GRACE CONTRACTING CORP. 151.45 6th Road, Whitestone. N.Y. 11357-(718) 767-9000 DATE: MONDAY 12/3/01 NIGHT (FINAL)
DAILY WORK FORCE REPORT
Job Name & Location: World Trade Center Contract No. Weather Conditions CLEAR & COOL
; Labor Equipment ; CLASSIFICATION QUANT. Description MANNED STANDBY DLE SUPERINTENDENT i 2 CAT 966 LOADER 1 PROJECT ENGINEER ;________________ 1 CAT 446 BACKHOE 1 ,OFFICE ENGINEER ;________________ CAT 973 LOADER 1 FOREMEN___________ ________________ 1 CAT 365 GRAPPLER 1 SAFETY OFFICER CAT375GRAPPLER 1 LABORERS 16 HITACHI 750 GRAPPLER 1 IRON WORKERS HITACHI 550 BACKHOE 1 LOCAL 14 5 HITACHI 550 GRAPPLER 1 LOCAL 15 8 HITACH11200 GRAPPLER 1 CARPENTER______ ____________ 185 CFM COMPRESSOR 1 CARPENTER FOREMAN____________ 235 HAMMER HOE RAM TEAMSTERS 11 MECHANICS TRUCK 1 1 MECHANICS 1 TOOL TRUCK HOUSE WRECKERS 7 TOOL VAN ROLLOFF DUMP TRAILERS 7 LOW BED TRAILER HIGH DECK TRAILERS 3 DUG INTO VISTA FROM EAST WITH 1200 - LOADED EUKES WELDING TRUCK 375 DUG PARALLEL TO WEST SIDE OF WEST WALL FUEL TRUCK 1 PROGRESSING NORTH - LOADED EUKES PICKUP TRUCKS 2 750 DUG PARALLEL TO SOUTH SIDE OF NORTH WALL LIGHT TOWERS 13 PASSED DEBRIS TO GATEWAYS 550 THEN TO 365 SITE MULE 3 DROPPED PORTION OF WEST WALL___________________ DUMP TRUCKS TULLY DRESSED ROAD WITH MILLINGS 10 WHEEL DUMP TRUCK DUG OUT MILLINGS WEST OF 750 TON CRANE TO LEVEL FLASHING ARROW BOARD 1 AND SET MATS. OFFICE TRAILER/GENER. 1 NOTE: TULLY'S PC750 FELL INTO SOUTH PORTION OF CARGO BOXES 3 WEST SLURRY WALL -1200 PULLED IT UP. FLAT TRUCK PUMP 2 ROLLER RAINMAKER/GENIE LIFT 1
Description of Work:
LOADS OUT:91, EUKE LOADS 17__________ LOAD OUT STEEL AND DEBRIS MANNED TARPING AND TRIMMING STATIONS MANNED WATER STATIONS FOR DUST CONTROL MAINTAIN TRAFFIC FLOW IN AND OUT OF AREA EXCAVATE & GRADE CRANE PAD - SET MATS
GRACE CONTRACTING CORP Approved By: Title: For: SUPEraNTENDENT
DAILY WORK FORCE REPORT 1203N.xls
I CITY_21MC100_006972372
NYC-WTC_000279002
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
NYC-WTC_000305614
Night shift daily workforce and equipment details for WTC project on December 3, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.991
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000291383
December 3, 2001 night final daily work force report for World Trade Center site.
2 shared non-person entities · 1 shared topics · similarity 0.989
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305228
Night final daily workforce and equipment at World Trade site, Dec 3, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.988
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000279722
Labor/equipment counts and daily workforce details for World Trade Center project, Dec 3, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.986
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000278690
Night shift daily workforce and equipment at World Trade Center, December 3, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.986
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000388366
Night shift daily workforce and equipment at World Trade site, Dec 3, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.986
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305371
Night final daily workforce report with equipment for World Trade Center, Dec 3, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.984
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000280007
Night shift workforce and gear at World Trade Center, December 3, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.984
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000291310
Night preliminary daily workforce report for World Trade Center site; labor and gear listed.
2 shared non-person entities · 1 shared topics · similarity 0.983
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000279000
Night daily workforce and equipment for World Trade, December 4, 2001.
3 shared non-person entities · 1 shared topics · similarity 0.983
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000386643
Daily workforce and equipment listing for World Trade site, Dec 3, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.982
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000419239
Night final daily workforce report for World Trade Center site, Dec 3, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.982
machine-extracted · confidence unavailable · Check page ↗No available related records indexed in this group.
Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
NYC-WTC_000305614
Night shift daily workforce and equipment details for WTC project on December 3, 2001.
Similarity score 0.995 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000291383
December 3, 2001 night final daily work force report for World Trade Center site.
Similarity score 0.995 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305228
Night final daily workforce and equipment at World Trade site, Dec 3, 2001.
Similarity score 0.994 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000279722
Labor/equipment counts and daily workforce details for World Trade Center project, Dec 3, 2001.
Similarity score 0.993 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000278690
Night shift daily workforce and equipment at World Trade Center, December 3, 2001.
Similarity score 0.993 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000388366
Night shift daily workforce and equipment at World Trade site, Dec 3, 2001.
Similarity score 0.993 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000305614
Night shift daily workforce and equipment details for WTC project on December 3, 2001.
Similar indexed content
NYC-WTC_000291383
December 3, 2001 night final daily work force report for World Trade Center site.
Similar indexed content
NYC-WTC_000305228
Night final daily workforce and equipment at World Trade site, Dec 3, 2001.
Similar indexed content
NYC-WTC_000279722
Labor/equipment counts and daily workforce details for World Trade Center project, Dec 3, 2001.
Similar indexed content
NYC-WTC_000278690
Night shift daily workforce and equipment at World Trade Center, December 3, 2001.
Similar indexed content