Daily work force report, World Trade, Dec 5, 2001 (Night)

Machine-extracted title · confidence 38%

Night shift daily workforce and equipment listing for World Trade site, Dec 5, 2001.

NYC-WTC_000386645
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

I GRACE CONTRACTING CORP. . ’.SI-45 6th Road, Whitestone.' N.Y. 11357-(713) 767-9000 DATE: DECEMBER 5. 2001 (NIGHT FINAL)

DAILY WORK FORCE REPORT

Job Name & Location: World Trade Center Contract No. I Weather Conditions i Labor ~'.~TI Equipment CLASSIFICATION QUANT. [ Description MANNED STANDBY IDLE [cat 966 LOADER 1 SUPERINTENDENT , [cat 446 BACKHOE 1 PROJECT ENGINEER t|CAT 973 LOADER OFFICE ENGINEER 1 1 FOREMEN 2 CAT 365 GRAPPLER 1 SAFETY OFFICER CAT 375 GRAPPLER 6 Hrs. 6 Hrs. LABORERS__________ _ 20 HITACHI 750 GRAPPLER 1 IRON WORKERS HITACHI 550 GRAPPLER 1 LOCAL 14_____________ 5 HITACHI 550 GRAPPLER 1_ £ LOCAL 15_____________ 8 HITACHI 1200 GRAPPLER 1 i CARPENTER 185 CFM COMPRESSOR 1 CARPENTER FOREMAN 235 HAMMER HOE RAM 6 Hrs. TEAMSTERS 10 MECHANICS TRUCK 1 1 i MECHANICS ; ' 1 TOOL TRUCK 1 I HOUSE WRECKERS . 10 TOOL VAN ROLL OFF DUMP TRAILERS 7 LOW BED TRAILER HIGH DECK TRAILERS 2 WELDING TRUCK FUELTRUCK 1 PICKUP TRUCKS 2 LIGHT TOWERS 13 SITE MULE . 3 DUMP TRUCKS 10 WHEEL DUMP TRUCK FLASHING ARROW BOARD 1 OFFICE TRAILER/GENER. 1 CARGO BOXES 3 FLAT TRUCK 1 ijpUMP 2 IIROLLER 1 iRAINMAKER/GENIE LIFT 1

Description of Work:_____________________________________________ ________________________________________ , LOADS OUT: 27 HI-BEDS/DUMP TRAILERS; 34 EUCLIDS ' LOAD OUT STEEL AND DEBRIS____________________________ __ ___________________________________________ i MAN TARPING AND TRIMMING STATIONS________________________________________________________________ : MAN WATER STATIONS FOR DUST CONTROL [ CONTINUE REMOVING DEBRIS FROM LOWER LEVELS OF NW CORNER OF TOWER 2 TO MEET AMEC'S ROADWAY ELEVATIONS: ALL MACHINES LEVEL B-5 253________________ ____________________________________________ j DELAYS FROM 7-10PM FOR FREON RECOVERY; AND MULTIPLE BODY RECOVERIES THROUGHOUT THE NIGHT GRACE CONTRACTING CORP Approved By: Title: •fSF SUPERINTENDENT

DAILY WORK FORCE REPORT 1205N.xls

CITY_21MC100_003695189

NYC-WTC_000386645

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000386645Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →