NYC-WTC_000385123
Form containing terrorism-related materials; NYC archives material.
6 shared non-person entities · 1 shared topics · similarity 0.956
machine-extracted · confidence unavailable · Check page ↗Codified records of documents and custody in DOT files.
NYC-WTC_000355074–000355754OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
Pt. 37, App. D review. The states' role is as a commenter, not as a reviewer. This section also specifies annual progress reports concerning the meeting of previously approved milestones, any slippage (with the reasons for it and plans to catch up), and any significant changes in the operator's envi- ronment, such as the withdrawal from the 49 CFR Subtitle A (10-1-98 Edition tive effect on transportation provided to per. sons with disabilities In general. The Depart- ment urges each entity required to submit a plan to work with current providers of trans- portation, not only to determine what trans. portation services they provide, but also to continue to provide service into the foresee. able future. 1! marketplace of a private paratransit pro- Second, § 37.137 specifies requirements for vider or whose service the entity has relied public participation. First, the entity must upon to provide part of its paratransit serv- perform outreach, to ensure that a wide ice. range of persons anticipated to use the pars. Paragraph (d) of this section specifies a transit service know about and have the op. maximum time period for the phase-in of the portunity to participate in the development implementation of paratransit plans. The of the plan. Not only must the entity iden- Department recognizes that It is not reason- tify who these individuals or groups are, the able to expect paratransit systems to spring entity also must contact the people at an into existence fully formed, like Athena early stage in the development process. . from the head of Zeus. Under this paragraph, The other public participation require- all entities must be in full compliance with ments are straightforward. There must be a all paratransit provisions by January 26, public hearing and an opportunity to com- 1997, unless the entity has received a waiver ment. The hearing must be accessible to from FTA based on undue financial burden those with disabilities, and notice of the (which applies only to the service criteria of hearing must be accessible as well. There is §37.131, not to eligibility requirements or a special efforts test Identified In this para- other paratransit provisions). graph for comments concerning a multi-year While the rule assumes that most entities phase-in of a paratransit plan. will take a year to fully implement these The final general requirement of the sec- provisions, longer than a year requires the tion specifies that efforts at public participa- paratransit plans to submit milestones that tion must be made permanent through some are susceptible to objective verification. Not mechanism that provides for participation in all plans will be approved with a five-year all phases of paratransit plan development lead-in period. Consistent with the proposed and submission. The Department Is not re- rule, the Department intends to look at each quiring that there be an advisory committee plan individually to see what is required for established, although this Is one method of implementation in each case. DOT may ap- institutionalizing participation. The Depart- prove only a shorter phase-in period in a ment 1s not as interested in the specific given case. structure used to ensure public participation as we are interested in the effectiveness of Section 37.137 Paratransit Plan Development the effort. Section 35.137 establishes three principal The Department believes that public par- requirements in the development of para- ticipation Is a key element in the effective transit plans. implementation of the ADA. The ADA is an First is the requirement to survey existing opportunity to develop programs that will paratransit services within the service area. ensure the integration of all persons into not This is required by section 223(c)(8) of the just the transportation system of America, ADA. While the ADA falls short of explicitly but all of the opportunities transportation requiring coordination, clearly this is one of makes possible. This opportunity Is not the goals. The purpose of the survey is to de- without tremendous challenges to the tran- termine what Is being provided already, so sit providers. It Is only through dialogue. that a transit provider can accurately assess over the long term, that usable, possible what additional service is needed to meet the plans can be developed and implemented. service criteria for comparable paratransit Section 37.139 Plan Contents service. The plan does not have to discuss private paratransit providers whose services This section contains substantive cat- will not be used to help meet paratransit re- egories of information to be contained in the quirements under this rule. However, the paratransit plan: Information on current and public entity will need to know specifically changing fixed route service; inventory of what services are being provided by whom if existing paratransit service; discussion of the entity is to count the transportation to- the discrepancies between existing para- ward the overall need. transit and what is required under this regu- Since the public entity is required to pro- lation; a discussion of the public participa- vide paratransit to all ADA paratransit eligi- tion requirements and how they have been ble individuals, there is some concern that met; the plan for paratransit service; the currently provided service may be cut back budget for paratransit services; efforts to co- or eliminated. It is possible that this may ordinate with other transportation provid- happen and such action would have a nega- ers; a description of the process in place or
500
NYC-WTC 000355583
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
No available related records indexed in this group.
NYC-WTC_000385123
Form containing terrorism-related materials; NYC archives material.
6 shared non-person entities · 1 shared topics · similarity 0.956
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000153563
Document page from DEP Box 26 regarding World Trade Center Air Quadrant D with illegible text content.
4 shared non-person entities · 1 shared topics · similarity 0.940
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000115338
License agreement between the City of New York and a landowner for removing foreign material from building exteriors at 211 Pearl Street.
4 shared non-person entities · 1 shared topics · similarity 0.934
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000165271
Engineering drawings and specifications for replacing a high-pressure water line under the Lincoln Tunnel contract.
1 shared non-person entities · 1 shared topics · similarity 0.934
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000115561
Attorney letter regarding legal proceedings between environmental protection authorities and property owners at 29 Park Row.
5 shared non-person entities · 1 shared topics · similarity 0.933
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000118384
Agreement between the City of New York and 60 Broad Street LLC for removing foreign material from building exteriors.
6 shared non-person entities · 1 shared topics · similarity 0.932
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000102407
Header page of legal correspondence from counsel regarding environmental remediation at 83 Maiden Lane in October 2002.
6 shared non-person entities · 1 shared topics · similarity 0.932
machine-extracted · confidence unavailable · Check page ↗5 shared non-person entities · 1 shared topics · similarity 0.930
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000112508
A license agreement between the City of New York and a landowner to remove foreign material from building exteriors near the World Trade Center site.
7 shared non-person entities · 1 shared topics · similarity 0.930
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000118972
Facility inspection form documenting ACM and air monitoring status for a building at 65 Beaver Street.
6 shared non-person entities · 1 shared topics · similarity 0.930
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000118359
Agreement between the City of New York and 60 Broad Street LLC for removing foreign material from building exteriors.
6 shared non-person entities · 1 shared topics · similarity 0.930
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000127520
Official notice urging building owners to participate in the DEP program for cleaning World Trade Center debris from exterior surfaces.
6 shared non-person entities · 1 shared topics · similarity 0.929
machine-extracted · confidence unavailable · Check page ↗Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
NYC-WTC_000279382
Annual report for NYC WTC environmental program; includes NYC-WTC reference.
Similarity score 0.934 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000279382
Annual report for NYC WTC environmental program; includes NYC-WTC reference.
Similarity score 0.932 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000279382
Annual report for NYC WTC environmental program; includes NYC-WTC reference.
Similarity score 0.932 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000279382
Annual report for NYC WTC environmental program; includes NYC-WTC reference.
Similarity score 0.925 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000279382
Annual report for NYC WTC environmental program; includes NYC-WTC reference.
Similarity score 0.923 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000279382
Annual report for NYC WTC environmental program; includes NYC-WTC reference.
Similarity score 0.922 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000385123
Form containing terrorism-related materials; NYC archives material.
Similar indexed content
Document page from DEP Box 26 regarding World Trade Center Air Quadrant D with illegible text content.
Similar indexed content
NYC-WTC_000115338
License agreement between the City of New York and a landowner for removing foreign material from building exteriors at 211 Pearl Street.
Similar indexed content
NYC-WTC_000165271
Engineering drawings and specifications for replacing a high-pressure water line under the Lincoln Tunnel contract.
Similar indexed content
Attorney letter regarding legal proceedings between environmental protection authorities and property owners at 29 Park Row.
Similar indexed content