NYC 9/11 Public Portal Document
Liberty
Mutual.
Industrial Hygiene Air Sample Results
Summary for Week of 03-22-02 to 03-29-02
Attached is a summary of the laboratory results completed during the week of March 22,2002 to
March 29, 2002. The air samples were collected by ATC associates at the World Trade Center site.
The majority of the samples collected by ATC are “personal samples”, meaning that the worker wore
the sampling device. In addition, the majority of results have shown exposure levels to be below
shift adjusted occupational exposure limits. Those results which were higher than the shift adjusted
occupadonal exposure limits were;
Two Diesel exhaust fume concentrations as follows:
® 189 % of the shift adjusted OEL on a spotter at WTC6, level B3,
• 127 % of the shift adjusted OEL on a bobcat operator moving asbestos waste at
WTC6, level B5,
• Six Quartz concentrations as follows:
® 875 % of the shift adjusted OEL on a spotter cleaning debris on the NW section of
level Bl, WTC6,
® 458 % of the shift adjusted OEL on a Brokk 150 operator cutting concrete at WTC6,
level B4,
® 263 % of the shift adjusted OEL on an operator breaking concrete at WTC6, level
Bl,
® 246 % of the shift adjusted OEL on a spotter at WTC6, level B3,
• 133 % of the shift adjusted OEL on a bobcat operator at WTC6, level B3,
• 113 % of the shift adjusted OEL on a laborer core drilling at WTC6, level B2.
• One Asbestos concentration of 114 % of the shift adjusted OEL on a spotter in the
depression at Tower 2.
In addition, the following results are at or above 50% of the shift adjusted OEL (but below 100% of
the shift adjusted OEL). The operations associated with these results should receive attention to
ensure that these results are an accurate reflection of acmal exposures and that feasible steps are
taken in an attempt to ensure that exposures do not elevate over time;
• One Ozone concentrations at 86% of the shift adjusted OEL on a worker drilling for
tirbacks on the West slurry wall,
• Two Respirable dust concentrations of 79 % and 50 % of the shift adjusted OEL
on a torch cutter working on levels B2 and B3, WTC6, and a worker breaking concrete
on level Bl, WTC6,
• Five Quartz concentrations as follows:
75 % of the shift adjusted OEL on a worker drtUing concrete on level B3, WTC6,
63 % of the shift adjusted OEL on a torch cutter at level B2, WTC6,