Daily work force report, World Trade Center, Dec 12, 2001

Machine-extracted title · confidence 32%

Night shift daily workforce and equipment for World Trade Center, Dec 12, 2001.

NYC-WTC_000356734
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

GRACE CONTRACTING CORP. i^^-45 6lh Road. Whilestone. N Y. 11357-(718) 767-9000 DATE: i DECEMBER 12, 2001 (NIGHT FINAL)

DAILY WORK FORCE REPORT

pob Name & Location; World Trade Center , Contract No. Weather Conditions COOL - OVERCAST & DRIZZLE

r_ Labor CLASSIFICATION QUANf?] ilji Equipment Description MANNED STANDBY IDLE Superintendent 2 CAT 966 LOADER 1 PROJECT ENGINEER 1 CAT 446 BACKHOE 1 OFFICE ENGINEER 1 CAT 973 LOADER 1 FOREMEN 2 CAT 365 GRAPPLER 1 SAFETY OFFICER CAT 375 GRAPPLER 1 LABORERS 19 HITACHI 750 GRAPPLER T IRON WORKERS HITACHI 550 GRAPPLER 1 LOCAL 14 5 HITACHI 550 GRAPPLER 1 LOCAL 15 8 HITACHI 1200 GRAPPLER 1 CARPENTER 185 CFM COMPRESSOR 1 CARPENTER FOREMAN 235 HAMMER HOE RAM 1 TEAMSTERS 1 MECHANICS TRUCK 2 MECHANICS 2 TOOL TRUCK 1 HOUSE WRECKERS 12 TOOL VAN ROLL OFF 1200 PASSING MATERIAL FROM WEST SLOPE TO DUMP TRAILERS 'bottom of hole - 750/ 375 LOADING OUT LOW BED TRAILER JKES AND FLATS. 973 ALSO LOADING EUKES. HIGH DECK TRAILERS I WELDING TRUCK CONTINUED WIDENING ROAD TO AMEC SITE FUEL TRUCK 1 i PICKUP TRUCKS 2 550 LOADING TRUCKS FROM TOP TO GRACE TRUCKS ' LIGHT TOWERS 13 ' SITE MULE 3 BURNERS CONTINUED ON NORTH WALL DUMP TRUCKS ' 10 WHEEL DUMP TRUCK LOADS OUT: ' FLASHING ARROW BOARD GRACE - 35 LOADS_________________ _ OFFICE TRAILER/GENER. 1 TULLY AREA 61 EUKES AND 10 FLATS I. CARGO BOXES 3 AMEC - 105 TOTAL (39 GRACE AND 65 DOS) j. FLAT TRUCK 1 i PUMP 2 i ROLLER 1 i RAINMAKER/GENIE LIFT 1 1 Description of Work; • I COMPLETED WORK LOAD OUT STEEL AND DEBRIS i MANNED TARPING AND TRIMMING STATIONS 1 MANNED WATER STATIONS FOR DUST CONTROL I iMAINTAINED TRAFFIC FLOW IN AND OUT OF AREA________ [ CONTINUED REMOVING DEBRIS FROM LOWER LEVELS OF |WV CORNER OF TOWER 2 INSTALLED OF GPS SYSTEMS____________________________ ELEVATIONS: ALL MACHINES LEVEL B-5,253

GRACE CONTRACTING CORP Approved By: Tille: BY; .a f OF--------- SUPERINTENDENT

DAILY WORK FORCE REPORT 1212N.xls

CITY_2IMCl00_001761298 NYC-WTC_000356734

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000356734Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →