NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 92 pages

NIST/CS compliance document for security systems

Machine-extracted title · confidence 25%

Sanitation dept. form referencing NIST guide and security standards for NYC systems.

NYC-WTC_000360278–000360369
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

■ Connecting system to network or other external systems ■ Operating alternate equipment successfully.

Recovery procedures should be written in a straightforward, step-by-step style. To prevent difficulty or confusion in an emergency, no procedural steps should be assumed or omitted. A checklist format is useful for documenting the sequential recovery procedures. It also is useful for troubleshooting problems if the system cannot be recovered properly. The example below provides a subset of a procedural checklist for a LAN Recovery Team.

Recovery Process for the LAN Recovery Team: These procedures are used for recovering a file from backup tapes. The LAN Recovery Team is responsible for reloading all critical files necessary to continue production. • Identify file and date from which file is to be recovered Time:_:_ • Identify tape number using tape log book Time:_ :__ • If tape is not in tape library, request tape from recovery facility; fill out request with appropriate authorizing signature Time:_ • When tape is received, log date and time Time:_ • Place tape into drive and begin recovery process Time:_ • When file is recovered, notify LAN Recovery Team Leader Time:_

4.4 Reconstitution Phase

In the Reconstitution Phase, recovery activities are terminated and normal operations are transferred back to the organization’s facility. During the Recovery Phase, as the contingency activities are performed, reconstitution of the original site should be under way. If the original facility is unrecoverable, the activities in this phase can also be applied to preparing a new facility to support system processing requirements. Once the original or new site is restored to the level that it can support the IT system and its normal processes, the system may be transitioned back to the original or to the new site. Until the primary system is restored and tested, the contingency system should continue to be operated. The Reconstitution Phase should specify teams responsible for restoring or replacing both the site and the IT system. The following major activities occur in this phase: ■ Ensuring adequate infrastructure support, such as electric power, water, telecommunications, security, environmental controls, office equipment, and supplies ■ Installing system hardware, software, and firmware. This activity should include detailed restoration procedures similar to those followed in the Recovery Phase ■ Establishing connectivity and interfaces with network components and external systems ■ Testing system operations to ensure full functionality ■ Backing up operational data on the contingency system and uploading to restored system ■ Shutting down the contingency system

35

NYC-WTC_000360325

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000360325Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

No available related records indexed in this group.

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000279102

Building Department memo/guide related to emergency planning after 9/11.

Similar indexed content

NYC-WTC_000165900 · Box 7DDC

Document page containing contact details for Con Edison and JWC Environmental Health & Safety personnel.

Similar indexed content

Compare copies and versions →