NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 12 pages

Lab report: WTC debris cleaning scope, July 2002

Machine-extracted title · confidence 36%

Laboratory text outlining compliance with EPA/OSHA/NYSDOL regulations for cleaning and sampling related to WTC debris.

NYC-WTC_000362992–000363003
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

password to be provided by EPA). Dates for monitoring and/or cleaning shall be provided to EPA and DEP electronically in an EPA approved format within 24 hours. Infonnation on sampling activities (date, sample ID) will be provided to EPA, via the website, within 24 hours of completion of evaluation.

Deliverables

The Proj ect Monitor shall review all deliverables prior to submission to EP. ;vicw shall assure that each deliverable is accurate and complete, technically sound, i of clerical errors.

The Project Monitor shall record all post-cleaning information in 1 le EPA Indoor Air database or an agreed upon electronic format. This infonnation shall ip lude, but is not limited to sampling technique (aggressive or modified aj iye), visually ch:aned (Y/N), damage claim (Y/N), and post clean-up status (pass/fail). ;s and times sblall be associated with all activities including start and finish date. ■Bk....... Additional information including but not linnited to, a bsence of dust/debris, equipment used (leaf blower, fan etc.), size of space, start a; completic>n dates for the cleaning, sample media, flow media f/pe, flow rates (start/final, £1 (w rate (i srage), time (start/fmish), total elapsed time (min), calculated samj olume (L), pump fault, weather, units, QC samples (lot blank). sampling dates, sample IDs complete < ■custody forms, EPAProjectTrackingNumbers and laboratory address sh 1 be entei In agreed upon electronic format or website approved by EPAwithin: lurs of activity. Dates and times shall be associated with all acti\ ities including start at lisli date.

15. The Project Monitc will Ci implete a daily report which documents cleaning starts, continuations, con teons. air sampling, recleaning and any delays or difficulties encountered.

Deliverables

'he Project M itor shall review all deliverables prior to submission to EPA. The review shall ssureth deliverable is accurate and complete, technically sound, and free of clerical pr

The Project Monitor shall submit upon request the completed Project Completion Form to the into the EPA Indoor Air web database or an agreed upon alternative electronic format or website approved by EPA within 24 hours of activity.

16. EPA will notify residents and owners of results of sampling conducted as part of this project.

CITY_21MC100_003754686

NYC-WTC_000363002

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000363002Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000140306 · Box DEP Box 05

Procedures for obtaining work authorization, monitoring residential and HVAC cleaning, and reporting hazardous conditions to EPA.

Similar indexed content

NYC-WTC_000332061

Draft scope of work for WTC dust cleaning and related regulatory alignment.

Similar indexed content

Compare copies and versions →