Daily work force report, World Trade, Jan 2002

Machine-extracted title · confidence 41%

Workforce and equipment summary for World Trade site, Jan 16, 2002.

NYC-WTC_000342298
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

GRACE CONTRACTING CORP. 151.45 61(1 Road, Whitestone, N.Y. 11357-(718) 767-9000 DATE: 1/16/02 DAY FINAL

DAILY WORK FORCE REPORT

Job Name & Location: World Trade Center Contract No. Weather Conditions

Labor Il Equipment CLASSIFICATION QUANT. ^1 Description MANNED STANDBY IDLE SUPERINTENDENT 1 lIcAT 966 LOADER 1 PROJECT ENGINEER 2 1CAT 446 BACKHOE ~ OFFICE ENGINEER lIcAT 973 LOADER ~ 1 FOREMEN 1 CAT 365 GRAPPLER 1 SAFETY OFFICER 1 CAT 375 GRAPPLER 1 LABORERS 11 CAT 375 BUCKET 1 IRON WORKERS HITACHI 750 GRAPPLER 7 LOCAL 14 6 HITACHI 550 GRAPPLER LOCAL 15 8 HITACH11200 GRAPPLER 1 CARPENTER 185 CFM COMPRESSOR 1 CARPENTER FOREMAN 1 235 HAMMER HOE RAM 1 TEAMSTERS 1 MECHANICS TRUCK 2 MECHANICS 2 TOOL TRUCK HOUSE WRECKERS 4 TOOL VAN 1 ROLL OFF DUMP TRAILERS LOW BED TRAILER DELIVERIES: GRACE ASPHALT 70 CUBIC YARDS 3/4 STONE HIGH DECK TRAILERS ALL LOCK AND GLASS CO WELDING TRUCK 1 FUEL TRUCK 1 PICKUP TRUCKS 6 LIGHT TOWERS 5 SITE MULE 3 IDUMP TRUCKS 10 WHEEL DUMPTRUCK •LIGHT TOWERS USED FOR 2 HOURS FLASHING ARROW BOARD OFFICE TRAILER/GENER. 1 CARGO BOXES 3 FLAT TRUCK 1 •NOTE TRUCK 66 RAN 2 LOADS OF STONE FROM PUMP 2 WHITESTONE TO THE SITE FtAINMAKER/GENIE LIFT

Description of Work:_______________________________________________________________________________ DELAYS: GRACE 750,3750,1200 GATEWAY 550G S, MAZZOCH11200 FROM 7AM- 11AM DUE TO__________________ PREPARING RAMP AT SLURRY WALL TO ENABLE MACHINES CROSSING INTO PIT FROM WESTSIDE HIGHWAY GATEWAY 550G DELAYED 1 PM- 4PM WITH RECOVERY AT AMEC ROAD GRACE 1200 DELAYED 1PM-2:15PM DUE TO YONKERS BURNERS BURNING CANDLESTICKS THAT WERE NOT AUTHORIZED TO BURN IN THAT AREA_______________________________________________________________ CONTINUED REMOVING DEBRIS FROM NORTH HALL ROAD AND LOWER LEVELS OF TOWER 1 TO ACCOMMODATE NEW BRIDGE.___________________________________________________________________________________ MANNED WATERING STATIONS FOR DUST CONTROL MAINTAINED TRAFFIC INTO AND OUT OF AREA_______________________________________________________ LOADS OUT: 33_________________________________________________________________________________ EUKESOUT: 132

GRACE CONTRACTING CORP Approved By: Tiriy For: SUPERINTENDENT

DAILY WORK FORCE REPORT0116D.xls 02.214646

CITY_21MC100_010209361

NYC-WTC_000342298

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000342298Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000356548

Day final daily workforce and equipment roster for World Trade site, Jan 16, 2002.

Similar indexed content

Compare copies and versions →