;'sv GRACE CONTRACTING CORP. 151-45 6lh Road, Whilestone. N.Y. 11357-(718) 767-8000 DATE: MONDAY. NOVEMBER 26, 2001 DAY (FINAL)
DAILY WORK FORCE REPORT
Job Name & Location: World Trade Center Contract No. Weather Conditions RAIN EARLY THEN MILO • DARK
Labor CLASSIFICATION —-4 _____________ Equipment UANTIT If Description MANNED STANDBY IDLE SUPERINTENDENT 2 CAT 966 LOADER 1 PROJECT ENGINEER i IfCAT 446 BACKHOE 1 OFFICE ENGINEER CAT 973 LOADER 1 FOREMEN 1 CAT 365 GRAPPLER - SAFETY OFFICER 1 CAT 375 GRAPPLER 1 LABORERS 20 HITACHI 750 GRAPPLER ~ 1 IRON WORKERS 1 HITACHI 550 GRAPPLER ~ 1 LOCAL 14 4 HITACHI 550 GRAPPLER 1 LOCAL 15 9 HITACHI 1200 GRAPPLER 1 CARPENTER 185 CFM COMPRESSOR 1 CARPENTER FOREMAN 2 MECHANICS TRUCK 2 TEAMSTERS 11 TOOL TRUCK 1 MECHANICS 2 TOOL VAN 1 HOUSE WRECKERS 4 ROLL OFF DUMP TRAILERS 8 LOW BED TRAILER HIGH DECK TRAILERS 2 WELDING TRUCK 1 FUEL TRUCK 1 PICKUP TRUCKS 5 LIGHT TOWERS 8 PARTS TRUCK 1 DUMP TRUCKS 10 WHEEL DUMP TRUCK FLASHING ARROW BOARD 1 OFFICE TRAILER 1 CARGO BOXES 3 FLAT TRUCK 1 PUMP 2 85' FOOT GENIE 1 ANGEL AERIAL(DUST SUPR 1 GENERATOR 60KW 1
Description of Work: LOADS OUT: 140_________________________________ ____________ EXCAVATING ALONG WEST SLURRY WALL SOUTH OF OUR ACCESS ROAD_________________________ CONTINUED BUIDING RAMP FROM NORTHWEST APPROACH MANNED TARPING AND TRIMMING STATIONS MANNED WATER STATIONS FOR DUST CONTROL____________________________________________ MAINTAIN TRAFFIC FLOW IN AND OUT OF AREA CONTINUE REMOVING DEBRIS FROM LOWER LEVELS OF TOWER 2________________________________ DELjAYS: 1 HR (12;00-1;00) WHILE CREW WENT UNDERGROUND TO INVESTIGATE AREA 3 HOURS WITH GATEWAY 550 & GRACE 750 AT N/E CORNER OF TOWER 2 CORE WHILE SEARCH AND RECOVERY FOR FIREFIGHTERS WAS CONDUCTED
GRACE CONTRACTING CORP Approved By: Title; BY: For SUPERINTENDENT
CITY_21MC100_003735907
NYC-WTC_000360985
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
NYC-WTC_000388478
Final daily workforce report for World Trade site, Grace Contracting, Nov 26, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.981
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000388692
Day final daily workforce with machine descriptions for World Trade project.
2 shared non-person entities · 1 shared topics · similarity 0.977
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000278572
Night daily workforce and equipment at World Trade Center site, Nov 11, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.976
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305045
Daily workforce and equipment report for World Trade Center site, November 2001.
1 shared non-person entities · 1 shared topics · similarity 0.975
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000322814
Final daily workforce and equipment at World Trade site, Nov 11, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.975
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000267227
Night preliminary daily workforce and equipment for World Trade Center, Dec 13, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.975
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000388248
Day/FINAL daily workforce and equipment at World Trade site, Nov 11, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.975
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000389393
Daily workforce report for World Trade project, listing personnel and equipment.
2 shared non-person entities · 1 shared topics · similarity 0.974
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000280072
Workforce and equipment counts for World Trade Center job, Nov 26, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.974
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305392
Nightly final workforce and equipment listing for World Trade Center project.
2 shared non-person entities · 1 shared topics · similarity 0.974
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000388447
Day final daily workforce report for World Trade site, Dec 13, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.974
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000388394
Night final daily workforce report for World Trade site, listing personnel and equipment.
2 shared non-person entities · 1 shared topics · similarity 0.973
machine-extracted · confidence unavailable · Check page ↗No available related records indexed in this group.
Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
Page similarity is temporarily unavailable or this page has no indexed vector.
Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000388478
Final daily workforce report for World Trade site, Grace Contracting, Nov 26, 2001.
Similar indexed content
NYC-WTC_000388692
Day final daily workforce with machine descriptions for World Trade project.
Similar indexed content
NYC-WTC_000278572
Night daily workforce and equipment at World Trade Center site, Nov 11, 2001.
Similar indexed content
NYC-WTC_000305045
Daily workforce and equipment report for World Trade Center site, November 2001.
Similar indexed content
NYC-WTC_000322814
Final daily workforce and equipment at World Trade site, Nov 11, 2001.
Similar indexed content