Day final daily workforce and equipment listing for World Trade Center site.
2 shared non-person entities · 1 shared topics · similarity 0.985
machine-extracted · confidence unavailable · Check page ↗Day shift daily workforce for World Trade Center site, December 1, 2001.
NYC-WTC_000388268OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
Z^^GRACE CONTRACTING CORP. ^^■51.45 61h Road. Whitestone. N.Y. 11357-(TIB) 787-BQOO DATE: DECEMBER 1.2001 (DAY) FINAL DAILY WORK FORCE REPORT
Job Name & Location: World Trade Center Contract No. Weather Conditions i ( s Labor i ____________ Equipment CLASSIFICATION, UANTIT Description MANNED STANDBY! IDLE SUPERINTENDENT CAT 966 LOADER_________ 1 PROJECT ENGINEER 1 CAT 446 BACKHOE_______ 1 lOFFICE ENGINEER CAT 973 LOADER_________ 1 CAT 365 GRAPPLER 1
i FOREMEN____________ SAFETY OFFICER CAT 375 GRAPPLER 1 LABORERS___________ HITACHI 750 GRAPPLER 1 IRON WORKERS HITACHI 550 GRAPPLER 1 LOCAL 14_________ HITACHI 550 GRAPPLER 1 LOCAL 15_________ HITACHI 1200 GRAPPLER 2 CARPENTER 185 CFMCOMPRESSOI^ 1 CARPENTER FOREMAN 1 235 HAMMER HOE RAM - 1
t TEAMSTERS__________ 11 MECHANICS TRUCK MECHANICS__________ 2 TOOL TRUCK____________; HOUSE WRECKERS 7 TOOLy^N_______________ ROLL OFF_______________ DUMP TRAILERS_________ 7 LOW BED TRAILER_______ HIGH DECK TRAILERS
i AWISCO OXY/ACET WELDING TRUCK________ AWISCO TIPS FUEL TRUCK____________ AWISCO OXY/ACET PICKUP TRUCKS_________ LIGHT TOWERS__________ SITE MULE______________ DUMP TRUCKS__________ 10 WHEEL DUMP TRUCK FLASHING ARROW BOARD OFFICE TRAILER/GENER.' CARGO BOXES_________ _ FLAT TRUCK____________ I 1 PUMP__________________ 2 ROLLER________________ 1 RAINMAKER/GENIE LIFT 1
Description of Work:__________________ .__________________________________________________ GATEWAY 550 DELAYED 7 AM-1:15 PM SEARCH AND RESCUE PORT AUTH P D______________ i365 1-2PM FIRE DEPT SEARCH IN SLURRY WALL NEAR PANEL 25__________________________ CONTINUE TO EXTEND ROAD NORTHjOF TOWER 2 AND MEET UP WITH AMEC,______________ MANNED TARPING AND TRIMMING STATIONS___________________________________________ MANNED WATER STATIONS FOR DUST CONTROL________________________________________ MAINTAIN TRAFFIC FLOW IN AND OUT OF AREA_________________________________________ CONTINUE REMOVING DEBRIS FROM LOWER LEVELS OF NORTHWEST CORNER OF TOWER 2 CONTINUE EXCAVATING B/W VISTA & TOWER 2__________________________________________ CONTINUE EXCAVATING BEHIND SLURRY WALL TO MEET UP WZ AMEC____________________ ELEVATIONS; 1200-264. 550-274, 375-284, 365-274 ----- LOADS OUT 49 Approved By: Title: BY:\ For; SUPERINTENDENT
I
NYC-WTC_000388268 CITY_21MC100_000368168
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
NYC-WTC_000305364
Day final daily workforce and equipment listing for World Trade Center site.
2 shared non-person entities · 1 shared topics · similarity 0.985
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000322822
World Trade daily workforce and equipment, Dec 1, 2001 day shift.
2 shared non-person entities · 1 shared topics · similarity 0.983
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305589
Day shift daily workforce and equipment at World Trade site, Dec 1, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.983
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305235
Daily workforce roster for World Trade Center construction site, with crew classifications and equipment.
2 shared non-person entities · 1 shared topics · similarity 0.982
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000356713
Final daily workforce and equipment for World Trade Center project, Nov 25, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.982
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000408035
Day shift workforce and equipment at World Trade Center site, Dec 1, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.979
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305602
Night final daily workforce and equipment at World Trade Center site, December 2001.
1 shared non-person entities · 1 shared topics · similarity 0.979
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000278985
Night shift daily workforce report for World Trade Center site, December 12, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.978
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000388193
Daily workforce and equipment summary for World Trade project, Dec 1, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.978
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000278687
World Trade Center site workforce and equipment records, December 5, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.977
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305361
Night final daily workforce and equipment listing for World Trade Center site, including weather notes.
2 shared non-person entities · 1 shared topics · similarity 0.977
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000279996
Labor and machinery at World Trade Center site, Grace Contracting, November 20, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.976
machine-extracted · confidence unavailable · Check page ↗No available related records indexed in this group.
Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
NYC-WTC_000305364
Day final daily workforce and equipment listing for World Trade Center site.
Similarity score 0.992 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000322822
World Trade daily workforce and equipment, Dec 1, 2001 day shift.
Similarity score 0.992 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305589
Day shift daily workforce and equipment at World Trade site, Dec 1, 2001.
Similarity score 0.991 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305235
Daily workforce roster for World Trade Center construction site, with crew classifications and equipment.
Similarity score 0.991 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000356713
Final daily workforce and equipment for World Trade Center project, Nov 25, 2001.
Similarity score 0.991 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000408035
Day shift workforce and equipment at World Trade Center site, Dec 1, 2001.
Similarity score 0.990 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000305364
Day final daily workforce and equipment listing for World Trade Center site.
Similar indexed content
NYC-WTC_000322822
World Trade daily workforce and equipment, Dec 1, 2001 day shift.
Similar indexed content
NYC-WTC_000305589
Day shift daily workforce and equipment at World Trade site, Dec 1, 2001.
Similar indexed content
NYC-WTC_000305235
Daily workforce roster for World Trade Center construction site, with crew classifications and equipment.
Similar indexed content
NYC-WTC_000356713
Final daily workforce and equipment for World Trade Center project, Nov 25, 2001.
Similar indexed content