NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 1 page

Daily work force report, World Trade, Dec 6, 2001 (Night)

Machine-extracted title · confidence 38%

Night shift daily workforce and equipment listing for World Trade site, Dec 6, 2001.

NYC-WTC_000386647
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

i GRACE CONTRACTING CORP. 151-45 6th Road. Whitestone. N.Y. 11357-(718) 767-9000 DATE: DECEMBER 6, 2001 (NIGHT FINAL) j T DAILY WORK FORCE REPORT i Job Name & Location: World Trade Center Contract No. I Weather Conditions

: Labor Equipment CLASSIFICATION QUANT. Description MANNED STANDBY IDLE SUPERINTENDENT 2 CAT966 LOADER. 1 PROJECT ENGINEER CAT 446 BACKHOE 1 OFFICE ENGINEER 1 CAT 973 LOADER 1 FOREMEN 1 CAT 365 GRAPPLER 1 SAFETY OFFICER CAT 375 GRAPPLER 1 LABORERS 20 HITACHI 750 GRAPPLER 1 IRON WORKERS_____ HITACHI 550 GRAPPLER 1 LOCAL 14 5 HITACHI 550 GRAPPLER 1 » LOCAL 15 8 HITACH11200 GRAPPLER 1 CARPENTER_______ 185 CFM COMPRESSOR 1 CARPENTER FOREMAN 235 HAMMER HOE RAM 1 TEAMSTERS_______ 10 MECHANICS TRUCK 1 1 MECHANICS 1 TOOLTRUCK 1 HOUSE WRECKERS 7 TOOL VAN ROLLOFF PUMP TRAILERS_________ 7 LOW BED TRAILER HIGH DECK TRAILERS 2 WELDING TRUCK FUEL TRUCK 1 - PICKUP TRUCKS 2 LIGHT TOWERS 13 SITE MULE 3 DUMP TRUCKS 10 WHEEL DUMP TRUCK FLASHING ARROW BOARD 1 OFFICE TRAILER/GENER. 1 CARGO BOXES 3 FLAT TRUCK 1 PUMP 2 ROLLER II RAINMAKER/GENIE LIFT 1

Description of Work:____________________ _______________________ __ ________________________________________ LOADS OUT: 26 DUMP TRAILERS/HIGH BEDS; 33 EUCLIDS i LOAD OUT STEEL AND DEBRIS_________________________________ __________________________________________ MAN TARPING AND TRIMMING STATIONS 7 MAN WATER STATIONS FOR DUST CONTROL__________________ _ _____________________________________ ' CONTINUE REMOVING DEBRIS FROM LOWER LEVELS OF NW CORNER OF TOWER 2 TO MEET AMEC’S ROADWAY. CONTINUE BURNING OF THE NORTH WALL COLUMNS______________ ________________________________________ _ ELEVATIONS: ALL MACHINES LEVEL B-5 253 __________________________________________________________ DELAYS: TOTAL DELAYS OF MACHINES IN HOLE APPROXIMATELY 1 HR FOR FDNY:_______________________ . FREON RECOVERY FROM 7-10:30 PM, NO DUMP TRAILERS LOADED.l GRACE CONTI^TING CORP Approved By: Tide: SUPERINTEND^T HbY: .X For:

DAILY WORK FORCE REPORT 1206N.xls I

CITY_21MC100_003695191

NYC-WTC_000386647

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000386647Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →