NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 92 pages

NIST/CS compliance document for security systems

Machine-extracted title · confidence 25%

Sanitation dept. form referencing NIST guide and security standards for NYC systems.

NYC-WTC_000360278–000360369
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

to the system has been determined, the appropriate teams should be notified of updated information and planned response to the situation. Notifications should be executed using the procedures described in the Section 4.2.1.

4.2.3 Plan Activation The contingency plan should be activated only when the damage assessment indicates that one or more of the activation criteria for that system are met. If an activation criterion is met, the Contingency Planning Coordinator should activate the plan.^'^ Activation criteria for events are unique for each organization and should be stated in the contingency planning policy statement. Criteria may be based on— ■ Safety of personnel and/or extent of damage to the facility ■ Extent of damage to system (physical, operational, or cost) ■ Criticality of the system to the organization’s mission (e.g., critical infrastructure protection asset) ■ Anticipated duration of disruption.

Once the system damage has been characterized, the Contingency Planning Coordinator may select the appropriate recovery strategy,and the associated recovery teams may be notified. Notification should follow the procedures outlined in Section 4.2. l.^O

4.3 Recovery Phase

Recovery operations begin after the contingency plan has been activated, damage assessment has been completed (if possible), personnel have been notified, and appropriate teams have been mobilized. Recovery phase activities focus on contingency measures to restore temporary IT processing capabilities, whereas activities executed during the Reconstitution Phase in Section 4.4 are directed to repair damage to the original system and restore operational capabilities at the original or new facility. At the completion of the Recovery Phase, the system will be operational and performing the functions designated in the plan. Depending on the recovery strategies defined in the plan, these functions could include temporary manual processing, recovery and operation on an alternate system, or relocation and recovery at an alternate site. Teams with recovery responsibilities should understand and be able to perform these recovery strategies well enough that if the paper plan is unavailable during an event, they can still perform the necessary activities.

For this document, the IT Contingency Planning Coordinator is assumed to have the authority to implement the contingency plan. That authority may vary based on the organization or system; however, the individual(s) with this authority should be designated clearly in the plan. 19* For example, if the incident is expected to cause only a short-term disruption and physical damage is limited to a particular hardware device, the Contingency Planning Coordinator may choose to recover the system onsite, using another device. However, if the damage assessment reveals extensive damage to the facility, the Contingency Planning Coordinator may need to relocate the system and recovery teams to an alternate site for an extended period. 20* If the event requires IT operations to be relocated temporarily to an alternate site, travel arrangements should be made for recovery team members. Travel information such as preferred travel agency, hotels, and car rental companies may be included as a contingency plan appendix.

33

NYC-WTC_000360323

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000360323Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

No available related records indexed in this group.

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000279102

Building Department memo/guide related to emergency planning after 9/11.

Similar indexed content

NYC-WTC_000165900 · Box 7DDC

Document page containing contact details for Con Edison and JWC Environmental Health & Safety personnel.

Similar indexed content

Compare copies and versions →