Daily work force report, World Trade, Nov 2001

Machine-extracted title · confidence 32%

Daily workforce and equipment assignments for World Trade site, Nov 2001.

NYC-WTC_000356683
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

GRACE CONTRACTING CORP. 151-45 Sth Road, Whitestone NY 1 1357- I? 18) 767-9000 DATE; NOVEMBER-1-01 NIGHT (FINAL)

i DAILY WORK FORCE REPORT I

Job Name & Location; World Trade Center Contract No. Weather Conditions 1 ____________________ Labor Equipment CLASSIFICATION UANTIT Description MANNED STANDBY IDLE SUPERINTENDENT 2 CAT 966 LOADER i PROJECT ENGINEER 1 ■ CAT 446 BACKHOE 1 JO=FIC.E ENGINEeP 1 ■ CAT 973 LOADER 1 j'FOREMSN 1 ’ CAT 365 GRAPPLER T iiSAFeiTT OFH-CEW ' CAT 375 GRAPPLER 1 '■L-ABm-ER-S 17 ' HITACHI 750 GRAPPLER 1 WN ,WO®«£JSS ■ HITACHI 550 GRAPPLER 1 1 iLOC-WL .14 4 IhITACHI 1200 GRAPPLER 1' hffiKAL ;T5 7 COMPACTION TRUCK jCKRFENTER’ MECHANICS TRUCK 1 1 IpARPENTER FOREMAN TOOL TRUCK pAMSTERS 19 TOOL VAN MECHANICS 1 ROLL OFF IrOUSE WRECKERS T DUMP TRAILERS 11 LOW BED TRAILER HIGH DECK TRAILERS 7 WELDING TRUCK FUEL TRUCK 1 PICKUP TRUCKS 7 LIGHT TOWERS 8 PARTS TRUCK 1 II DUMP TRUCKS 10 WHEEL DUMP TRUCK FLA.SHING ARROW BOARD 1 OFFICE TRAILER 1 TUBE TRAILER I FLAT TRUCK________ ___ 1 L. 185 CFM-COMPR 7

"Still Oown - wailing for piston Description dfVWtrk_____________________________________________________________________________________________________ aURNiEB.® STAWED STEEL. TRUCKED OFF JOB MAN TAIKPINGstations & MAN WATER STATION FOR DUST CONTROL___________________________________ REQUESTeD IURDOKS FROM DOS AT 8 AM _______________________________________________ MAINTA«< JRAFRC flow IN AND OUT OF AREA REMOVE STEEL AAfQIDEBRIS FROM WTC_________ _______________________________________________________ CONTINUE SmLOiNG.'ROAD NORTH WITH DEBRIS______________________________________________________ WIDENED NORTH SIDE OF HAUL RD - USED STEEL BEAMS AND DEBRIS___________________________________ BEGIN ROTATING MACHINES INTO GREASE/MAINTENANCE AT 1AM EPA ON JOB ■ CHEMICAL TANKS IN VISTA LAUNDRY ROOM - BOVIS WILL ADVISE ON OUR RESPONSIBILITY

Approvea By; Title; SUPERINTENDENT | £25_____

CITY_2IMCl00_001761222 NYC-WTC_000356683

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000356683Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →