NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 12 pages

Lab report: WTC debris cleaning scope, July 2002

Machine-extracted title · confidence 36%

Laboratory text outlining compliance with EPA/OSHA/NYSDOL regulations for cleaning and sampling related to WTC debris.

NYC-WTC_000362992–000363003
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

shall use F2L for all sample and chain-of-custody documentation. This data shall be provided to EPA within 24 hours of completion of the sampling.

Deliverables

The Project Monitor shall review all deliverables prior to submission to EPA. The review shall assure that each deliverable is accurate and complete, technically sound, and free of clerical errors.

The Project Monitor shall submit upon request a field package consisting of field sheets, field notes (copy), and chain-of-custody forms (copy) shall be delivered to the; EPA via email, or an alternative format agreed upon. The Contractor must sign and date aJI field sheet-fed logbooks and chain-of-custody forms. This data shall be provided daily upon request at the activity completion. IBs 12. The Project Monitor shall perform final visual inspectit completion of the cleaning. If all areas are not dust free then the Project Monitor wi e Cleaning Contractor to reclean as necessary. If all areas are dust free 1 le Projec or will authorize final air sampling. Final inspections shall be doer ’ sing the E Checklist. Il* Deliverables ■

The Project Monitor shall review all de.iverables prior to submission to EPA. The review shall assure that each deliverable is accurate and complete, technically sound, and free of clerical errors. F The Project Monitor s ibmi t upon request to EPA copies of the log book pages via email, fax. or alteniative >rccd upon.

13. The Project Monit< will conduct a post-cleaning inspection of the apartment with the resident at the completion tee sampling. The resident should inspect the apartment and identify any damage atthiw ; and sign-off on the Proj ect Completion Form. Any damage or loss to an apartment or its nteiiLs shall be documented on this form.

Deliverables

The Project Monitor shall review all deliverables prior to submission to EPA. The review shall assure that each deliverable is accurate and complete, technically sound, and free of clencal errors.

The Project Monitor shall submit upon request to the EPA copies of the log book as requested via fax or alternative format agreed upon and within two days of request. Final air sampling shall be performed with 24 hours of final visual inspection.

14. Post Clean-up Air Sampling Procedures

CITY_21MC100_003754684

NYC-WTC_000363000

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000363000Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000140306 · Box DEP Box 05

Procedures for obtaining work authorization, monitoring residential and HVAC cleaning, and reporting hazardous conditions to EPA.

Similar indexed content

NYC-WTC_000332061

Draft scope of work for WTC dust cleaning and related regulatory alignment.

Similar indexed content

Compare copies and versions →