NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 3 pages

Metals results, 130 Liberty Street, Sept 2001

Machine-extracted title · confidence 41%

Metals measurement results from 130 Liberty Street inspection, including ranges and elevators/ducts notes.

NYC-WTC_000386708–000386710
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

C 130 Liberty Street Bulk Heavy Metals Results Occupied Areas surveyed on September 28, 2001 Air Plenums and Ducts surveyed January 16 to 19, 2002 C

Elevators surveyed January 21 and 22, 2002 Q T-1 c Floor# Area Range of Results (ppm) n Notes > cn Cadmium Chromium Copper Lead Nickel T Zinc •D Occupied area 5.04-6.13 85.15-93.22 136.15 - 168.74 63.37-101.09 15-17 1114-1173 nj 17 Return air plenum cc (M Supply air ducts ►a Occupied area 16 Return air plenum <2,93 -19,2 58.8-199 336-1530 87.1 -702 Z 24-61 519-3200 ►-

Supply airducts Occupied area 4.71 - 6.56 62 - 64 102-124 34 -48 7.06-9,26 773-976 15 Relum air plenum Supply air ducts Occupied area 14 Relum air plenum > Supply air duels g»— Occupied area 6,04-8.61 04-90 136 -145 48-61 10.5-11.3 1043-1047 tr •2 12 Return air plenum 6.67 - 8.63 77 -109 146-1220 193 - 306 27 -37 1190-43900 Supply airducts 5c Occupied area 5.92 - 8.20 109-142 126-148 39-69 16.6-22 900 - 953 c •X 11 Rstum air plenum $ m Supply airducts LU X Occupied area 5.08 - 5.74 95-149 103-168 37-72 12.6-24 789 - 1008 u 10 Return air plenum cn Z) Supply airducts LU Q Occupied area 5.8-9. 08 124-144 165-218 32.9-103 16,4-23 956-1598 9 Return air plenum Supply aif duCib Occupied area 12.5-44 53-58 197 -200 170-172 9.21 -14.0 1149-1245 B Return air plenum €.44-18.3 78 -158 225 - 756 173 - 455 20-57 1350 -2620 ir> Supply airducts Q Q O' Occupied area 7.93 -14.8 61-87 132-183 9.01 -137 10.8 • 11.0 904- 1184 7 Relum air plenum 5.27-10.3 74 -153 189-706 160-340 23-54 1150 -3580 Supply air ducts S a G) Occupied area 4.69 - 5.81 55-71 77-171 38-233 8.71 - 11.3 1162-3113 Q nj I 5 Return air plenum 5.43-49 64 -127 150-399 101-279 19.5-35 1640-9640 o Supply air fans 2.77 -41 54 - 192 113-686 165-2750v7 16.1 -48 2270-16600 c £ i N C

CO co co

CO

NYC-WTC_000386709

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000386709Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000182143

Summary of survey results for metals in floors, ducts, and elevators at 130 Liberty Street conducted between September 2001 and January 2002.

Similar indexed content

Compare copies and versions →