130 Liberty Street metals results summary

Machine-extracted title · confidence 34%

Summary table of metals results for 130 Liberty Street site area and elevators.

NYC-WTC_000386792
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

c ■130 Liberty Street Bulk Heavy Metals Results Occupied Areas surveyed on September 2001 c n c Air Plenums and Ducts surveyed January 16 to 19, 2002 9s CL Elevators surveyed January 21 and 22, 2002 s c nj n Floor Area Range of Results (ppm) (P '.0 Occupied ar&a Cadmium 5,94-6.13 Chromium 85.15 - 93.22 Copper Lead Nickel Zrnc Notes ? 135.15-166.74 63.37-101.09 15-17 1114-1173 k: w pj 17 Return air plenum K' cc OJ Supply air ducts ►a Occupied area 16 Return air plenum <2.93 -19.2 58,8 -199 336-1530 87,1 -702V 24-61 519-3200 Cr Supply airducts Occupied area 4.71 - 6.56 62 - 64 102-124 34 -48 7.06-0.26 773-976 15 Relum air plenum Supply air ducts Occupied area 14 Return air plenum Supply air duels I*- Occupied area 6.04-0.61 84-00 48-61 10,5-11,3 1043-1047 Cr 136 -145 •3. 12 Return air plenum 6.67-8.63 77 -109 146-1220 193-306 27-37 1190-43900 Supply air ducts §c Occupied area 5.92 - 8.28 109-142 126-148 39-66 16.6-22 900 -953 c 11 Return air plenum <1 m Supply airducts u Occupied area 5.08 - 5.74 95-149 103-168 37-72 12.6-24 769 -1008 I u 10 Relum air plenum LO I— =) Supply air ducts UJ Q Occupied area 5.6-9.08 124-144 165-218 32,9-103 16.4-23 956-1698 9 Return air plenum Supply air datib Occupied area 12.5-44 53-58 197 -200 170-172 9.21 -14.0 1149-1245 8 Return air plenum 6.44-18.3 78 -158 225-756 173-455 20-57 1350 -2620 Q in Supply air ducts o H Occupied area 7.93 -14.8 61-87 132-183 9,01 -137 10.8-11,0 084- 1184 i-< I 7 Relum air plenum 5.27-10.3 74-153 189-706 160 - 340 23-54 1150 -3580 ho

s 3 Q G) Supply air ducts Occupied area 4.69-5.81 55 yri 77-171 38-233 8,71-11.3 1162-3113 o I 5 Return air plenum 5.43 - 49 64 - 127 150-309 101 - 279 19 5-35 1640-0640 o Supply air fans g I 2.77-41 54-192 113-686 165-276^ 16.1-48 2270 -16600 c o I 9* o kO

NYC-WTC_000386792

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000386792Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000182143

Summary of survey results for metals in floors, ducts, and elevators at 130 Liberty Street conducted between September 2001 and January 2002.