Daily workforce report, World Trade Center site

Machine-extracted title · confidence 28%

Night final daily workforce report for World Trade Center site, Dec 3, 2001.

NYC-WTC_000419239
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

, GRACE CONTRACTING CORP. 151-45 8th Road. Whitestone. N.Y. 11357-(718) 767-9000 DATE: MONDAY 12/3/01 NIGHT (FINAL)

DAILY WORK FORCE REPORT

Job Name & Location: World Trade Center I

Contract No. Weather Conditions CLEAR & COOL

Labor Equipment CLASSIFICATION QUANT. Description MANNED STANDBY IDLE SUPERINTENDENT 2 CAT 966 LOADER 1 PROJECT ENGINEER 1 CAT 446 BACKHOE 1 OFFICE ENGINEER CAT 973 LOADER 1 FOREMEN 1 CAT 365 GRAPPLER 1 SAFETY OFFICER CAT 375 GRAPPLER i LABORERS 16 HITACHI 750 GRAPPLER 1 IRON WORKERS HITACHI 550 BACKHOE 1 LOCAL 14 5 HITACHI 550 GRAPPLER 1 LOCAL 15 8 HITACHI 1200 GRAPPLER 1 CARPENTER 185 CFM COMPRESSOR 1 CARPENTER FOREMAN 235 HAMMER HOE RAM TEAMSTERS 11 MECHANICS TRUCK 1 1 MECHANICS 1 TOOL TRUCK HOUSE WRECKERS 7 TOOL VAN ROLL OFF DUMP TRAILERS 7 LOW BED TRAILER HIGH DECK TRAILERS 3 DUG INTO VISTA FROM EAST WITH 1200 - LOADED EUKES WELDING TRUCK 375 DUG PARALLEL TO WEST SIDE OF WEST WALL FUEL TRUCK 1 PROGRESSING NORTH - LOADED EUKES PICKUP TRUCKS 2 750 DUG PARALLEL TO SOUTH SIDE OF NORTH WALL LIGHT TOWERS 13 PASSED DEBRIS TO GATEWAYS 550 THEN TO 365 SITE MULE 3 DROPPED PORTION OF WEST WALL DUMP TRUCKS TULLY DRESSED ROAD WITH MILLINGS 10 WHEEL DUMP TRUCK DUG OUT MILLINGS WEST OF 750 TON CRANE TO LEVEL FLASHING ARROW BOARD 1 AND SET MATS. I ■ OFFICE TRAILER/GENER. 1 NOTE: TULLY'S PC750 FELL INTO SOUTH PORTION OF ■ CARGO BOXES 3 WEST SLURRY WALL - 1200 PULLED IT UP. ■ FLAT TRUCK ■ PUMP 2 ■ ROLLER ■ RAINMAKER/GENIE LIFT 1

Description of Work;

LOADS OUT:91, EUKE LOADS 17 iLOAD OUT STEEL AND DEBRIS________________ MANNED TARPING AND TRIMMING STATIONS MANNED WATER STATIONS FOR DUST CONTROL MAINTAIN TRAFFIC FLOW IN AND OUT OF AREA EXCAVATE & GRADE CRANE PAD - SET MATS

GRACE CONTRACTING CORP Approved By: Title: BY: For: SUPEIiraNTENDENT ’

DAILY WORK FORCE REPORT 1203N.xls 01.301422

CITY_21MC100_004157116

NYC-WTC_000419239

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000419239Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000280007

Night shift workforce and gear at World Trade Center, December 3, 2001.

Similar indexed content

Compare copies and versions →