared topics · similarity 0.977
machine-extracted · confidence unavailable · Check page ↗Preliminary daytime labor/equipment roster for World Trade project, Jan 2002.
NYC-WTC_000388417OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
grace CONTRACTING CORP. '.'.h.last-r.s, H.Y. 1,357 (7,Q!7fi7.S00t) DATE- JANUARY 4, 2002 DAY (PRELIMINARY)
DAILY WORK FORCE REPORT
pob Name & Location: World Trade Center Contract No. Weather Conditions
Labor ........................ —I,,;.''. L Equipment CLASSIFICATION QUANT. Desc-rplinn MANNED STANDBY IDLE iSUPERINTENDENT 1 CAT 9fl6 LOADER 1 (PRO.IECT ENGINEER 2 GAT 445 BACKHOE L [OFFICE ENGINEER CAT 973 LOADER i Foremen 1 GAT 365 GRAPPLER 1 SAFETY OFFICER 1 CAI 375 GRAPPLER 1 LABORERS 19 CAT 375 GRAPPLER 1 IRON workers HITACHI 750 GRAPPLER 1 LOCAL 14 6 HITACI11550 BUCKET 1 LOCAL 15 9 HITACHnaCO GRAPPLER 1 CARPENTER 1&5CFf.t COMPRESSOR < CARPETtTER FOREMAN 1 235 HAMMER HOE RAM t TEAMSTERS 1 MECHANICS TRUCK 2 MECHANICS 2 TOOL TRUCK HOUSE WRECKERS 3 TOOL VAN 1 ROLLOFF DUMP TRAILERS LOW pro TRAILER )Ff IV6RIES; HIGH DECK TRAILERS 'WELDING TRUCK 1 FUEL TRUCK 1 PICKUP TRUCKS 8 LIGHT TOWERS 13 SITE MULE .3 DUMP TRUCKS 10 WHEEL DUMP TRUCK FLASHING ARROW BOARD 1 I OFFICE TRAILEWGENER- I CARGO BOXES 4 FLAT TRUCK 1 PUhtP 2 ■ROLLER 1 Irainmaker/genie lift 1
Dfcscnplion ot 'AtoI:._____________________________________________________________________ ANTICIPATED WOffH_______ ______________________________________________________________ CONTINUE REMOVING PEBRiS FROM LOWER LEVELS OF TOWER 2 AND SOUTH OF MAIN CHILLER PLANT MAN WATERING STATIONS FQft DUST CONTROL_______________________________________________ MAINTAIN TRAFFIC FLOW INTO AND OUT OF AREA______________________________ ______________ _ 2 MACHINES AT LEVELS B-S. ?MACH1M'.S AT LEVEL 6-6; EL 242___________________________ CON f lNUE ON B-6 IN MER ROOM & REMOVE ALL PIPING ON B p 1 PADS OUT-_________________ _________________________________________ ________________ _ YOKES OUT '
GRACE CONTRACTING CORPj Approved By: BY: 7p , Ti'io f I Of :SUPeRlhTE«D£WT
f ( DAILY Y«ORK FORCE REPORTOUMO.xb I
CITY_21MC100_003701233
NYC-WTC_000388417
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
NYC-WTC_000280757
World Trade Center daily crew and equipment, Dec 4, 2001 (Night).
1 shared non-person entities · 1 shared topics · similarity 0.977
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305091
Night shift workforce and equipment at World Trade; Feb 3, 2002.
1 shared topics · similarity 0.976
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000278617
Night final daily workforce report listing equipment and labor at the World Trade Center site.
1 shared non-person entities · 1 shared topics · similarity 0.975
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000389487
Daily workforce allocation and equipment at World Trade site, Dec 12, 2001.
1 shared non-person entities · 1 shared topics · similarity 0.974
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000386652
Day shift daily workforce and equipment listing for World Trade site, Dec 13, 2001.
1 shared non-person entities · 1 shared topics · similarity 0.974
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000302469
Day final daily workforce and equipment for World Trade site, Dec 20, 2001.
1 shared non-person entities · 1 shared topics · similarity 0.974
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000432506
Final daily workforce report for World Trade Center site, Dec 12, 2001.
1 shared non-person entities · 1 shared topics · similarity 0.973
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000389478
Night final daily workforce and equipment, World Trade Center, Dec 6, 2001.
1 shared non-person entities · 1 shared topics · similarity 0.973
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000269186
Final daily workforce and equipment summary for World Trade Center night shift.
1 shared non-person entities · 1 shared topics · similarity 0.973
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000432552
Workforce and machine details for World Trade Center site, Jan 8, 2002.
1 shared non-person entities · 1 shared topics · similarity 0.973
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000432496
Night final daily workforce report for World Trade Center, Dec 6, 2001.
1 shared non-person entities · 1 shared topics · similarity 0.973
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305225
Night preliminary daily workforce and equipment at World Trade site, Dec 4, 2001.
1 shared non-person entities · 1 shared topics · similarity 0.973
machine-extracted · confidence unavailable · Check page ↗No available related records indexed in this group.
Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
NYC-WTC_000280757
World Trade Center daily crew and equipment, Dec 4, 2001 (Night).
Similarity score 0.989 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305091
Night shift workforce and equipment at World Trade; Feb 3, 2002.
Similarity score 0.988 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000278617
Night final daily workforce report listing equipment and labor at the World Trade Center site.
Similarity score 0.988 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000389487
Daily workforce allocation and equipment at World Trade site, Dec 12, 2001.
Similarity score 0.987 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000386652
Day shift daily workforce and equipment listing for World Trade site, Dec 13, 2001.
Similarity score 0.987 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000302469
Day final daily workforce and equipment for World Trade site, Dec 20, 2001.
Similarity score 0.987 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000280757
World Trade Center daily crew and equipment, Dec 4, 2001 (Night).
Similar indexed content
NYC-WTC_000305091
Night shift workforce and equipment at World Trade; Feb 3, 2002.
Similar indexed content
NYC-WTC_000278617
Night final daily workforce report listing equipment and labor at the World Trade Center site.
Similar indexed content
NYC-WTC_000389487
Daily workforce allocation and equipment at World Trade site, Dec 12, 2001.
Similar indexed content
NYC-WTC_000386652
Day shift daily workforce and equipment listing for World Trade site, Dec 13, 2001.
Similar indexed content