NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 1 page

Invoice: 90 Trinity Place, 2003

Machine-extracted title · confidence 42%

BOE invoiced amounts for 90/100 Trinity Place panels analyses and air monitoring services.

NYC-WTC_000359590
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Or. e. 9 NEW YORK CITY BOARD OF EDUCATION 90 /100 TRINITY PLACE INVOICES

as of January 9, 2003

___ ~ I Contractor Scope FEMA PW

Submitted to Date Albert Kunq S 9,616.00 90 panels analysis NYU-003 $ 9,616.00 Albert Kunq _2 $ 8,923.20 90 panels and bridging analysis _________.NYU-0Q3________ 8,923.20 Athenica < 118 s 7,472.00 _________ 1QQ QC air monitoring NYU-004 7,472.00 Athenica f 119 3,644.00 90 QC air monitoring _________ NYU-0Q4 NYU-002-$26,965.28 3,844.00

(secondary filters) ineligible- AWL Industries, Inc. 16 $ 111,553.23 10Q HVAC rehab Cat. "E- 85,597.95 NYU-0O2-S9.234.70 (secondary f)(£ers) (neJigib/e- AWL Industries, Inc. 17 $ 95,929.86 90 HVAC rehab Cat. "E" $ 86,695.16 Board of Education Custodian PO-1 $ 253,291.72 90/100 custodial labor/cleaning NYU-002 $ 253,291.72 NY U-002-S5,312.26 ineligible in proportion to Burns and Roe 2,3,4, 5,6 $ 31,243.56 90 and 100 Trinity HVAC engineering ineligible AWL work (17%) 25,936.30 Burns and Roe 7,8 $ 6,749.89 ___________ 60 and 100 Trinity HVAC engineering ineligible-not 9/11 related $ Burns and Roe 9 1,882.50 90 and 100 Trinity HVAC engineering invoiced post-FEMA Corinthian — 1149 49,000.00 100 air shaft return cleaning/reinsulation NYU-002 $ 49,000.00 Corinthian 1150$ 2,867.23 100 secondary cleaning lower aud. roof NYU-001 2,867.23 Doriel Scaffolding z^ 107$ 4,500.00 90 plywood wall to close sidewalk for probes NYU-D03 S 4,500.00 DSF(work order)_________ _ 00024866-03 $ 114.53 100 control valves hot water system ineligible-Cat. "E” S DSF (work order) 00024866-04 $ 509.63 100 chill water valve ineligible-Cat. "E" $ D5F (work order) 00052472-01 $ 1,719.21 100 public address system ineligible-Cat. "E" DSF (work order) 73613 $ 2,112.35 100 plumbing in 121h floor bathroom ineligible-Cat. "E" $ DSF (work order) 00090363-01 $ 7,000.00 90/100 plumbinq repairs ineligible -Cat. "E" $ DSF (work order)___________ 00092514-08 $ 3,291.53 _________ 90/100 glass in walkway ineligible-Cat. "E" DSF (work order) 00093067-01 s 1,886.00 100 locks NYU-0Q3 1,886.00 DSF (work order)___________ 00093074-01 s 18,144.32 100 locks, doors, door checks ineligible-Cat. "E" DSF (work order) 00093195-01 $ 4,932.29 100 door glass / metal sash windows ineligible-Cat. "E" $ DSF (work order)___________ 00093200-01 $ 1,690.19 90 glass main entrance doors ineligible-Cat. "E" $ DSF (work order)___________ 00093200-03 $ 1,571.01 90 doors, wood floor in gymnasium ineligible-Cat. "E“ $ DSF (work order) z^ 00093200-04 s 4,619.47 90 fire hatch at stairway NYU-003 $ 4,619.47 DSF (work order)___________ QQQ93322-01 s 518.83 _________________________ 90 interior glazing ineligible-Cat. "E" s DSF (work order) 00093322-02 s 1,432.21 90 door checks replacement ineligible-Cat. "E" _s_ DSF (work order) z^ 00093322-03 $ 12.24 _________ 90 repair locks NYU-003 s 12.24 DSF (work order for Simplex) 00101279-01 $ 25,647.90 100 repair fire alarm system tne(fgib(e-Cal. "E" $ Kiss Construction 19 $ 514,561.23 90 interior cleaning NYU-D04 $ 514,561.23 Kiss Construction 29 $ 1,084,328.82 100 inlerior cleaning .NYU-D04 $ 1,084,328.82 100 8/31/02 - 9/2/02 carpet test tent procedures Kiss Construction €5 $ 2,125.79 aud. & 9th floor invoiced post-FEMA 90 8/31/02 - 9/2/02 carpet test tent procedures Kiss Construction S9 S 3,533.85 3rd fir. Art, 7th fir. Principal, and 13th fir. invoiced post-FEMA 100 3/23/02 & 4/13/02 filter inspections 9th & invoices rec'd by DSF Kiss Construction 42 784.62 10th firs. post-FEMA 90 1/31/02 8.2/2S/02 2nd & 8th firs., gym., & invoices rec'd by DSF Kiss Construction 31 J 39.392.35 aud. cleaning post-FEMA KW Tech z^ 03-1 DO W1 s 32,610.00 1 DO ductwork insulation replacement NYU-0Q2 $ 32,610.00 KW Tech 03-1001/#2 $ 5,078.00 100 additional ductwork insulation ineligible-maintenance $ L. Naro 0D17J-00 $ 18,187.41 ■ __________ 90 glass in lobby ineligible-Cat. "E‘‘ s National Environmental Safety*^ 3704-2001-#1 $ 198,691.00 90 exterior cleaning NYU-001 198,691.00 National Environmental Safety 3705-2001-#! s 204,800.00 100 exterior cleaning NYU-0Q1 204,800.00 National Environmental Safety-** 3705-2001-#2 s 51,200.00 100 exterior cleaning NYU-001 $ 51,200.00 National Environmental Safety** 3704/5-2001-#1 $ 28,175.00 90/100 sidewalk bridging NYU-OOI $ 28,175.00 National Environmental Safety-*’ 3704/5-2001-#2 10,225.00 : ,, i 90/1.00 sidewalk,bridging NYU-001 $ 10,225.00 National Environmental Safety ** 3704/5-2001-#1R 3 1,481.22 : 90/100 sidewalk bridging ia-day rental NYU-001 $ 1,431.22 Safwav Steel Products D0055356 $ 82,252.50 90 sidewalk bridge (for panels) (75% billed) NVU-003 S 82,252.50

R00573391, 0056949. 00S78S1, invoices rec'd by DSF Safeway Steel Products 0058333 19,485.00 rental for 90 sidewalk bridging 6/02 - 9/02 post-FEMA invoices rec'd by DSF Safebvay Steel Products not invoiced yet 19,485.00 rental for 90 sidewalk bridging 10/02 -1/03 post-FEMA Stanco Electric z- 2041 $ 1,031.68 ____________________________90 bridge lighting _________ NYU-003_________ S 1,031.58 Stanco Electric z- 2049 $ 717.16 100 restore functioning of exhaust fans 9th floor ineligible-Cat. "E" S Stanco Electric 2060 $ 1,116.40 100 restore functioning of fan shutdown relays ineligible-Cat. "E" S Stanco Electric 2073 S 632.45 ____________ ______________ 100 bridge lighting NYU-003_________ s 632.45 Stanco Electric y*-* 2074 $ 903.96 100 bridge Itg. trouble-shoot breaker & remedy NYU-003 s 903.96 Stanco Electric 2089 $ 596.52 ___________________________ 90 bridge lighting NYU-003 s 596.52 Started Electric 2099 s 847.82 _________________________ 100 bridge lighting _________ NY11-QQ3_________ s 647.82 Stanco Electric 2128 $ 608.18 90 bridge lighting NYU-003 608.18 Stanco Electric z-- 2137 $ 471.02 100 bridge lighting emergency response NYU-003 $ 471.02 Tavlor Environmental /- 129 s 30,928.00 ___________ __________________90 air sampling _________ NYU-004_________ $ 30,928.00 Taylor Environmental 132 s 32,465.00 100 air sampling _________ NYU-0Q4_________ $ 32,465.00 Taylor Environmental - 139 s 43,873.00 100 air sampling _________ $ NYU-QQ4 43,873.00 Taylor Environmental not Invoiced yet 90 monitoring for carpet testing not Invoiced yet Taylor Environmental not invoiced yet 100 monitoring for carpet testing not invoiced yet NYU-001,-002, -0D3- S696.37 ineligible (fee only) 149, 167, 176, 182 due to $17,411.62 ineligible TDX 199, 207,226,257 $ 153,225.54 9Q/10D CM services (fee and siaffinq subcontractor costs $ 152,529.17 invoices rec'dby DSF TDX 245 (1,300.00) fee revision due to revised V&R invoice #56 _______ post-FEMA fee for subcontracted 90 sidewalk bridge rental invoices rec'd by DSF TDX 249, 262, 271, 286 J 779.40 ________________________________ 6/02 • 9/02 post-FEMA not invoiced or fee for subcontracted 90 sidewalk bridge rental not invoiced or rec'd by TDX rec'dbyDSFyet 779.40 _______________________________ 10/02 • 1/03 ___________________ DSFyet Trio Asbestos 22 S 666,946,07 100 interior clean-up NYU-QQ4 666,946.07 Trio Asbestos 31 (7,469.59) _____________________adjustment to invoice #22 Urbarr D.C. Inc. 6681 225,225,75 90 panels repair (21 panels) MYU-QQ3 $ 225,225.75 V&R Mechanical $ 420,000,00 ________________________ 100 HVAC duct cleaning NYU-QQ2 420,000.00 V&R Mechanical B (change order) s 1,500,00 _^^___^_^00_d3na£ed_ducL\en\££6£_flc££ NYU-Q02 1,500.00 V&R Mechanical 16 (change order) $ 966,00 1 DO fresh air intake grille coverings/filters NYU-002 966,00 V&R Mechanical 19 (change order) s 5,049,00 100 clean mixing boxes after new dampers NYU-002 5,049.00 VSR Mechanical 20 (change order) s 1,530,00 10Q clean mixing boxes (plenums) NYU-002 1,530.00 100 reclean floors 3,5,7,9,10, basement; inspect VSR Mechanical 56 (change order) $ 205,710.00 HVAC entire building; etc NYU-002 $ 205,710.00 invoices rec'dby DSF IZiSR Mechanical 56 (revised) (32,500.00) revision to invoice Use post-FEMA VSR Mechanical 11561 398,000.00 90 HVAC duct cleaning NYU-Q02 $ 398,000.00 NYU-002-Sf 0,500 (metal V&R Mechanical 1 (chanqe orders) $ 16,250.00 90 clean mech, roomreplace metal flex nex) ineligible-Cat. "E" 5,750.00 Warren & Panzer Engineering 136 $ 3,950.00 asbestos monitoring @ 90 Trinity NVU-004 $ 3,95Q.D0

GRAND TOTAL $ 5,151,309.40 FEMA-reimbursed = $ 4,952,099.56

$5,151,309.40 ■ $4,952,099.56 = $199,209.84 Changes from 9/13/02 version: 40,528.80 =hrldging+TDXfee $ 47,719.11 “Other increases $ (41,269.59) “decreases 46,978.32 =net increase, plus 2 Taylor Env. invoices to be received

CITY_2 IMCl 0 C_0 C 1 7 3 5 Cl 3 7

NYC-WTC_000359590

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000359590Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000340190

DOE invoices for panels and air monitoring analyses, Trinity/NYU records.

Similar indexed content

Invoice summary, 90 Trinity Place

NYC-WTC_000359591

Invoicing from multiple vendors for 90 Trinity CCTV, panel analyses, and air monitoring services.

Similar indexed content

Compare copies and versions →