NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 7 pages

Chain-of-custody, WTC dust cleanup project, 6/02

Machine-extracted title · confidence 33%

Draft chain-of-custody outlining regulatory compliance for dust cleanup and air sampling after WTC attack.

NYC-WTC_000363042–000363048
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

scheduling visits vdth residents.

Technicians Air monitoring teclmicians must possess valid NYS Asbestos Project Sampling Technician (APST) certificates. Technicians must have performed air sampling for at least 6 months.

D. Specifications

Clean up activities shall be scheduled for 20 to 30 units per day. Air sampling shall also be provided at 10 to 20 units where clean up activities are net scheduled. Sufficient personnel shall be available for project monitoring and sampling.

Sampling equipment must be in sufficient quantity to provide the amount and type of samples required for this project. At a minimum the following equipment are required: air-sampling pumps with flow rate capacities of 10 liters per minute, tripods, rotometers, sample cassettes with mixed cellulose ester filters having pore size of 0.45um. Contractors should be prepared to go to 0.8um filters if 0.45um filters clog.

The contractor shall prepare a Health and Safety Plan (HASP) in accordance with 29 CFRl 910.1001 and 29 CFR 1926.58. All personnel involved in residential cleaning and monitoring activities shall follow the contractor Health and Safety Plan (HASP) prepared by their employer. EPA shall be provided with a copy of the employer HASP prior to the start of work. Individuals performing clean up activities may wear personal protective equipment or respirators in accordance with their employer’s health amd safety plan. All cleaning operations will be conducted in accordance with the Cleaning Contract Scope of Work.

Copies of all invoices for work conducted under this contract shall be provided to USEPA and DEP.

The Project Monitor shall direct and coordinate all services and report all findings to USEPA. The scope of this project will be as follows:

5. The Project Monitor shall be responsible for accessing a secure EPA Website (url, user name and password to be provided by EPA). In coordination with the USEPA OSC, the Project Monitor will access residential services requested from the Website and schedule clean-up activities and air sampling with the tenants/owners, project monitors, asbestos abatement contractors and air monitoring technicians to the various apartments. The Project Monitor will then supply relevant information on activities back into the EPA Indoor Air database via the secure EPA website. Data to be input may include but is not limited to start and completion dates for the cleaning, sampling dates and sample identification numbers.

6. The Project Monitor will schedule and conduct pre-cleaning and pre-sampling inspections

2

CITY_2IMCl00_000439057 NYC-WTC_000363043

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000363043Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →