Daily work force report, World Trade Center, Jan 2002

Machine-extracted title · confidence 44%

Day final daily workforce report with labor classifications and equipment for World Trade Center.

NYC-WTC_000419296
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

GRACE CONTRACTING CORP. 151-45 6th Road. Whitestone, N.Y. 11357-{718) 767-9000 DATE: 1/15/02 DAY FINAL

DAILY WORK FORCE REPORT

Job Name & Location: World Trade Center Contract No. Weather Conditions = Labor r I Equipment CLASSIFICATION QUANT. Description MANNED STANDBY IDLE SUPERINTENDENT 1 CAT 966 LOADER 1 PROJECT ENGINEER 2 CAT446 BACKHOE 1 OFFICE ENGINEER CAT 973 LOADER 1 FOREMEN 1 CAT 365 GRAPPLER 1 SAFETY OFFICER 1 CAT 375 GRAPPLER 1 LABORERS 10 CAT 375 BUCKET 1 IRON WORKERS HITACHI 750 GRAPPLER .1 LOCAL 14 5 HITACHI 550 GRAPPLER 1 LOCAL 15 7 HITACHI 1200 GRAPPLER 1 CARPENTER 185 CFM COMPRESSOR 1 CARPENTER FOREMAN 1 235 HAMMER HOE RAM 1 TEAMSTERS 1 MECHANICS TRUCK 2 MECHANICS 2 TOOLTRUCK HOUSE WRECKERS 5 TOOL VAN 1 ROLL OFF

e DELIVERIES: MARGOLIS DUMP TRAILERS LOW BED TRAILER HIGH DECK TRAILERS WELDING TRUCK 1 FUEL TRUCK 1 PICKUP TRUCKS 5 LIGHT TOWERS 15 SITE MULE 3 DUMP TRUCKS 10 WHEEL DUMP TRUCK ’LIGHT TOWERS USED FOR 2 HOURS FLASHING ARROW BOARD 1 OFFICE TRAILER/GENER. 1 CARGO BOXES 3 FLAT TRUCK 1 PUMP 2 RAINMAKER/GENIE LIFT 1

Description of Work:_______________________________________________________________________________ COMPLETED WORK: _________________________________________________________________________ CONTINUED REMOVING DEBRIS FROM LOWER LEVELS OF TOWER 2 AND SOUTH OF MAIN CHILLER PLANT MANNED WATERING STATIONS FOR DUST CONTROL ____________________________________________ MAINTAINED TRAFFIC INTO AND OUT OF AREA_____________________________________________________ LOADS OUT:________________________________ 65__________________________________________________ EUKES OUT: . 163_________________________________

GRACg co WTRA^TlNy/oRPl Approved By: Title:_______ For: superIRtendent

01.600671 DAILY WORK FORCE REPORT0115D.xls

CITY_21MC100_004163194

NYC-WTC_000419296

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000419296Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000237645

Night shift report from Grace Contracting documenting labor and equipment counts at the World Trade Center site on January 10, 2002.

Similar indexed content

Compare copies and versions →