NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 1 page

FEMA PWD disclosure notice, 2002

Machine-extracted title · confidence 34%

PAPERWORK BURDEN DISCLOSURE for FEMA project worksheet.

NYC-WTC_000359487
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

lO 5- ol

FEDERAL EMERGENCY MANAGEMENT AGENCY O.M.B. No. 3067-0151 PROJECT WORKSHEET Expires April 30, 2001

PAPERWORK BURDE N DISCLOSURE NOTICE huWiC reporting burden tor Ihi s form is estimated to average 30 m inutes. The burden es timate includes the time for reviewing Itturucllons. aearching existing data sources, gathering and maintaining the needed data, and c ompleting and submitting the forms. You ate r>oi required to respond to this collection of information unless a valid 0MB control number is displayed in the upper right comer cl the lurmt. Send comments regarding the accuracy of the burden estimate and any suggestions for reducing the burden to; Ifilorrtialion Collection Management, Federal Emergency Management Agency, 500 C Street, SW. Washington, DC 20472, Paperwcfk Reduction Project (3067-0151). NOTE: Do not send your completed forrri to this address.________ ___________________ Ul CL A RAI ION NO: PROJECT NO. FIPS NO. DATE I CATEGORY kfUA. Itoi .OR. NY 061-51000-22 02/27/02 DAMAGE FACILITY WORK COMPLETE AS OF; Public School 234 School Clean Up 10/31/01 ; 100 % APPLICANT COUNTY New York Clly. Board of Education__________ New York lOCAT ION LATITUDE LONGITUDE 282 Greenwich Slreel, New York, NY 10262 DAMAGE DESCRIPTION AND DIMENSIONS

Tire collapse of the World Trade Center (WTC) on September 11, 2001 caused a massive cloud of concrete and dust to impact neighboring buildings blocks away from the World Trade Center complex. Public School. 234 (PS 234) is located at 292 Greenwich Slreel, spptox imately two-tenths of a mile from One WTC. The dust cloud from the collapse of One WTC directly impacted the PS 234 lacilily and covered the bui Iding with a layer of dust. Dust and debris entered the bui Iding through the ventilation system and through open windows and coors. In addition, PS 234 was also used as a relief center to provide equipment, food, shelter, showers, change of clothes, and supplies for the emergency rescue and recovery workers. Work to clean PS 234 was performed from September 25, 2001 till October 31, 2001.

SCOPE OF WORK

Work complete consists of the expenses incurred by the New York City, Board of Education (BoE)forthe work performed by the Scttoel Construdion Authority (SCA). SCA will be submitting all costs to the BoE for reimbursement. These costs include the contractual work lor remediation and restoration of PS 234 on the bas is of design, capacity and function of the facility prior to the dikaalar and In conformity with applicable standards.

School Construction Authority was responsible for the coordination and construction management of the contractors performing work al PS 234 related to the collapse of WTC. Costs associated with the work performed by SCA consists of regular time labor (I3,ei9.24), Including the New Y erk City regular time fringe benefit rate tor non-uniform employees of 44.66% ($1,616.36). Total incurred cost for regular time labor is $5,235.60, Costs associated with the overtime for labor for SCA (10,007.66), InciudInB the New York City overlime fringe benefit rate for non-uniform employees of 10.73% ($1,073.83). Total incurred cost lot overtime labor is $11,081.49.

PAL Environmental Safety Corp. (PAL) and KISS Construction performed clean up and remediation operations of the interior of the buiiorrig, *s well as pressure washing the exterior. Citywide Environmental Services LLC cleaned the HVAC system of dust and Oebht. Corinthian Construction Cc, Inc. was responsible of clearing debris from the roof of the school. Gravel was removed from the roof, Ih* root membrane was pressure washed, and new gravel was placed on the roof. Taylor Environmental Group, Inc. conducted Ouatlly control ait monitoring and analytical services, as well as visual inspections to determine the presence of fine particulate dust. W»ti»n & Panzer Engineers (Warren & Panzer) conducted aggressive sampling and transmission electron microscopy (TEM) analysis of wveral floors and the HVAC unit. TDX/Becom performed construction oversight of all contractual activities to insure quality of work. Total contractual costs submitted tc BoE from SCA for this project worksheet is $1,252,981.39.

Sm Nstijilive lor detailed description of the work performed by SCA and each contractor, as well as their respective costs.

ToUil costs associated with this project worksheet for contractual work and labor is 51,268,298.48.

Ooet the Scope of Work change the pre-di caster condition at site? I I Yes [Xi No Special Consideration issues included? H Ves □ No Hazard Mitigation proposal included? Yes [Y] No It there insurance coverage on facility? | I Yes [Y] No PROJECT COST__________ ■ iTew CODE NARRATIVE QUANTITY/UNIT UNIT PRICE COST 1 9003 Contract - School Construction Authority 2 2___ LS $1,262,981.39 $ 1,252,981.39 2 9007 Labor ■ Regular Time w/ fringe________ 1 2__ $ 5,235.60 $_______ 5,235.60 3 9007 Labor - Overtime w/fringe 1 I LS $11,081.49 $11,081.49

Total 5 i.269.29fc.4fc PREPARED BY: Dan Marlin REMARKS: Project Officer FEMA Form 90-91, SEP 98

CITY_21MC100_005170046

NYC-WTC_000359487

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000359487Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

FEMA Project Worksheet · page 1

NYC-WTC_000251589

FEMA project worksheet and paperwork burden disclosure for disaster-related work.

Similarity score 0.985 (not a probability)

machine-extracted · confidence unavailable · Check page ↗

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

FEMA project worksheet, 2001

NYC-WTC_000385737

FEMA 1391-DR-NY worksheet; declaration, project, and narrative overview.

Similar indexed content

NYC-WTC_000243503

FEMA project worksheet related to disaster 1391 and 2001-2002 funding paperwork.

Similar indexed content

NYC-WTC_000219967

Federal Emergency Management Agency paperwork worksheet declaring project details and burden disclosure for disaster relief efforts dated September 30, 2001.

Similar indexed content

Compare copies and versions →