NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 92 pages

NIST/CS compliance document for security systems

Machine-extracted title · confidence 25%

Sanitation dept. form referencing NIST guide and security standards for NYC systems.

NYC-WTC_000360278–000360369
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

4.3.1 Sequence ofRecovery Activities When recovering a complex system, such as a WAN involving multiple independent components, recovery procedures should reflect system priorities identified in the BIA. The sequence of activities should reflect the system’s allowable outage time to avoid significant impacts to related systems and their application. Procedures should be written in a stepwise, sequential format so system components may be restored in a logical manner. For example, if a LAN is being recovered after a disruption, the most critical servers should be recovered before other, less critical devices, such as printers. Similarly, to recover an application server, procedures first should address operating system restoration and verification before the application and its data are recovered. The procedures should also include instructions to coordinate with other teams when certain situations occur, such as— ■ An action is not completed within the expected time frame ■ A key step has been completed ■ Item(s) must be procured ■ Other system-specific concerns.

If conditions require the system to be recovered at an alternate site, certain materials will need to be transferred or procured. These items may include shipment of data backup tapes from offsite storage, hardware, copies of the recovery plan, and software programs. Procedures should designate the appropriate team or team members to coordinate shipment of equipment, data, and vital records. References to applicable appendices, such as equipment lists or vendor contact information, should be made in the plan where necessary. Procedures should clearly describe requirements to package, transport, and purchase materials required to recover the system.

4.3.2 Recovery Procedures To facilitate Recovery Phase operations, the contingency plan should provide detailed procedures to restore the system or system components. Given the extensive variety of system types, configurations, and applications, this planning guide does not provide specific recovery procedures. However, recovery considerations are detailed for each IT system type in Section 5.0.

Procedures should be assigned to the appropriate recovery team and typically address the following actions: ■ Notifying internal and external business partners associated with the system ■ Obtaining necessary office supplies and work space ■ Obtaining and installing necessary hardware components ■ Obtaining and loading backup tapes or media ■ Restoring critical operating system and application software ■ Restoring system data ■ Testing system functionality including security controls

34

NYC-WTC_000360324

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000360324Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

No available related records indexed in this group.

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000279102

Building Department memo/guide related to emergency planning after 9/11.

Similar indexed content

NYC-WTC_000165900 · Box 7DDC

Document page containing contact details for Con Edison and JWC Environmental Health & Safety personnel.

Similar indexed content

Compare copies and versions →