Night shift daily work force report, World Trade Center, Dec

Machine-extracted title · confidence 28%

Night shift daily workforce and equipment at World Trade Center site, Dec 6, 2001.

NYC-WTC_000361547
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

GRACE CONTRACT NG CORP. DATE; DECEMBER 6. 2001 (NIGHT FINAL)

W"“.. DAILY WORK FORCE REPORT i

Job Name & Location; World Trade Center Contract No. Weather Conditions

I Labor _________ Equipment CLASSIFICATION QUANT. DescriptlorV- MANNED STANDBY IDLE SUPERINTENDENT 2 CAT 966 LOADER 1 PROJECT ENGINEER 1 CAT 446 BACKHOE 1 OFFICE ENGINEER 1 CAT 873 LOADER 1 FOREMEN 1 CAT 365 GRAPPLER 1 SAFETY OFFICER CAT 375 GRAPPLER 1 LABORERS .20 HITACHI 750 GRAPPLER 1 IRON WORKERS HITACHI 550 GRAPPLER 1 LOCAL 14 5 HITACHI 550 GRAPPLER 1 LOCAL 15 8 HITACHI 1200 GRAPPLER 1 CARPENTER 185 CFM COMPRESSOR 1 CARPENTER FOREMAN 235 HAMMER HOE RAM 1 TEAMSTERS 10 MECHANICS TRUCK 1 1 t [[tool TRUCK 1 MECHANICS HOUSE WRECKERS 7 TOOL VAN ROLLOFF DUMP TRAILERS 7 LOW BED TRAILER HIGH DECK TRAILERS 2 WELDING TRUCK FUEL TRUCK 1 PICKUP TRUCKS 2 LIGHT TOWERS 13 SITE MULE 3 DUMP TRUCKS 10 WHEEL DUMP TRUCK FLASHING ARROW BOARD 1 OFFICE TRAILER/GENER. 1 CARGO BOXES 3 FLAT TRUCK 1 PUMP 2 ROLLER ■ RAINMAKER/GENIE LIFT 1

Description of Work: LOADS OUT; 26 DUMP TRAILERS/HIGH BEDS; 33 EUCLIDS LOAD OUT STEEL AND DEBRIS MAN TARPING AND TRIMMING STATIONS —— MAN WATER STATIONS FOR DUST CONTROL ; CONTINUE REMOVING DEBRIS FROM LOWER LEVELS OF NW CORNER OF TOWER 2 TO MEET AMEC'S ROADWAy' CONTINUE BURNING OF THE NORTH WALL COLUMNS ELEVATIONS; ALL MACHINES LEVEL B-5 253 DELAYS: TOTAL DELAYS OF MACHINES IN HOLE APPROXIMATELY 1 HR FOR FDNY,_____________________ ' FREON RECOVERY FROM 7-10:30 PM, NO PUMP TRAILERS LOADED. ' GRACE CONTI^TING CORP Approved By: Title; ~ BY: SUPERINTEND^T

DAILY WORK FORCE REPORT 1206N.xls

MiWM__

CITY_21MC100_002352223

NYC-WTC_000361547

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000361547Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Sample result table, WTC site

NYC-WTC_000429736

Laboratory/field results for WTC concrete dust and crystalline silica, Feb 2002.

Similar indexed content

Compare copies and versions →