NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 1 page

Daily work force report, World Trade Center, Dec 2001

Machine-extracted title · confidence 45%

Daily workforce and equipment listings for World Trade Center construction site, Dec 2001.

NYC-WTC_000280765
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

GRACE CONTRACTING CORP, i l51-)5 6lhRo3d, Whaeslone. N.Y. l)3S7 (7ie)767-9OW) DATE; SATURDAY DECEMBER 8, 2001 (NIGHT FINAL)

DAILY WORK FORCE REPORT

Job Name & Location; World Trade Center Contract No. Weather Conditions COLD RAIN ALL NIGHT

Labor Equipment CLASSIFICATION quantTI Description MANNED STANDBY IDLE SUPERINTENDENT 1 ] CAT 956 LOADER 1 PROJECTENGINEER 1 CAT 446 BACKHOE 1 OFFICE ENGINEER CAT 973 LOADER 1 FOREMEN 2 CAT 365 GRAPPLER 1 SAFETY OFFICER CAT375GRAPPLER ~ 1 LABORERS 21 HITACHI 750 GRAPPLER 1 IRON WORKERS HITACHI 550 GRAPPLER 1 LOCAL 14 4 HITACHI 550 GRAPPLER 1 LOCAL 15 8 [ HITACH11200 GRAPPLE^ 1 CARPENTER H85 CFM COMPRESSOR 1 ^CARPENTER FOREMAN 235 HAMMER HOE RAM 1 Hteamsters 11 MECHANICS TRUCK 1 1 MECHANICS TOOL TRUCK HOUSE WRECKERS 6 TOOL VAN ROLL OFF lEXCAVATED SOUTH TOWER DEBRIS TOWARDS WEST pUMP TRAILERS 8 .OADED TULLYS EUKES I Plow bed trailer ~ HOERAMMED CONCRETE ON REMAINS OF NORTH WALL HHIGH PECK TRAILERS 2 1200 DOWN WHEN SHIFT STARTED - REPAIRED THEN IjwELOING TRUCK grapple BROKE - REPLACED WITH 750 FUEL TRUCK 1 RECEIVED NEW GRAPPLE FOR 1200 TONITE PICKUP TRUCKS 1 235 DAMAGED - FUEL TANK LEAKING ANO HYDRAULIC LIGHT TOWERS 13 LEAK FROM UNDERCARRAGE SITE MULE 3 DUMP TRUCKS 10 WHEEL DUMP TRUCK FLASHING ARROW BOARD 1 OFFICE TRAILEFUGENER. 1 BCARGO BOXES 3 Iflat truck Ipump 2 feoLLER ~ 1RAINMAKER/GENIE LIFT 1

Description of Work; • ; LOADS OUT: 64 LOADED 43 EUKES . ~ LOADOUTSTEEL AND DEBRIS , ~ MANNED TARPING AND TRIMMING STATIONS ~ MANNED WATER STATIONS FOR DUST CONTROL - - . —--------------------------------------- MAINTAIN TRAFFIC FLOW IN AND OUT OF AREA ' “ CONTINUE REMOVING DEBRIS FROM LOWER LEVELS OF NW CORNER OF TOWER 2T6'MEEt AMEC’S ROADWAY CONTINUE BURNING OF THE SW CORNER COLUMN BEAMS ---------------------------------------------- ELEVATIONS; ALL MACHINES LEVEL B-5 253 ————— _____________ DELAYSi I “ ' ■ --------------------------------------------------- —--------- ------------------- GRACE CONTRACTING CORP Approved By; Title; For; 2 2X1 SUPERINTENDEMT

DAILY WORK FORCE REPORT1208N.xls

CITY_21MC100_003918630

NYC-WTC_000280765

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000280765Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →