NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 92 pages

NIST/CS compliance document for security systems

Machine-extracted title · confidence 25%

Sanitation dept. form referencing NIST guide and security standards for NYC systems.

NYC-WTC_000360278–000360369
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

(CIO), who has the authority to make decisions regarding spending levels, acceptable risk, and interagency coordination.

3.4.5 Cost Considerations The Contingency Planning Coordinator should ensure that the strategy chosen can be implemented effectively with available personnel and financial resources. The cost of each type of alternate site, equipment replacement, and storage option under consideration should be weighed against budget limitations.^-^ The coordinator should determine known contingency planning expenses, such as alternate site contract fees, and those that are less obvious, such as the cost of implementing an agency-wide contingency awareness programs and contractor support. The budget must be sufficient to encompass software, hardware, travel and shipping, testing, plan training programs, awareness programs, labor hours, other contracted services, and any other applicable resources (e.g., desks, telephones, fax machines, pens, and paper). The agency should perform a cost-benefit analysis to identify the optimum recovery strategy. Table 3-2 provides a template for evaluating cost considerations.

Vendor Hardware Software Travel/ Labor/ Testing Supply Costs Costs Costs Shipping Contractor Costs Costs Costs Costs

Alternate Site

Offsite Internal "SLAs Equipment Storage Replacemen Existing Use

Table 3-2. Recovery Strategy Budget Planning Template

3.5 Plan Testing, Training, and Exercises

Plan testing is a critical element of a viable contingency capability. Testing enables plan deficiencies to be identified and addressed. Testing also helps evaluate the ability of recovery staff to implement the plan quickly and effectively. Each element of the contingency plan should be tested to confirm the accuracy of individual recovery procedures and the overall effectiveness of the plan. The following areas that should be addressed in a contingency test: ■ System recovery on an alternate platform from backup tapes ■ Coordination among recovery teams ■ Internal and external connectivity

If possible, the costs and benefits of technical recovery methods should be evaluated during system development.

24

NYC-WTC_000360314

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000360314Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

No available related records indexed in this group.

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000279102

Building Department memo/guide related to emergency planning after 9/11.

Similar indexed content

NYC-WTC_000165900 · Box 7DDC

Document page containing contact details for Con Edison and JWC Environmental Health & Safety personnel.

Similar indexed content

Compare copies and versions →