NYC-WTC_000385123
Form containing terrorism-related materials; NYC archives material.
6 shared non-person entities · 1 shared topics · similarity 0.956
machine-extracted · confidence unavailable · Check page ↗Codified records of documents and custody in DOT files.
NYC-WTC_000355074–000355754OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
Office of the Secretary of Transportation Pt. 37, App. D
In this hypothetical, Commuter A is re- If an extension to a rail system (e.g., a sponsible for a total of 50 percent of the re- commuter system) is made, such that the sponsibility for the station. Commuter A is system comes to include existing inacces- responsible for 25 percent of the responsibil- sible stations that have not previously been ity because of its role as a station owner and part of the system, the Department con- another 25 percent because of its operation of strues the ADA to require application of key passenger rail service through the station. station accessibility in such a situation. The The Department recognizes that there will same would be true for a new start com- be situations in which application of this muter rail system that began operations scheme will be difficult (e.g., involving prob- using existing stations. Key station plan- lems with multiple owners of a station whose ning, designation of key stations, and with ownership percentages may be difficult to being consistent with the ADA would be re- ascertain). The Department again empha- quired. The Department would work with the sizes that agreement among the parties is commuter authority involved on a case-by- the best way of resolving these problems, but case basis to determine applicable time lim- we are willing to work with the parties to its for accessibility, consistent with the time ensure a solution consistent with this rule. frames of the ADA. The entity must develop a compliance Section 37.51 Key Stations in Commuter Rail plan, subject to the public participation and Systems planning process set forth in paragraph (d) of These sections require that key stations in each of these sections. Note that this plan light, rapid, and commuter rail systems be must be completed by July 26, 1992, not Jan- made accessible as soon as practicable, but uary 26, 1992, as in the case of paratransit no later than July 26, 1993. Being made ac- plans. The key station plans must be submit- cessible, for this purpose, means complying ted to FTA at that time. (The statute does with the applicable provisions of appendix A not require FTA approval of the plans, how- to this part. "As soon as practicable" means ever.). that, if modification can be made before July A rail operator may request an extension 26, 1993, they must be. A rail operator that of the July 1993 completion deadline for ac- failed to make a station accessible by July cessibility modifications to one or more key 1993 would be in noncompliance with the stations. The extension for light and rapid ADA and this rule, except in a case where an rail stations can be up to July 2020, though extension of time had been granted. two thirds of the key stations (per the legis- What is a key station? A key station is one lative history of the statute, selected in a designated as such by the commuter author- way to maximize accessibility to the whole ity or light/rapid rail operator, through the system) must be accessible by July 2010. planning process and public participation Commuter rail stations can be extended up process set forth in this section. The five cri- to July 2010. teria listed in the regulation are intended to Requests for extension of time must be guide the selection process but, while the en- submitted by July 26, 1992. FTA will review tity must take these criteria into account the requests on a station-by-station basis ac- (and this consideration must be reflected in cording to the statutory criterion, which is the planning process and documents), they whether making the station accessible re- are not mandatory selection standards. That quires extraordinarily expensive alterations. is, it is not required that every station that An extraordinarily expensive alteration is meets one of the criteria be designated as a raising the entire platform, installing an ele- key station. Since the criteria are not man- vator, or making another alteration of simi- datory selection standards, the understand- lar cost and magnitude. If another means of ing of their terms is also a matter appro- making a station accessible (e.g., Installa- Priately left to the planning process. A tight, tion of a mini-high platform in a station legalistic definition is not necessary in the where it is not necessary to install an eleva- context of factors intended for consideration. tor or to provide access to the platform for For instance, what constitutes a major ac- wheelchair users), then an extension can be tivity center or how close a station needs to granted only If the rail operator shows that be to another station to not be designated as the cost and magnitude of the alteration is key depend largely on local factors that it similar to that of an elevator installation or would not be reasonable to specify in this platform raising. rule. The rule does not include a specific dead- Given the wide discretion permitted to rail line for FTA consideration of an extension O perators in identifying key stations, there request. However, since we are aware that, in WOuld be no objection to identifying as a key the absence of an extension request, acces- station a new (presumably accessible) sta- sibility must be completed by July 1993, we under construction. Doing so would will endeavor to complete review of plans as in: Involve soon as possible, to give as much lead time consideration of the key station cri- Dublicand would be subject to the planning/ as possible to local planning and implemen- Participation process. tation efforts.
481
NYC-WTC 000355564
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
No available related records indexed in this group.
NYC-WTC_000385123
Form containing terrorism-related materials; NYC archives material.
6 shared non-person entities · 1 shared topics · similarity 0.956
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000153563
Document page from DEP Box 26 regarding World Trade Center Air Quadrant D with illegible text content.
4 shared non-person entities · 1 shared topics · similarity 0.940
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000115338
License agreement between the City of New York and a landowner for removing foreign material from building exteriors at 211 Pearl Street.
4 shared non-person entities · 1 shared topics · similarity 0.934
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000165271
Engineering drawings and specifications for replacing a high-pressure water line under the Lincoln Tunnel contract.
1 shared non-person entities · 1 shared topics · similarity 0.934
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000115561
Attorney letter regarding legal proceedings between environmental protection authorities and property owners at 29 Park Row.
5 shared non-person entities · 1 shared topics · similarity 0.933
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000118384
Agreement between the City of New York and 60 Broad Street LLC for removing foreign material from building exteriors.
6 shared non-person entities · 1 shared topics · similarity 0.932
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000102407
Header page of legal correspondence from counsel regarding environmental remediation at 83 Maiden Lane in October 2002.
6 shared non-person entities · 1 shared topics · similarity 0.932
machine-extracted · confidence unavailable · Check page ↗5 shared non-person entities · 1 shared topics · similarity 0.930
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000112508
A license agreement between the City of New York and a landowner to remove foreign material from building exteriors near the World Trade Center site.
7 shared non-person entities · 1 shared topics · similarity 0.930
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000118972
Facility inspection form documenting ACM and air monitoring status for a building at 65 Beaver Street.
6 shared non-person entities · 1 shared topics · similarity 0.930
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000118359
Agreement between the City of New York and 60 Broad Street LLC for removing foreign material from building exteriors.
6 shared non-person entities · 1 shared topics · similarity 0.930
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000127520
Official notice urging building owners to participate in the DEP program for cleaning World Trade Center debris from exterior surfaces.
6 shared non-person entities · 1 shared topics · similarity 0.929
machine-extracted · confidence unavailable · Check page ↗Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
NYC-WTC_000165290
Letter enclosing a signed agreement between DEP and a contractor regarding sewer work in the vicinity of 11th Avenue.
Similarity score 0.915 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000165687
Letter from DEP Office of Legal Counsel enclosing an executed agreement regarding a sewer matter near 11th Avenue and West 33rd Street.
Similarity score 0.915 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000279382
Annual report for NYC WTC environmental program; includes NYC-WTC reference.
Similarity score 0.908 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000279382
Annual report for NYC WTC environmental program; includes NYC-WTC reference.
Similarity score 0.907 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000141922
McGraw-Hill construction and engineering trade publication; appears unrelated to 9/11 environmental records.
Similarity score 0.906 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000415925
Port Authority discusses temporary lower Manhattan terminal plan.
Similarity score 0.904 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000385123
Form containing terrorism-related materials; NYC archives material.
Similar indexed content
Document page from DEP Box 26 regarding World Trade Center Air Quadrant D with illegible text content.
Similar indexed content
NYC-WTC_000115338
License agreement between the City of New York and a landowner for removing foreign material from building exteriors at 211 Pearl Street.
Similar indexed content
NYC-WTC_000165271
Engineering drawings and specifications for replacing a high-pressure water line under the Lincoln Tunnel contract.
Similar indexed content
Attorney letter regarding legal proceedings between environmental protection authorities and property owners at 29 Park Row.
Similar indexed content