NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 314 pages

Terrorism-related NYC form, 2001-2002

Machine-extracted title · confidence 25%

Form containing terrorism-related materials; NYC archives material.

NYC-WTC_000385123–000385436
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

11-27 CONDEMNATION AND DESTRUCTION §11.05

§ 11.05 Length of Restoration Period

Very little time and energy is focused on establishing an outside date for the completion of restoration work to repair the damages from a fire or casualty or to restore the loss of a portion of the premises from a partial condemnation.' Restoration rights and the extension of a lease term dur­ ing the restoration period are not as of right. They must be negotiated and clearly provided for in the lease; In addition, the parties should set some parameters for the length of time that is reasonable to complete the resto­ ration work. Some restorations can take years. Whether or not the landlord is required to restore and irrespective of the presence of insurance proceeds. as a practical matter, the adjustment process, the permit process for demo­ lition and the actual restoration can seem interminably long. The logistics of a restoration may be daunting, causing many tenants to end the rela- tionship and move on rather than come back to the premises, even if good will may be present at that location and a favorable lease is in place. Each tenant must assess its individual position to determine how long it can afford to wait to move back into its premises. For instance, if the lease is considerably below market it may be in the tenant’s best interest to stick it out and return to the premises after the work is finished, even if that takes years. Provided that the tenant is able to cause the term of the existing lease (and construction,abatement periods during initial fit-up) to move into abeyance and not to erode during the rebuilding process, the longer the process takes, the more valuable the leasehold interest may become. For instance, consider a brand new lease with the space under initial alterations, at S20 per square foot and with a six month free rent period during construction, a S50 per square foot market and a building that is destroyed. During the three years it might take to rebuild the build­ ing, at the end of the restoration the tenant may still have a considerable amount of time remaining in its term and an uneroded initial construction abatement period. If the costs in the market have increased at a normal compounding rate and the outside costs ‘ are considerably higher, the ten­ ant ihight realize an even greater saving if its lease survives and extends.

* If the parties have elected a “no fault” insurance scheme, this should be the only practical and material issue at stake. Under “no fault." if a tenant expects to return to its valuable leasehold premises, the only question is when. 2 Outside costs include additional rentals such as taxes and operating expenses.

491

NYC-WTC_000385181

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000385181Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

No available related records indexed in this group.

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000137113

Archival folder label for September 11 news clippings from the Office of the Mayor, identified as Folder 0124.

Similar indexed content

NYC-WTC_000136990

Archival folder label for September 11 news clippings from the Office of the Mayor, identified as Folder 0123.

Similar indexed content

Compare copies and versions →