NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 9 pages

WTC Dust Cleaning, Draft 8/2/2002

Machine-extracted title · confidence 46%

Draft permit with hotline and cleanup options for WTC debris dust.

NYC-WTC_000362931–000362939
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

7. The cleaning contractor shall notify the monitoring contractor immediately upon completion ofthe cleaning. The Monitoring Contractor will conduct a thorough visual inspection to verify the absence ofvisible dust accumulations. Ifdust is observed the cleaning contractor will reclean as necessary at no additional cost.

8. Air sampling shall be performed by the Monitoring Contractor after the area is free of dust accumulations as determined by the Monitoring Contractor. The residence will be recleaned and retested if the clean-up criteria of0.0009 fibers/cc (PCME measured by TEM) is not achieved or if determined necessary by EPA. This clean-up criterion may be reevaluated and revised, if determined necessary based on field conditions and analytical limitations.

9. Any damage or loss that occurs during cleaning is the responsibility ofthe cleaning contractor. The cleaning contractor is not responsible for damage or loss caused by the acts of third parties not involved in the cleaning activities.

10. Residents may identify and tag certain fumi shings (e.g. carpets and fabric covered furniture) for disposal rather than cleaning. Disposal ofresi dents ’ personal property shall not occur without prior written authorization by the owner.

11. Disposal of all wastes generated during the cleaning shall be the responsibility ofthe contractor. All waste generated shall be treated as asbestos-containing material (ACM). Transportation and disposal of generated w aste shall be in compliance with all applicable rules and regulations.

12. If mold, suspected ACM or peeling, flaking or chalking paint is observed in the work area, the cleaning contractor shall immediately con tact the Monitoring Contractor.

()

CITY_2IMCl00_000438983 NYC-WTC_000362936

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000362936Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →