Limited Prospects for New Supply thus do little to alleviate the near-term scarcity of space in
Developers will respond to the market signals and build new New York City.
space to alleviate the extraordinary shortages that exist. But
Preliminary site work had begun at three other midtown
it will likely take a few years, plus a further runup in market
projects - i.e., Times Square Tower, the New York Times
rents, before market conditions will have returned to
building on Eighth Avenue, and 300 Madison Avenue.
normal.
These three projects encompass 3.7 million square feet and
Many of the downtown buildings damaged during the were 70% pre-leased prior to the terrorist attack. The Times
terrorist attack can be repaired and restored to their former Square Tower project and CISC's 300 Madison Avenue were
condition. A team of structural engineers and architects is scheduled to begin construction before yearend 2001. The
currently sun/eying the extent of the structural damages. New York Times project does not yet have a firm
While the team's findings will yield more definitive construction-start date, but construction presumably could
conclusions, it now appears that six class A buildings with 13 commence quickly.
million square feet (i.e., the World Trade Center complex)
Dozens of other development projects have been proposed,
were either destroyed or damaged beyond repair, that two
and four in particular have fully assembled sites and are far
other nearby buildings with 2.6 million square feet
enough along in the planning process that construction
sustained extensive structural damage, but that the other 14
could conceivably commence within a year or so. These
damaged buildings containing 16 million square feet of
four projects with 4.4 million square feet are the Durst
space will be repaired eventually.
Organization's Cyber Center on west 57th Street, the Ruben-
More than half of the 16 million square feet in those Vornado project at 20 Times Square above the Port
damaged buildings should be ready for occupancy within Authority, the Milstein Family project at Eighth and 42nd
the next 3-to-12 months. Five class A buildings with 8.3 and the Edward Minskoff - City of NY project at Battery Park
million square feet sustained only superficial damage to City Site SB. Considering how difficult it is generally for
their facades and windows, and it's generally believed that developers to obtain the necessary approvals and permits,
all five will be ready, for occupancy within a year. Indeed, it's unlikely that these projects could be completed much
one of the two Merrill Lynch buildings within the World before 2005.
Financial Center, 4 WFC, should be operational within two- When the projects that are under construction are
to-three months; and its other building, 2 WFC, should be combined with those that are planned and could be jump-
fully operational within nine-to-twelve months. started, they add up to 15.7 million square feet of new
space. This increment would boost New York City's
In addition, at the time of the attack, eight new buildings
inventory slightly above the level that it was at just prior to
with 7.6 million square feet were at various stages of
last week's terrorist attack.
construction in midtown Manhattan. Prior to the disaster,
these eight new buildings were 87% pre-leased, and will
Special report
New York City Office Market 6
^^2 1 Gruhb&Ellis
Property Solutions Worldwide
NYC-WTC_000385240
OCR can misread numbers and units. Confirm readings against the page image before using them.