NYC-WTC_000359488
FEMA project worksheet narrative on WTC construction materials.
6 shared non-person entities · similarity 0.917
machine-extracted · confidence unavailable · Check page ↗Board of Education invoicing records for services at Downtown schools.
NYC-WTC_000359483OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
NEW YORK CITY BOARD OF EDUCATION DOWNTOWN SCHOOLS INVOICES (excluding 90/100 Trinity) (•= TDX subcontractor) 1^uM9
?x InwiceL Contractor Billinq l£. Contract Date DSF Amount S FEMA PW DATE (these columns not updated)
i 31100534 0/13.'01 13.168 88 Dtirchase coverall suils and respiralors ATC Associates (mnludiiq 90/100) various 5,297,686.55 air lestinn through 9/02
ATC AagQoiates (including tO/lOO) _____________________ airtesiino 1002 AWL Industries, Inc.______________ 5/3,■•02 232,71586 KVAC rehafcilitalion al Stuwesant H.S
a,WL Indi ;s. Inc. 11 4/9/02 145,596.90 23i HVAC rehabililafior at PS234 AWL Industries, Ine. 4/5,'02 93,589.55 HVAC rehaciiHation al PG/i5ay WL Industries, Ino 5/3/02 7,61829 PE1S HVAC rchabililoHon al PS15Q
air oJ-tiirc units: 58 for PS/IS89; 45 for PS234, and Bteair, ire,_________________ 7(1/02 23,9415a PSftSBB. PS 224. 26-4 [email protected]
Burns S Roe________________ (»2-ff9 2(02 - 10 '02 HVAC i □I PS23a Burns 4 Roe________________ >>2-09 2/02 - 10/02 52,1398.55 HVAC ahalysis/design al Stuwesant Burns 8 Roe________________ 22,722 21 89 _________ HVAC analysis/deslgn al PS.'IS8S Burns & Roe________________ Business Relocation Sevices -giS- 7,574.07 ___________ HVAC anatysis'desigr al PS150 movo-out of Stuwesant Io BRS-warehojse Gtuy.'ftsar.t supplies to BRS warehous
1 16167 SSS.69 Business Relocation Sevices Business Relocation Se-viees 16184 16133 4,960.25 925 00 various movePSa to PSI5 move inate'iel Irom PS22 Io PSat mnve from St. Bernard's back to PS234 1/02 it Business Relocation Seviees 32,354 18 luaineag Pc tian So vinoa i;20.'02 2,932 03 PS? 1/n; business Relocalion Services 16610 12,421 74 3? move 1SB9 back from P322 S181 (missing) 5,867,27 various move PS7010 P38S Dfiu-cn ol SI. Bernard 3079106 35,666.68 939 Ohu-eh of SI. Bernard F\'9201467 40,000 00 969 1'1'02 - 1/31'02 lease lor PS234s:udents -ireCommand Co., Inc. 20 fire exlinguishers al Sluyvesan 3.5 VIcEurney YMCA________ 13,90000 N Thomas utilize YMCA athletic facilt les for N. Tiomas M5C Industrial Direct Co. -i 10/5/01 2,149.60 ___________________________ 15 HEPA air purifiers 12 pluiroi Ti tucks al Sluvvesori Vise Industrial Direct Co (mi.ss.ng) 4,355 39 13 tilt trucks al Sluwesan Dotagor Painting 6 10/25'01 573.00 234 flaapple repair al PS234 4/10- 5'3 WTC-relaled sampling data on tP orecision Ervironmenta Inc 5.'20/02 44,960.00 spreadstiee Roma Elevator C O. L-002 12'10/01 9,009.13 4// ___________________ elevator repairs al Sluwesan may Ds aiigiCie JFI Dust Control S-ystem 3LJ-S4893 various 28,B'12»O 477 _________floor mats al Stuwesant, 10/16/01-6/02 ,Jniled Insignia_____________ 3U-QC037 szi3,'ai 1.125.00 bacgea'waile.lstnr BnP pe.rsanne.t dminQ dearvup WW Grainger 3U-0O602 a'17/01 2.200 OO purchase 4 portable generators for use al schools 3U-DCO3a 9/20/01 various purchase 4 sewage pumps for use al schools $$ 'WW Grainger 1,117 52 Warnock Motors 3l/-DCeiO 11/21/01 25,689.60 lions replacement vehicle for destroyed Bd. Ed. Vehicle Wear-Guard Work Clothes 3LJ-0C643 10/22/01 1,447 25 various jackelB for BoE persorir.el during clean-up
Kork Hunter 10/16/01 10,466 90 structural rspectiohs of downtown schools Air Tech Lab, Ino. 2/19.(02 446,999.74 PS/IS6S floors 1 - 6 nteror cleaning ol PS/lsaa 4.15 ,\TC Aeeoei.itnn 22 12'27/01 16.142 OO WTC ciriiplo 9/13 - 9/21 asbestos -nersonai mcnltorlng of workens ATC Associates ?fi i;?B.(n7 59.667 00 9/26;01 10."1/01 alrmonilorinc ATC Assoelales 76 Z2e!02 25,363 00 11/29(01 -2/26/02 air monilorina Alhepica 4/3/':e 29,937 00 WTC comniex 9,'13 ■ 10/4 asoestos persona' mcnitoring of workers miissmg) 32,687 00 = fWOica S77 lur S2Q.9377 8/0/02 - 0/14/02 final lepait on aabBsluK peisuiiu Alhepica 106 1C/21/02 3,36000 WTC nnmplev mnnilorinq of worker Citvwide Environmental Svees.' Citvwide Environmental Svoes.' Consolidr^ted riooring’ 2164-RE'V 2167 s- 10.'23/O1 11/14/01 10/1502 376.180.14 6.441.67 10,155.56 234 234 477 ___________________________________ HVAC clearing ceiling tile vioni
_______________ 600 sq. yes, carpeting tor auditorium ________ peymani auditing of Trio <ksbestos and A.T( Corinthian Conslruolion' 1134 207/8240 1/3/02 153,703.00 234 roof cleaning of P323- Corinthian Consiruclion' 1101DSTU'r 149/8240 10/10/01 214.420.00 477 exlarior ant! window claaniro Corintbla.n Oonstrucllor' 1132 207/8240 1/3/02 231.500.00 n&'issg exterior cleaning, rcluding courtvarr Ki,3S0 repairs Corinthian Cons'ruolion' 1133 2C7/8240 1/3/0? 72.500.00 PS/IS80 rrof ccaring and repairs at rS/]S8 inclipibln DAG Floors' 02033C Pt. I 92(8553 6/30/02 10,000.00 477 dBr«n«it fnr flcrtrlnn mslerlal 8/0' DAG Floors" 020830Pt. II 94(6553 8.'30/02 42,250.00 replacc carpeting in aiidiforium 8/0 2 tmisiiiig) 116/8553 11/13/C2 2,750.00 477 K-SS Conslrccticn 63 9'13/02 1 799,595 50 6'11/32 - 9'2/02 HVAC S Inlerior clQarln; Kiss CenstfLcticn 61 10/2/02 1,144,141.27 477 7'13/02 ■ a"1/o; HVAC8 Interiorcearim Kiss Construction 12 10'30'01 627.853.6f ______ SZ26/01 - 'D/a'OI posl-relfef cearinj KIcsConsi-Lction 10'30/01 156,760.5C 10/4'01 -10/6/0-1 Clean-U| Klee Conn'rpctlon 2/13'02 C/31(O2 • 6/2'02 carpet test lBrilpiuVBiJuies2iid fit Kiss Coristnjclion 66 10/22/02 3,261.96 (library), 4lh Hr (sr- 6,(31/02 - g/2/n? carpel test lent procedures 2nc fir Kiss Corstruclion 67 ■JftRI ■ 3/31/02- 9/2/G2 carpel test lent procedures Principal' Kiss Corstruclion 70 10'22'02 4,300 If
__________ 477 48C square feel of leelun 4,'6/O2 WIG complex 9/12 -10(3 asb. personal monitoring of workers New TorK Environmental 61 1/15/01 (?| rc.'iGa3 asbestos ptoiecl tiimiiLuitlig (TEM) uf PS/lSaS OCS Group' 10041640 93/8553 7/27/D2 ___________________________ secirity 7/20-7/26 OCS Group’ 10341411 63/8553 7/20/D2 5,057 44 saeurlly 7/13-7/1 OCS Group’ 10341860 93/8553 B/3/02 uriiy 8/3 - 8/ 8'17/02 477 lyfyio-e-'ie OCS Group' 10042.529 106/8553 3/24/02 lya/17-a;2; OCS Securil'A 10042756 101/8553 8/31/02 5.31031 Iv6.'24-e'3f OCS Ceeurity' 100429SI 101/9553 9(//O2 2,591 94 One Stop Blueprinlirvi* 58714 101/6553 bosemenl. 1/2 of 2nd Hr, 3rd Hr. cleaning of ^5234 80,000.00 ?34
les for A'C units in compute- room
Stance Beclric' S/11/02 S 6,006 56 2499 (missing) 116/8553 10/21/02 Teylcr Environmental Group 34 12/4/01 150 9'23/01 - 10/24/01 asPectos project monitoring Tsvicr Environmental Group 36 9/24/01 - 1O/31/C1 asbestos projoct monitoring WTC complex Taylct Envirc 221
psag carpel tost lent procedure 257 1/22/83 4S9.C0 PS224 Taylar Ervironmenlal Grniip 4/22/03 439 OO Hsay asboslos testing Tavlnr Ervironmental GroLo (niitrsirij) 8'31/02-9.'2/t)2 carpet test tent procedures 2nd llr Taylor Environmer.lal Grouo 150 (library), 4lh fir (arl 167,176.182, 167, 176, 182, TOK 207, 22fe, 557 11/01 .7(02 56,657 93 ps.'issn fee and staffing for clesnina ol PS/IS39 149, 199, 207, 22s, 240. 249. 79, 81, 92, 101. Tnx _9X_S4^0ej_11£ 213,760 14 fee and staff no lor clej I of Sluyi'esont 149, 167, 176, 162,199. 207, 226. 240, 249, TDX 3S3 IDZai - 7(02 50.600.1/ ?34 ________________ fee and staffing 'or cleaning of PS234 Trio Asbestos Removal. Coin 11/20/01 76,500 61 150 inlerior cleatiirg 3 26 5(23'01 - 10/6/,91 firs 1. ?. 3, 9-11, roof, pool, aud., Trio Asbestos Remuval, Cui p. 1/23/02 560,64811 477 basem.sni cleaning of Sluwesari rerro'/e'replace wail unilveniilators, HVAC deaning, VSR Mechanical, Inc.' PSggMSI 182/8240 1/O/D3 PS'lsas replace nsula'io VSRMcchanical. Inc.' -63 257(3240 7/10(02 78.484.18 I erTo-vaZreinslal and re nsulate all unit ventilators VS RMecfianieal, Inc.- 1S2/8240 1/21/02 1.434.20 P5/IS89 VS R Mechanical, Inc.' 226/8240 1/8/02 VS RMechanicai, Inc.' tie 226/B240 3,441.13 repairs Io unit venhlalors 1/02 1/2B/02 1/28/02 3,774 00 -g 234 Siers in Rooms 104 and 120(1/02 clean regislsrs in 16 rooms (1/02 clean dif . and return I1/02 79/S553 394,86750 HVAC eleani 477 I f rs. locate and measure uml ventii.etors for covers, plus fo V5RMecharical. Ino" 61/8553 S'21/02 6,543.40 477 ________________________________ ATC leslin 6O3.11Q.OQ 477 FVAC cleaning firs. - • 10, cellar. Fir. 11 MEP 1.815C0 477 collect and Issi NACCA dUSi sanplei 16,421.34 477 V iRMecharlcal, Inc.' 259
IS 51,004.27 V i R Mechanical, Inn' 11/22/02 'iZ & R Mechanical, Ine e/4/02~ $ Warren & Panjer Engineers ' Z/Ol asbestos projeo: mcnitoi-ing (TEM) 0 71.610,34
Warren & Panzer Engineers 139 ?,C87 50 ?34 TOTit-S 6,315,244.. $ S,338.393.S9 GRAtJD TOTAL $ 15,653,638.71 FEMA DOWNTOWN SCHCOlS SORTED
CITY_21MC100_005170006
NYC-WTC_000359483
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
NYC-WTC_000359488
FEMA project worksheet narrative on WTC construction materials.
6 shared non-person entities · similarity 0.917
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000417294
Testing mechanics/chain-of-custody form with laboratory reference; building WTC-related.
1 shared non-person entities · similarity 0.909
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000141870
Form document with significant degradation or scanning quality issues making content indecipherable.
3 shared non-person entities · similarity 0.908
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000156126
Memorandum regarding asbestos testing and abatement procedures on the 10th floor of a Lower Manhattan building.
2 shared non-person entities · 1 shared topics · similarity 0.902
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000141922
McGraw-Hill construction and engineering trade publication; appears unrelated to 9/11 environmental records.
2 shared non-person entities · similarity 0.900
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000243516
FEMA project worksheet for WTC construction materials context and asbestos discussion.
5 shared non-person entities · similarity 0.900
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000143354
Fragmented text containing only a reference number and unreadable characters from the DEP Box 06 collection.
3 shared non-person entities · similarity 0.900
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000385739
Narrative describing WTC steel and concrete usage and asbestos regulations.
6 shared non-person entities · similarity 0.898
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000131115
Letter from NYLS Director enclosing ambient air sampling data for post-9/11 environmental assessment.
2 shared non-person entities · similarity 0.898
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000243504
FEMA declaration/project worksheet for WTC asbestos regulations and materials.
6 shared non-person entities · similarity 0.898
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000120641
Management submits environmental test results and details of common area cleaning and facade washing for multiple Rector Place buildings.
2 shared non-person entities · similarity 0.898
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000102343
Invoice from Asbestos Removal Corp detailing costs for asphalt and gravel roof cleanup at 80 Maiden Lane.
1 shared non-person entities · similarity 0.897
machine-extracted · confidence unavailable · Check page ↗Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
NYC-WTC_000385739
Narrative describing WTC steel and concrete usage and asbestos regulations.
Similarity score 0.949 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000251589
FEMA project worksheet and paperwork burden disclosure for disaster-related work.
Similarity score 0.946 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000385741
FEMA worksheet re: WTC and asbestos regulations with sample data.
Similarity score 0.945 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000196328
Laboratory report detailing transmission electron microscopy analysis of airborne asbestos samples collected for the NYC DEP project in October 2002.
Similarity score 0.943 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000135962
Invoice record with significant text redaction, likely detailing services or materials provided for WTC environmental projects.
Similarity score 0.941 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000196328
Laboratory report detailing transmission electron microscopy analysis of airborne asbestos samples collected for the NYC DEP project in October 2002.
Similarity score 0.940 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000359488
FEMA project worksheet narrative on WTC construction materials.
Similar indexed content
NYC-WTC_000417294
Testing mechanics/chain-of-custody form with laboratory reference; building WTC-related.
Similar indexed content
NYC-WTC_000141870
Form document with significant degradation or scanning quality issues making content indecipherable.
Similar indexed content
NYC-WTC_000156126
Memorandum regarding asbestos testing and abatement procedures on the 10th floor of a Lower Manhattan building.
Similar indexed content
NYC-WTC_000141922
McGraw-Hill construction and engineering trade publication; appears unrelated to 9/11 environmental records.
Similar indexed content