NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 1 page

Daily work force report, World Trade Center site, Jan 2002

Machine-extracted title · confidence 42%

Day shift daily workforce and equipment entries for World Trade Center; January 16, 2002.

NYC-WTC_000341045
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

GRACE CONTRACTING CORP. 151-»5 6th Road, Whitestone, N.Y. 11357-(718) 767-9000 DATE: 1/16/02 DAY FINAL

DAILY WORK FORCE REPORT

Job Name & Location: World Trade Center Contract No. Weather Conditions

Labor Equipment CLASSIFICATION QUANT. Description MANNED STANDBY IDLE SUPERINTENDENT 1 CAT 966 LOADER 1 PROJECT ENGINEER 2 CAT446 BACKHOE OFFICE ENGINEER CAT 973 LOADER 1 FOREMEN 1 CAT 365 GRAPPLER 1 SAFETY OFFICER 1 CAT 375 GRAPPLER 1 LABORERS 11 CAT 375 BUCKET 1 IRON WORKERS HITACHI 750 GRAPPLER 1 LOCAL 14 6 HITACHI 550 GRAPPLER LOCAL 15 8 HITACHI 1200 GRAPPLER 1 CARPENTER 185 CFM COMPRESSOR 1 CARPENTER FOREMAN 1 235 HAMMER HOE RAM 1 TEAMSTERS 1 MECHANICS TRUCK 2 MECHANICS 2 TOOL TRUCK HOUSE WRECKERS 4 TOOL VAN 1 ROLL OFF DUMP TRAILERS LOW BED TRAILER DELIVERIES: GRACE ASPHALT 70 CUBIC YARDS 3/4 STONE HIGH DECK TRAILERS ALL LOCK AND GLASS CO WELDING TRUCK 1 FUEL TRUCK 1 PICKUP TRUCKS 6 LIGHT TOWERS 5 SITE MULE 3 DUMP TRUCKS 10 WHEEL DUMP TRUCK •LIGHT TOWERS USED FOR 2 HOURS FLASHING ARROW BOARD OFFICE TRAILER/GENER. 1 CARGO BOXES 3 FLAT TRUCK 1 •NOTE TRUCK 66 RAN 2 LOADS OF STONE FROM PUMP 2 WHITESTONE TO THE SITE RAINMAKER/GENIE LIFT

Description of Work: DELAYS: GRACE 750,375G, 1200 GATEWAY 550G & MAZZOCH11200 FROM 7AM- 11AM DUE TO__________________ PREPARING RAMP AT SLURRY WALL TO ENABLE MACHINES CROSSING INTO PIT FROM WEST SIDE HIGHWAY GATEWAY 550G DELAYED 1PM- 4PM WITH RECOVERY AT AMEC ROAD______________________________________ GRACE 1200 DELAYED 1PM-2:15PM DUE TO YONKERS BURNERS BURNING CANDLESTICKS THAT WERE NOT AUTHORIZED TO BURN IN THAT AREA________________________________________________________________ 'continued REMOVING DEBRIS FROM NORTH HALL ROAD AND LOWER LEVELS OF TOWER 1 TO ACCOMMODATE NEWBRIDGE. ________________________________________________________________________ MANNED WATERING STATIONS FOR DUST CONTROL___________________________________________________ MAINTAINED TRAFFIC INTO AND OUT OF AREA_________________________________ LOADS OUT: 33_________________________________________________________________ _________________ EUKESOUT: 132

GRACE CONTRACTING CORP Approved By: BY: I Title: For: SUPERINTENDENT

DAILY WORK FORCE REPORT0116D.xls

CITY_21MC100_003006022

NYC-WTC_000341045

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000341045Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000356548

Day final daily workforce and equipment roster for World Trade site, Jan 16, 2002.

Similar indexed content

Compare copies and versions →