NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 1 page

Daily work force report, World Trade, Dec 15, 2001 (Day)

Machine-extracted title · confidence 38%

Day shift daily workforce and equipment listing for World Trade site, Dec 15, 2001.

NYC-WTC_000386653
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

GRACE CONTR/ CTING CORP. 15M5 6lhRoad, Whitestont N.Y. 11357-(718) 767-9000 DATE; DECEMBER 15, 2001 (DAY FINAL)

DAILY WORK FORCE REPORT I ________ ;______ i_______________ Job Name & Location: World Trade Center Contract No. Weather Conditions

Labor II Equipment : CLASSIFICATION QUANT. ][I Description MANNED STANDBY IDLE SUPERINTENDENT “i ICAT 966 LOADER 1 PROJECT ENGINEER 1 <CAT 446 BACKHOE 1 OFFICE ENGINEER . CAT 973 LOADER 1 FOREMEN__________ 1 ■ CAT 365 GRAPPLER 1 SAFETY OFFICER | 1 CAT 375 GRAPPLER 1 LABORERS 22 HITACHI 750 GRAPPLER 1 IRON WORKERS 1 HITACHI 650 GRAPPLER 1 LOCAL 14 7 HITACHI 550 GRAPPLER 1 LOCAL 15_______ _____________ 10 HITACH11200 GRAPPLER 1 CARPENTER_____ _____________ 185 CFM COMPRESSOR 1 CARPENTER FOREMAN 1 235 HAMMER HOE RAM 1 TEAMSTERS 1 MECHANICS TRUCK 2 MECHANICS_______ ;__________________ 2 TOOL TRUCK HOUSE WRECKERS . 9 TOOLVAN 1 ROLL OFF 1 DUMP..TRAILERS LOW BED TRAILER (DELIVERIES: HIGH DECK TRAILERS WELDING TRUCK 1 IIfUEL TRUCK ~ 1 PICKUP TRUCKS 6 LIGHT TOWERS 13 SITE MULE 3 DUMP TRUCKS 10 WHEEL DUMP TRUCK FLASHING ARROW BOARD 1 GRACE AREA; 17 OFFICE TRAILER/GENER. 1 EUKES: 79 CARGO BOXES 4 FLATBEDS DOWNSTAIRS: 9 FLAT TRUCK 1 TULLY FLATBEDS: 22 PUMP 2 ROLLER 1 RAINMAKER/GENIE LIFT. 1

Description of Work: COMPLETED WORK___________________________________________ MANNED TARPING AND TRIMMING STATIONS_____________________ MANNED WATER STATIONS FOR DUST CONTROL_________________ MAINTAIN TRAFFIC FLOW IN AND OUT OF AREA__________________ COfT™UEJ?EMOyiNG_DE£RISJ[ROMJ;n^ ELEVATIONS: ALL MACHINES LEVEL B-5 253_____________________ DELAYS: 7-830 AM SAFETY MEETING FOR ALL 14 AND 15 MEN

GRACE contracting CQRP. Approved By; Title; BY: SUPERINTENDENT

I DAILYWO8K-FORGEREPORT1215D.xls

CITY_21MC100_003695198

NYC-WTC_000386653

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000386653Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000290105

Daily workforce details for World Trade site, Dec 20 2001.

Similar indexed content

Compare copies and versions →