Page image not rendered yet. The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text
OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
form 1999 to 2000. Over the last five years the
paratransit service has an overall growth in the
“economy” measure of 3.5 percent., due to a stringent
cost containment program for paratransit service and
the low maintenance costs on the 5 vehicles delivered
since 1999 that provide this service.
These lower costs have enabled the economy of the
operation to increase. Replacing these vehicles in their
normal replacement cycle ( 2 1997 vehicles are due in
2002) will be problematic for UTA because of their
limited ability to raise the 10 percent local match to the
Federal and State dollars. This will negatively affect
the economy of the service as the older vehicles will
require higher maintenance costs. The ratio of revenue
passengers per mile, a measure of service
“effectiveness” was also stable over the five year time
frame, decreasing by 2.8 percent. This is mostly due to
the loss of passengers these past two years.
III-123
NYC-WTC_000279529
OCR can misread numbers and units. Confirm readings against the page image before using them.
NYC-WTC_000279529Source: NYC Law Department, mirrored locally