GRACE CONTFtACTING CORP. -S1-45 6lh Road, Whitestone, N Y. 11357-(718) 767-0000 DATE: MONDAY 12/3/01 NIGHT (FINAL)
DAILY WORK FORCE REPORT
Job Name & Location: World Trade Center Contract No. Weather Conditions CLEAR & COOL =s _____________________ : Labor_________ Equipment ■ CLASSIFICATION QUANT. Description MANNED STANDBY OLE SUPERINTENDENT 2 CAT 966 LOADER 1 PROJECT ENGINEER .________________ 1 CAT 446 BACKHOE 1 OFFICE ENGINEER !________________ CAT 973 LOADER 1 I FOREMEN___________ 1 CAT 365 GRAPPLER 1 iI SAFETY OFFICER_____________________ CAT 375 GRAPPLER 1 LABORERS 16 HITACHI 750 GRAPPLER 1 IRON WORKERS ■ HITACHI 550 BACKHOE 1 LOCAL 14 5 llHITACHI 550 GRAPPLER 1 LOCAL 15____________ 8 [ HITACHI 1200 GRAPPLER 1 CARPENTER_________ ________________ 1135 CFM COMPRESSOR 1 1235 HAMMER HOE RAM CARPENTER FOREMAN________________ TEAMSTERS_________ _______________ 11 ■ MECHANICS TRUCK 1 1 MECHANICS_________ .. 1 ■ TOOLTRUCK HOUSE WRECKERS 7 ■ TOOL VAN ■ ROLL OFF ■ DUMP TRAILERS 7 ■ LOW BED TRAILER ■ HIGH DECK TRAILERS 3 )G INTO VISTA FROM EAST WITH 1200 - LOADED EUKES ■ WELDING TRUCK ■ 5 DUG PARALLEL TO WEST SIDE OF WEST WALL ■ FUELTRUCK 1 PROGRESSING NORTH - LOADED EUKES ■ PICKUP TRUCKS 2 750 DUG PARALLEL TO SOUTH SIDE OF NORTH WALL LIGHT TOWERS 13 PASSED DEBRIS TO GATEWAYS 550 THEN TO 365 ~ SITE MULE 3 DROPPED PORTION OF WEST WALL____________________ ■ DUMP TRUCKS TULLY DRESSED ROAD WITH MILLINGS ■ 10 WHEEL DUMP TRUCK DUG OUT MILLINGS WEST OF 750 TON CRANE TO LEVEL ■ FLASHING ARROW BOARD 1 AND SET MATS. | ■ OFFICE TRAILER/GENER. 1 i NOTE: TULLY'S PC750 FELL INTO SOUTH PORTION OF ■ CARGO BOXES 3 WEST SLURRY WALL-1200 PULLED IT UP. ■ FLAT TRUCK ■ PUMP 2 ■ ROLLER ■ RAINMAKER/GENIE LIFT 1
Description of Work:
LOADS OUT:91. EUKE LOADS 17________________ LOAD OUT STEEL AND DEBRIS . MANNED TAPPING AND TRIMMING STATIONS MANNED WATER STATIONS FOR DUST CONTROL MAINTAIN TRAFFIC FLOW IN AND OUT OF AREA EXCAVATE & GRADE CRANE PAD - SET MATS
GRACE CONTRACTING CORP Approved By: Title: ~ BY: For: SUPERINTENDENT '
i DAILY WORK FORCEi REPORT 1203N.xls I ! I
CITY_21MC100_003695187
NYC-WTC_000386643
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
NYC-WTC_000305614
Night shift daily workforce and equipment details for WTC project on December 3, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.982
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000279002
Nightly workforce and equipment at World Trade site, December 3, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.982
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000291297
Day final daily workforce report for World Trade site (Dec 10, 2001).
1 shared non-person entities · 1 shared topics · similarity 0.978
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000291383
December 3, 2001 night final daily work force report for World Trade Center site.
2 shared non-person entities · 1 shared topics · similarity 0.977
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000278624
Night final daily workforce report showing crews and equipment at site.
1 shared non-person entities · 1 shared topics · similarity 0.976
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000429677
Day shift daily workforce and equipment allocations for World Trade Center project.
2 shared non-person entities · 1 shared topics · similarity 0.976
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000278690
Night shift daily workforce and equipment at World Trade Center, December 3, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.976
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000388157
Daily workforce and equipment deployment at World Trade Center project.
2 shared non-person entities · 1 shared topics · similarity 0.976
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000279722
Labor/equipment counts and daily workforce details for World Trade Center project, Dec 3, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.975
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000237597
A daily report from Grace Contracting Corp. detailing the workforce and equipment deployed at the World Trade Center site on December 11, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.975
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305374
Day shift final daily workforce report for World Trade Center site, Dec 5, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.975
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000291248
Daily workforce summary for World Trade Center site, Nov 9, 2001.
1 shared non-person entities · 1 shared topics · similarity 0.975
machine-extracted · confidence unavailable · Check page ↗No available related records indexed in this group.
Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
NYC-WTC_000305614
Night shift daily workforce and equipment details for WTC project on December 3, 2001.
Similarity score 0.991 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000279002
Nightly workforce and equipment at World Trade site, December 3, 2001.
Similarity score 0.991 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000291297
Day final daily workforce report for World Trade site (Dec 10, 2001).
Similarity score 0.989 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000291383
December 3, 2001 night final daily work force report for World Trade Center site.
Similarity score 0.988 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000278624
Night final daily workforce report showing crews and equipment at site.
Similarity score 0.988 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000429677
Day shift daily workforce and equipment allocations for World Trade Center project.
Similarity score 0.988 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000305614
Night shift daily workforce and equipment details for WTC project on December 3, 2001.
Similar indexed content
NYC-WTC_000279002
Nightly workforce and equipment at World Trade site, December 3, 2001.
Similar indexed content
NYC-WTC_000291297
Day final daily workforce report for World Trade site (Dec 10, 2001).
Similar indexed content
NYC-WTC_000291383
December 3, 2001 night final daily work force report for World Trade Center site.
Similar indexed content
NYC-WTC_000278624
Night final daily workforce report showing crews and equipment at site.
Similar indexed content